【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
查看试卷,进入试卷练习
微信扫一扫,开始刷题

答案
AB
解析
暂无解析
相关试题
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
【多选题】
As part of a multisite Single Sign-On (SSO) deployment what two steps are required to ensure that a change to one Single Sign-On instance is propagated to the other instances? (Choose two.)___
A. Schedule a Replication Task on the primary instance
B. Select the first instance during the installation of subsequent instances
C. During the installation of each instance choose Linked-Mode
D. Enable Synchronize to Active Directory on each instance
【多选题】
You need to add an object to an existing vApp using the vSphere Web Client. How is this accomplished?___
A. Create an Object Inside the vApp.
B. Add an Object to a vApp.
C. Add an Object to the
D. atastore the vApp is located in.
【多选题】
Which three steps must be taken to use vSphere Update Manager 6.x to upgrade an ESXi 5.5 host to vSphere 6.x? (Choose three.)___
A. Download an ESXi Image.
B. Configure the vSphere Update Manager Download Service.
C. Create a baseline and attach it to the ESXi Host.
D. Scan the vCenter Content Library for the
E. SXi Image.
【多选题】
Which two options would allow a database administrator, with no access to the vSphere infrastructure, to connect to a virtual machine? (Choose two.)___
A. Use the Virtual Machine Remote Console (VMRC).
B. Use Remote Desktop Protocol (RDP) to connect.
C. Ask the vSphere administrator to grant permission to access the console through vCenter Server.
D. Ask the vSphere administrator to grant permission to access with the Horizon View Direct Connect Client.
【多选题】
Which three are architecture components of vRealize Operations? (Choose three.)___
A. Identity Server
B. Administrative Server
C. Analytics Server
D. Database Server
E. Connection Broker
【多选题】
社会的物质性体现在___
A. 劳动是社会产生和存在的决定性因素
B. 在社会中不存在精神的现象和活动
C. 物质资料的产生是社会历史的前提
D. 全部社会生活在本质上是实践的
E. 社会生活中不存在物质关系以外的其他关系
推荐试题
【多选题】
差异化服务的目的是___
A. 减轻柜台压力,减少客户在网点等候时间
B. 提高ATM和自助银行的使用率
C. 提高网点的交叉销售和升级销售能力
D. 充分发挥网点服务人员的优势,做好中高端客户的服务
【多选题】
有下列情形之一的,可以从轻或减轻处理:___
A. 初次违规、过失违规且情节轻微的
B. 集体不当决策造成违规事件发生,尚未造成损失或社会不良影响的
C. 违规后认识错误态度较好,能主动检查纠正错误或交待问题,配合调查的
D. 主动赔偿经济损失或退出非法所得的
【多选题】
有下列情形之一的,可免予处理:___
A. 因不可抗力造成损失、毁损的
B. 受到暴力胁迫时行为失当,事后积极补救的
C. 业务创新发生不当行为且损害后果轻微的
D. 已尽职尽责,因国家法律、法规、宏观产业政策发生重大变化,或其他外部因素导致风险或损失,并已积极采取措施的。
【多选题】
严重违反劳动纪律,有下列哪些行为的,给予警告至撤职处分;后果或情节严重的,予以辞退或给予开除处分?___
A. 旷工或者因公外出、请假期满无正当理由逾期不归的
B.
