【单选题】
British Cabinet works on the principle of .
A. A. collective responsibility
B. B. individual responsibility
C. C. defending the collectivism
D. D. defending the individuals
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
A
解析
暂无解析
相关试题
【单选题】
The main duty of the British Privy Council is to .
A. A. make decisions
B. B. give advice
C. C. pass bills
D. D. supervise the Cabinet
【单选题】
is the first African-American winner of the Nobel Prize for Literature.
A. A.Ralph Ellison
B. B. Tony Morrison
C. C. Richard Wright
D. D. James Baldwin
【单选题】
Of the following writers, is Not a Nobel Prize winner.
A. A. Alice Walker
B. B. Ernest Hemingway
C. C. William Faulkner
D. D. Eugene O’Neil
【单选题】
Of the following books, is NOT written by Ernest Hemingway.
A. A. The Sun Also Rises
B. B. The Sound and the Fury
C. C. A Farewell to Arms
D. D. For Whom the Bell Tolls
【单选题】
F. Scott Fitzgerald’s finest novel is , and its theme is about
A. A. The Great Gatsby, the American Dream
B. B. Tender is the Night, love
C. C. Tales of the Jazz Age, the loss of oneself
D. D. The Beautiful and the Damned, the evil of human nature
【单选题】
Of the following writers, is NOT included in the group of naturalists.
A. A. Stephen Crane
B. B. Frank Norris
C. C. Theodore Dreiser
D. D. Herman Melville
【单选题】
Of the following, is NOT characteristic of Mark Twain’s works.
A. A. colloquial speech
B. B. a sense of humor
C. C. a realistic view
D. D. an idealistic view
【单选题】
Of the following, is considered Herman Melville’s masterpiece.
A. A. The Last of the Mohicans
B. B. The Legend of Sleepy Hollow
C. C. Moby Dick
D. D. Daisy Miller
【单选题】
Of the following, is NOT Nathaniel Hawthorne’s work.
A. A. The Scarlet Letter
B. B. The House of the Seven Gables
C. C. The Marble Faun
D. D. Nature
【单选题】
is regarded as “the father of American literature”.
A. A. James Fennimore Cooper
B. B. Ralph Waldo
C. C. Thomas Jefferson
D. D. Washington Irving
【单选题】
Of the following writers, are from the Colonial and Revolutionary Periods.
A. A. Benjamin Franklin & Edgar Ellen Poe
B. B. Edgar Ellen Poe & Jonathan Edwards
C. C. Benjamin Franklin & Jonathan Edwards
D. D. Edgar Ellen Poe & Washington Irving
【单选题】
The National Day of the United States falls on .
A. A. June 4th
B. B. July 4th
C. C. June 14th
D. D. July 14th
【单选题】
Of the following, is NOT among the three major radio and TV networks in America.
A. A. the National Broadcasting System (NBS)
B. B. the Public Broadcasting Service (PBS)
C. C. the Columbia Broadcasting System (CBS)
D. D. the American Broadcasting System (ABS)
【单选题】
is sold especially to the upper or upper-middle class and it has a reputation for its serious attitude and great bulk.
A. A. The Washington Post
B. B. The New York Times
C. C. Los Angeles Times
D. D. New York Daily News
【单选题】
Of the following universities, has NOT cultivated any American President yet.
A. A. Harvard University
B. B. Massachusetts Institute of Technology
C. C. Princeton University
D. D. Yale University
【单选题】
To get a bachelor’s degree, all undergraduate students are required to do the following except .
A. A. attending lectures and completing assignments
B. B. passing examinations
C. C. working for communities
D. D. earning a certain number of credits
【单选题】
Of the following, is NOT the responsibility of the board of trustees in U. S. institutions.
A. A. choosing the president
B. B. establishing policies for administrators and faculty
C. C. approving budget and other financial project
D. D. decide which student to enroll
【单选题】
Of the following, are NOT among the categories of American higher education.
