【单选题】
An administrator is installing vCenter Server for an environment that has 40 ESXi 6.x Hosts and 150 virtual machines. Which database would meet the minimal requirements needed for this task? ___
A. vFabric Postgres
B. Microsoft SQL Express 2008
C. Microsoft SQL Server 2014
D. Oracle 11g
查看试卷,进入试卷练习
微信扫一扫,开始刷题

答案
A
解析
暂无解析
相关试题
【单选题】
What is a requirement when enabling a Virtual SAN cluster in an existing High Availability (HA) and Distributed Resource Scheduler (DRS) Cluster? ___
A. Disable DRS and HA before enabling Virtual SAN
B. Enable DRS before enabling Virtual SAN
C. Disable HA before enabling Virtual SAN
D. Enable Storage DRS before enabling Virtual SAN
【单选题】
The vSphere administrator attempts to connect to an ESXi host via an SSH client and receives the following security alert: The vSphere administrator needs to determine whether the RSA key fingerprint shown in the security alert is the fingerprint of the intended ESXi host. Which tool should the vSphere administrator use? ___
A. Direct Console User Interface
B. vSphere Client
C. vSphere Web Client
D. vSphere Management Assistant
【单选题】
An administrator needs to monitor traffic on vSwitches in a vSphere 6.x environment. Which option, if configured, would accomplish this task? ___
A. Forged Transmits
B. MAC Address Changes
C. Promiscuous Mode
D. Notify Switches
【单选题】
What is true regarding datastores on ESXi 6.x? ___
A. NFS 4.1 datastore does not support Fault Tolerance (FT)
B. VMFS3 and VMFS5 datastores can be newly created
C. NFS datastore can be concurrently mounted using NFS 4.1 on one host and NFS on another
D. NFS 3.0 datastore does not support Fault Tolerance (FT)
【单选题】
An administrator is cloning and configuring five new web server virtual machines. What would be the benefit of configuring resource shares for the new VMs? ___
A. To prioritize access to a resource during contention.
B. To guarantee access to a resource during contention.
C. To prioritize access to a resource before contention occurs.
D. To guarantee access to a resource before contention occurs.
【单选题】
An administrator logs into the vSphere Web Client and sees the warning shown in the Exhibit. During a change control window, the warning was addressed. What should be done to verify that the host is no longer showing the warning? ___
A. Run a Remediate host operation.
B. Recheck the compliance of the host.
C. Restart the host to get rid of the warning.
D. Install VMware tools to clear the warning.
【单选题】
A vApp named Sales has a Memory Limit of 32 GB and a CPU Limit of 12,000 MHz. There are three virtual machines within the vApp: <Sales-DB -- Has a memory reservation of 20 GB. > <Sales-DC -- Has a memory reservation of 8 GB. > <Sales-Web -- Has a memory reservation of 8 GB.> Which statement is correct? ___
A. All three virtual machines can power on, but will have memory contention.
B. All three virtual machines can power on without memory contention.
C. Only two of the three virtual machines can power on.
D. Only one of the virtual machines can power on.
【单选题】
You are editing the management network configuration of an ESXi 6.x Host from the vSphere Web Client. You mistakenly put the incorrect VLAN in place for the management network. What action do you need to take to correct this? ___
A. You need to manually edit the configuration on the host with command line utilities.
B. No action is required. By default ESXi rolls back configuration changes that disconnect the host.
C. The ESXi host system configuration will need to be restored to the factory configuration to fix the issue.
D. The change can be reverted in the vSphere Web Client by simply editing the switch again.
【单选题】
What is true about resource pools created on a Distributed Resource Scheduler (DRS) cluster?___
A. A root resource pool is created with the specified values.
B. A root resource pool is automatically created using the aggregate total of the ESXi host resources in the cluster.
C. A root resource pool is automatically created using the aggregate total of all resources in the datacenter.
D. A root resource pool is not needed when creating resource pools on a DRS cluster.
【单选题】
An administrator attempts to enable Enhanced vMotion Compatibility (EVC) on a cluster. The operation results in a compatibility error, as shown in the exhibit. What is the likely cause of this error? ___