C. 无正当理由经常迟到、早退或者擅自脱岗的
D. 故意刁难、欺骗误导客户,或服务态度恶劣被客户投诉的
【多选题】
对违规员工的经济处罚应按员工管理权限进行,一般情况,___
A. 省联社负责对省联社、市农信办员工和县级行社领导班子成员作出经济处罚决定
B. 经省联社授权,市农信办可对本级员工及辖内县级行社领导班子成员作出经济处罚决定
C. 上级机构不可对下级机构管辖员工直接作出经济处罚决定
D. 县级行社对辖属员工作出经济处罚决定
【多选题】
各级农信社机构或部门负责人有下列行为之一的,给予警告至记大过处分;后果或情节严重的,给予降级至开除处分:___
A. 超越权限决策的
B. 授意、指使、强令、胁迫下属违规办理业务
C. 违反民主决策程序,个人或少数人决定重大决策、大额资金调度、大额财务开支、大宗物品采购等重大问题,或拒不执行、擅自改变集体决定的
D. 决策不慎,重大改革方案或重大工作安排存在重大疏漏,或执行出现严重失误的
【多选题】
下列关于理财产品分类表述正确的有___
A. 固定收益类理财产品投资于存款、债券等债权类资产的比例不低于80%;
B. 权益类理财产品投资于权益类资产的比例不低于80%;
C. 商品及金融衍生品类理财产品投资于商品及金融衍生品的比例不低于80%;
D. 混合类理财产品投资于债权类资产、权益类资产、商品及金融衍生品类资产且任一资产的投资比例未达到前三类理财产品标准。
【多选题】
商业银行从事理财产品销售活动,不得有以下行为___
A. 通过销售或购买理财产品方式调节监管指标,进行监管套利
B. 在醒目位置提示投资者,“理财非存款、产品有风险、投资须谨慎”
C. 将理财产品与其他产品进行捆绑销售
D. 采取抽奖、回扣或者赠送实物等方式销售理财产品
【多选题】
关于投资者风险承受能力评估,下列说法正确的是___
A. 商业银行对超过65岁的投资者进行风险承受能力评估时,应当充分考虑投资者年龄、相关投资经验等因素;
B. 商业银行完成投资者风险承受能力评估后应当将风险承受能力评估结果告知投资者,由投资者签名确认后留存;
C. 超过一年未进行风险承受能力评估或发生可能影响自身风险承受能力情况的投资者,再次购买理财产品时,应当在商业银行网点或其网上银行完成风险承受能力评估;
D. 商业银行应当在投资者风险承受能力评估书中明确提示,如投资者发生可能影响其自身风险承受能力的情形,再次购买理财产品时应当主动要求商业银行对其进行风险承受能力评估。
【多选题】
关于理财销售管理的规定,下列说法正确的是___
A. 商业银行不得通过电视、电台、互联网等渠道对具体理财产品进行宣传,本行渠道(含营业网点和电子渠道)除外;
B. 商业银行通过电话、传真、短信、邮件等方式开展理财产品宣传时,如投资者明确表示不同意,商业银行不得再通过此种方式向投资者开展宣传理财产品;
C. 商业银行销售风险评级为四级以上理财产品时,除非与投资者书面约定,否则应当在商业银行网点进行;
D. 对于单笔投资金额较大的投资者,商业银行应当在完成销售前将销售文件至少报经商业银行分支机构销售部门负责人审核或其授权的业务主管人员审核.
【多选题】
符合下列哪些条件的自然人、法人或者依法成立的其他组织是合格投资者___
A. 具有2年以上投资经历,且满足家庭金融净资产不低于300万元人民币;
B. 具有2年以上投资经历,且家庭金融资产不低于500万元人民币,或者近3年本人年均收入不低于40万元人民币;
C. 最近1年末净资产不低于1000万元人民币的法人或者依法成立的其他组织;
D. 国务院银行业监督管理机构规定的其他情形。
【多选题】
商业银行应当建立异常销售的监控、记录、报告和处理制度,重点关注理财产品销售业务中的不当销售和误导销售行为,异常情况包括___。
A. 投资者频繁开立、撤销理财账户;
B. 投资者风险承受能力与理财产品风险不匹配;
C. 商业银行超过约定时间进行资金划付;
D. 其他应当关注的异常情况。
【多选题】
销售人员在为投资者办理购买理财产品手续前,应当特别注意的事项有___。
A. 有效识别投资者身份;
B. 向投资者介绍理财产品销售业务流程、收费标准及方式等;
C. 了解投资者风险承受能力评估情况、投资期限和流动性要求;
D. 提醒投资者阅读销售文件,特别是风险揭示书和投资者权益须知;
E. 确认投资者抄录了风险确认语句。
【多选题】
销售人员从事理财产品销售活动,下列情形是违规的___。
A. 在销售活动中为自己或他人牟取不正当利益,承诺进行利益输送,通过给予他人财物或利益,或接受他人给予的财物或利益等形式进行商业贿赂;
B. 诋毁其他机构的理财产品或销售人员;散布虚假信息扰乱市场秩序;
C. 违规接受投资者全权委托,私自代理投资者进行理财产品认购、赎回等交易;
D. 违规对投资者做出盈亏承诺,或与投资者以口头或书面形式约定利益分成或亏损分担;
E. 挪用投资者交易资金或理财产品、擅自更改投资者交易指令
【多选题】
商业银行对理财产品进行风险评级的依据包括下列哪些因素___
A. 理财产品投资范围、投资资产和投资比例
B. 理财产品期限、成本、收益测算
C. 本行开发设计的同类理财产品过往业绩
D. 理财产品在运营过程中存在的各类风险
【多选题】
理财产品宣传销售文本应当全面、客观反映理财产品的重要特性和与产品有关的重要事实,语言表述应当真实、准确和清晰,不得有下列情形___
A. 虚假记载、误导性陈述或者重大遗漏
B. 违规承诺收益或者承担损失;
C. 夸大或者片面宣传理财产品,违规使用“安全、”“保证、”“承诺、”“保险、”“避险、”“有保障、”“高收益、”“无风险”等与产品风险收益特性不匹配的表述;
D. 登载单位或者个人的推荐性文字;
E. 在未提供客观证据的情况下,使用“业绩优良”、“名列前茅”、“位居前列”、“最有价值”、“首只”、“最大”、“最好”、“最强”、“唯一”等夸大过往业绩的表述
【多选题】
三要素决定基本存款账户的唯一性,应当在结算账户管理系统中准备录入信息,对唯一性进行审核。该三要素为___。
A. 企业名称
B. 统一社会信用代码
C. 存款人类别
D. 注册地区代码
E. 注册地址
【多选题】
存在下列哪种情形的,银行应当拒绝开户。___
A. 使用伪造、变造开户证明文件
B. 假冒他人身份或虚构代理关系
C. 经核实注册地址不存在或虚构经营场所
D. 对企业身份信息存疑需要提供辅助证件,企业决绝出示
E. 被市场被市场监督管理部分列入“严重违法失信企业名单”
【判断题】
已经封存的尾箱需要重新分配给其他柜员时,机构库管先通过【7315尾箱账号维护】交易启用后,使用【7316】交易,操作标志选择领用,领用柜员录入其柜员代号及密码,完成尾箱领用。
A. 对
B. 错