A. A. universities and colleges
B. B. research institutions
C. C. technical institutions
D. D. community colleges
【单选题】
Higher education in the United States began with the founding of
A. A. Yale University
B. B. Harvard University
C. C. Princeton University
D. D. New York University
【单选题】
Of the following subjects, are NOT offered to elementary school students.
A. A. mathematics and languages
B. B. politics and business education
C. C. science and social studies
D. D. music and physical education
【单选题】
Formal education in the United States consists of , secondary and higher education.
A. A. kindergarten
B. B. public
C. C. elementary
D. D. private
【单选题】
At present, U. S. exports account for of the world’s total.
A. A. 10%
B. B. 15%
C. C. 20%
D. D. 25%
【单选题】
is not one of the three giants in American automobile industry.
A. A. Ford
B. B. General Motors
C. C. Chrysler
D. D. American Motors
【单选题】
The following statements are all true except .
A. A. Agribusinesses reflect the big, corporate nature of many farm enterprises.
B. B. Agribusinesses maintain a balanced trade pattern between agricultural imports and exports.
C. C. Agribusinesses range from one-family corporations to multinational firms.
D. D. Agribusinesses include a variety of farm businesses and structures.
【单选题】
About of American crops are for export.
A. A. half
B. B. one third
C. C. one fourth
D. D. one fifth
【单选题】
President Johnson tried to build a “Great Society” by introducing various programs like the following except .
A. A. Medicare
B. B. Food Stamps
C. C. Education Initiatives
D. D. Unemployment Pension
【单选题】
The following inventions took place during the “second indThe following inventions took place during the “second industrial revolution” except .
A. A. typewriter
B. B. telephone
C. C. electric light
D. D. refrigerator
【单选题】
The first National Bank of the United States was established with the urge of .
A. A. George Washington
B. B. Thomas Jefferson
C. C. Andrew Jackson
D. D. Alexander Hamilton
【单选题】
Chartered companies were NOT granted the by the British King or Queen.
A. A. political authority
B. B. economic rights
C. C. judicial authority
D. D. diplomatic authority
【单选题】
The modern American economy progressed from to , and eventually, to .
A. A. colonial economy, handcraft economy, industrial economy
B. B. farming economy, handcraft economy, industrial economy
C. C. colonial economy, farming economy, industrial economy
D. D. handcraft economy, farming economy, industrial economy
【单选题】
America produces a major portion of the world’s products in the following fields except .
A. A. machinery
B. B. automobiles
C. C. ore
D. D. chemicals
【单选题】
The President is directly voted into office by .
A. A. all citizens of America
B. B. the citizens over 18 years old
C. C. electors elected by the voters
D. D. the senators and representatives
【单选题】
The Supreme Court is composed of justices.
A. A. six
B. B. seven
C. C. eight
D. D. nine
【单选题】
The terms for a Senator and Representative are and years respectively.
A. A. two, four
B. B. two, three
C. C. two, six
D. D. six, two
【单选题】
According to the Constitution, a candidate for President must be .
A. A. at least 35 years old
B. B. at least a 14 years’ resident of the United States
C. C. born in America
D. D. all of the above
【单选题】
The following except are all powers of the President.
A. A. vetoing any bills passed by Congress
B. B. appointing federal judges when vacancies occur
C. C. making laws
D. D. issuing executive orders
【单选题】
All the following except cannot make legislative proposal.
A. A. the Senator
B. B. the Representative
C. C. the Secretary of State
D. D. the President
【单选题】
The following except are guaranteed in the Bill of Rights.
A. A. freedom of religion
B. B. the right to get into people’s house by police
C. C. freedom of speech and of press
D. D. the right to own one’s weapon if one wishes
【单选题】
The Bill of Rights .
A. A. defines the rights of Congress and the rights of the President
B. B. guarantees citizens of the United States specific individual rights and freedoms
C. C. is part of the Declaration of Independence
D. D. has no relationship with the Constitution
【单选题】
The Constitution of the United States .
A. A. gives the most power to Congress
B. B. gives the most power to the President
C. C. tries to give each branch enough power to balance the others
D. D. gives the most power to the Supreme Court
推荐试题
【单选题】
ZH94、如果批准的变更影响到工作分解结构,范围和/或进度,则必须更新下列哪一份文件?___
A. 项目管理计划
B. 项目章程
C. 质量管理计划
D. 资源管理计划
【单选题】
ZH95、编制项目计划时,质量、成本和进度计划哪个最为重要?___
A. 成本最重要,质量次之,最后是进度计划
B. 质量最重要
C. 进度计划最重要,质量次之,最后是成本
D. 应根据不同的项目来决定
【单选题】
ZH96、项目经理必须创建项目管理计划。下列哪一项应包含进项目管理计划中?___
A. 成本绩效基准、质量控制计划、绩效报告和进度基准
B. 项目范围说明书、范围基准、进度基准和风险管理计划
C. 采购文档、工作基准结构、变更请求和质量管理计划
D. 采购管理计划、成本绩效基准、质量绩效报告和采购文档
【单选题】
ZH97、一名项目经理被任命管理一个正在进行当中的项目。新项目经理可以在下列哪一份文件中寻找基准方面的信息?___
A. 项目管理计划
B. 项目范围说明书
C. 项目章程
D. 项目需求
【单选题】
ZH98、某项目经理将要完成一个新产品开发项目的规划过程,在进入执行过程组之前需要完成的重要里程碑是什么?___
A. 最终确定项目章程
B. 接收项目资金以开始执行
C. 获得发起人和相关方的批准
D. 执行相关方管理策略
【单选题】
ZH99、在变更控制中项目计划很重要是因为项目计划___
A. 提供了变更管理的基准线
B. 提供了有关项目业绩的信息
C. 警示项目团队在将来可能产生问题的方面
D. 被预期在项目整个过程中会变更
【单选题】
ZH100、在项目依赖外部供应商和承包商时,下列哪份文件描述了如何使用项目管理系统?___
A. 工作说明书
B. 谅解备忘录
C. 意向书
D. 项目管理计划
【单选题】
ZH101、下列哪一项工具可以帮助项目经理更有效率地执行大型复杂项目?___
A. 项目管理知识
B. 组织过程资产
C. 项目管理信息系统
D. 经验教训
【单选题】
ZH102、从风险管理的观点来看,项目因评审提供了下列哪一项机会?___
A. 让项目经理能够确定能够向团队分发多少风险应急资金
B. 能够在产品初步设计时实施纠正措施
C. 提供预期并尽可能减少未来项目风险的远见
D. 为项目经理提供下一个项目任务的初始风险登记册
【单选题】
ZH103、在项目绩效审核期间,项目经理确定由于团队绩效较差,某些活动未能按时完成。下一步采取的措施是什么?___
A. 为愿意加班的团队成员提请奖励,满足项目需求
B. 寻找可能影响团队绩效的根本原因
C. 审查进度,调整进度与当前的团队绩效相符
D. 推动培训课程,提供团队绩效
【单选题】
ZH104、项目团队满足项目工期,但却超出预算。关键相关方正式验收可交付成果,且项目团队完成了事后审查,项目团队应该创建哪一份报告?___
A. 项目管理报告
B. 项目收尾报告
C. 成本和利润报告
D. 最终状态报告
【单选题】
ZH105、在项目的结束会上,谁应负责签署项目完工协议?___
A. 项目发起人和项目经理
B. 客户和项目发起人
C. 供应商和项目经理
D. 客户和项目经理
【单选题】
ZH106、一名团队成员主管询问项目经理获得项目资源的职权,项目经理可以通过向主管提供下列哪一项来验证他们拥有适当的职权?___
A. 人力资源计划
B. 项目章程
C. 工作分解结构
D. 沟通计划
【单选题】
ZH107、资源经理询问项目经理的角色和职责以及项目目的,项目经理应向资源经理提供下列哪一份文件?___
A. 人力资源计划
B. 工作说明书
C. 商业论证
D. 项目章程
【单选题】
ZH108、在计划某个系统实施时,项目经理遇到一个不满意的职能经理。职能经理质疑项目经理继续执行项目的权利。项目经理应向职能经理提供下列哪一份文件?___
A. 项目章程
B. 项目管理计划
C. 项目范围说明书
D. 组织结构图
【单选题】
ZH109、公司任命一名项目经理管理一个新项目。项目经理可使用下列哪能一项作为制定项目管理计划的依据?___
A. 项目管理计划(更新)
B. 需求管理计划
C. 项目章程
D. 工作分解结构
【单选题】
ZH110、项目经理拥有一份在项目开始时由不同相关方提供的成功标准清单.项目经理对于如何排列这些成功标准的优先顺序感到不确定,并且明天必须在会上陈述项目章程.项目经理接下来应该怎么做?___
A. 与发起人核对项目成功标准,并将其添加到项目章程中
B. 在下一次项目会议上,与相关方讨论成功标准
C. 在项目章程中列出所有成功标准
D. 选择其中一个成功标准,并将其包含在项目章程中
【单选题】
ZH111、一家公司的首席技术官宣布将开发一项创新的新产品,并要求项目经理提供一份产品开发的计划,项目经理下一步该怎么做?___
A. 定义活动
B. 制定项目计划
C. 指定项目管理计划
D. 制定项目章程
【单选题】
ZH112、下列关于项目章程的哪种说法最合适?___
A. 强化职能经理在组织中的职权
B. 提供项目经理所需资源
C. 具体化项目所用资源
D. 强调每天的职责
【单选题】
ZH113、公司中标一份合同,项目经理收到执行该合同的通知。若要开始项目,必须首先要求哪一份文件确定?___
A. 项目章程
B. 工作说明书
C. 招标技术规范
D. 工作分解结构
【单选题】
ZH114、项目经理对一项新服务有个创意,能让其公司在一个新细分市场中开展业务。经过咨询、联网、市场分析和项目评估后,项目经理认为存在进一步定义该项新服务创意的基础。项目经理接下来应该怎么做?___
A. 识别风险
B. 收集要求
C. 定义高层次范围
D. 创建工作分解结构
【单选题】
ZH115、项目章程包括下列哪一项?___
A. 项目预算的汇总
B. 详细的产品范围
C. 范围基准
D. 项目管理计划
【单选题】
ZH116、项目经理正与一名承认未使用章程的同事讨论项目章程。为了向同事说明项目章程的重要性,项目经理表明项目章程和重要,因为项目章程的批准即意味着下列哪一项?___
A. 启动阶段正式开始
B. 执行阶段正式开始
C. 详细需求清单的正式批准
D. 项目的正式授权
【单选题】
ZH117、下列哪一项属于结束采购过程的工具和技术?___
A. 专家判断
B. 绩效报告
C. 合同变更控制系统
D. 协商解决
【单选题】
ZH118、执行过程组的主要目标是什么?___
A. 跟踪并审查项目进度
B. 管理利害关系者的期望
C. 满足项目规范
D. 监控进度表
【单选题】
ZH119、一家公司检阅了四个战略性创收方案,并从中选择其一,若要正式开始项目,下一步应是什么?___
A. 定义范围
B. 估算成本和进度
C. 制定项目管理计划
D. 创建项目章程
【单选题】
ZH120、一名团队成员最近被提升为项目经理,被任命管理一个200万美元的项目。部门经理安排召开会议,在两个星期内评审项目章程。项目经理下一步应该怎么做?___
A. 制定项目范围说明书。
B. 与项目发起人会面,确定商业需求。
C. 与团队成员安排一次项目启动大会。
D. 与项目相关方一起评审项目管理计划。
【单选题】
ZH121、政府监督机构要求各公司遵守的强制性要求.这些要求必须在某个设定日期满足,否则将遭到罚款.为响应该要求,公司启动一个项目并任命了项目经理.项目发起人向项目经理提供了工作说明书和商业论证.项目经理接下来应处理下列哪一个过程?___
A. 制定项目章程
B. 制定项目管理计划
C. 收集需求
D. 制定项目进度表
【单选题】
ZH122、项目经理会见了一个主要利益相关方,该利益相关方坚持认为,应在某日期完成项目,以便及时安排产品生产并参加某个贸易展览会,利益相关方还认为产品必须达到现行国际安全标准,只有接受这两个条件,利益相关方才能提供所需启动资金。项目经理应将这些条件纳入下列那一项?___
A. 项目主要里程碑
B. 项目合同摘要
C. 项目概括性需求
D. 项目推出标准
【单选题】
ZH123、在项目启动阶段,项目经理了解到还未签署正式项目合同。项目经理接下来应该做什么?___
A. 与项目发起人协商。
B. 停止项目。
C. 咨询项目相关方。
D. 与高级管理层协商。
【单选题】
ZH124、项目经理在与项目相关方一起评审项目章程。该过程的下一步是什么?___
A. 获得项目章程批准
B. 制定工作分解结构
C. 组建项目团队
D. 制定项目初级说明书
【单选题】
ZH125、在制定项目章程的过程中,项目经理确认了许多可能性很高的风险,并认为项目将会失败。适当的下一步措施是什么?___
A. 停止为项目工作,因为风险太高
B. 停止制定项目章程,开始制定风险管理计划
C. 继续制定项目章程,并开始制定风险管理计划
D. 继续制定项目章程,然后与项目相关方一起审查项目章程
【单选题】
ZH126、一家医院希望实施一个病例系统。一家顾问公司的项目经理将制作项目章程。项目经理需要下列哪一项来制作项目章程?___
A. 项目工作说明书和组织过程资产。
B. 项目工作说明书和过程改进计划
C. 事业环境因素和质量管理计划
D. 商业论证和风险管理计划
【单选题】
ZH127、项目经理将公司的基础设施识别为项目章程的一项可能输入依据,为获得技术资料并分析公司的基础设施,项目经理与一个外部专家组开会,项目经理使用的是什么技术?___
A. 检查技术
B. 德尔菲技术
C. 参数估算
D. 专家判断
【单选题】
ZH128、项目团队正在从客户和项目相关方那里收集所有需求和项目范围。负责该项目的项目经理正在尝试完成项目章程。项目经理应该使用下列哪一项工具和技术?___
A. 范围分解
B. 专家判断
C. 活动排序
D. 项目进度安排
【单选题】
ZH129、已经确定了总体里程碑计划和总体预算,那么项目处于哪个管理过程组?___
A. 启动
B. 规划
C. 执行
D. 监控
【单选题】
ZH130、项目的挣值(EV)为1,530美元,计划价值(PV)1,630美元,团队成员建议去除一个可交付成果,有助于改善项目进度,并积极影响关键路径,记录这些详情后,项目经理应该进行下列那一项活动?___
A. 提交变更请求
B. 重新计算PV
C. 更改项目管理计划
D. 进行储备分析
【单选题】
QS1、若要确定偏差、缺陷或风险的基本潜在原因,应使用下列哪一项分析技术?___ ——(第六版最新全套机密真题及详细解释,请私加微信yoyosun2019)
A. 根本原因分析
B. 进度基准分析
C. 成本偏差分析
D. 问题分析
【单选题】
QS2、了解光环效应非常重要,因为有这样一种趋势:___
A. 内部提拔
B. 聘用最优秀的
C. 提拔那些在某技术领域优秀的人作为项目经理
D. 提拔那些受过项目管理培训的人作为项目经理
【单选题】
QS3、在项目的什么时间点,项目经理将会审查控制措施?___
A. 在计划编制阶段
B. 在启动和执行阶段
C. 在项目过程中持续审查
D. 在项目收尾阶段