A. The CPUs in the ESXi host are not AMD CPUs.
B. The CPUs in the ESXi host do not support hardware virtualization capabilities.
C. The XD/NX CPU features have not been enabled in the BIOS of the server.
D. There is no shared storage between the hosts in the cluster.
【单选题】
What condition would prevent an administrator from creating a new VMFS3 datastore on an ESXi 6.x host using the vSphere Web Client? ___
A. A VMFS3 datastore cannot be created on an ESXi 6.x host.
B. The VMFS3 kernel module is not loaded.
C. A VMFS3 datastore cannot be mounted on an ESXi 6.x host.
D. VMFS3 datastores are not compatible with virtual machines created on an
E. SXi 6.x host.
【单选题】
During a new vSphere Distributed Switch configuration, where does the Maximum Transmission Unit (MTU) value get modified? ___
A. Uplink Settings
B. Switch Settings
C. Portgroup Settings
D. NIC Teaming Settings
【单选题】
A small company wants to use VMware products for its production systems. The system administrator needs to recommend a solution that will deliver High Availability to the company's production applications. What is minimum vSphere offering that will support this requirement? ___
A. vSphere Essentials
B. vSphere Essentials Plus
C. vSphere Hypervisor
D. vSphere Standard
【单选题】
Which scenario shows a reason for VMware Tools failing to install? ___
A. Virtual machine has a CD-ROM configured.
B. Guest OS Antivirus is blocking the VMware Tools installation.
C. Guest OS has 64-bit ldd (list dynamic dependencies) utility installed.
D. Virtual machine is powered on.
【单选题】
An administrator is configuring an ESXi 6.x host to use multiple NICs to resolve a management network redundancy error. After configuring a second NIC, the server is not able to communicate when the primary connection is taken down. The administrator analyzes the Exhibit shown here. Based on the exhibit, what is the likely cause of the issue? ___
A. vmnic4 is not attached to a vSwitch.
B. vmnic2 is not connected to a physical switch.
C. E1000 is the incorrect NIC
D. river for this card.
【单选题】
What information is required as part of an interactive ESXi 6.x installation? ___
A. Keyboard layout
B. IP Address
C. Root password
D. DNS information
【单选题】
What is the default load balancing policy for a newly created VMkernel port on a vSphere Distributed Switch? ___
A. Route based on orginating virtual port ID
B. Route based on IP Hash
C. Route based on source mac address
D. Route based on physical NIC load
【单选题】
An administrator deploys vCenter Server using the embedded Platform Services Controller. After testing the deployment for a couple of months, it is determined that the environment would be better served with an external Platform Services Controller. What should the administrator do to meet this new requirement? ___
A. Deploy a fresh instance of vCenter Server with an external Platform Services Controller.
B. Perform a fresh install of an external Platform Services Controller.
C. Migrate the embedded Platform Services Controller to an external Platform Services Controller.
D. Upgrade the embedded Platform Services Controller to an external Platform Services Controller.
【单选题】
Why are some virtual machines orphaned after rebooting a High Availability (HA) enabled host? ___
A. The Orphaned virtual machines have HA restart disabled.
B. The Orphaned virtual machines moved recently and the change did not persist.
C. The host is attached to failed storage.
D. The host just came out of maintenance mode.
【单选题】
Which vSphere 6 Standard Edition feature will allow an organization to ensure that critical multi-threaded applications have the maximum possible uptime? ___
A. Fault Tolerance
B. High Availability
C. Distributed Resource Scheduler
D. App HA
【多选题】
An application running in a virtual machine is experiencing performance issues. When utilizing performance monitoring utilities, it is noted that the CPU Utilization of the application is at 100%. Which two scenarios are probable causes of the CPU contention for the application? (Choose two.)___
A. There is a network I/O constraint.
B. There is a storage I/O constraint.
C. There is insufficient disk space assigned to the virtual machine.
D. The application is not virtualization aware.
【多选题】
A Fault Tolerance (FT) virtual machine with four vCPUs is experiencing high latency when performing ICMP and Application tests. What are three potential causes that may be attributing to this latency? (Choose three.)___
A. The FT network has insufficient bandwidth and is running on a 1GB Link.
B. The FT network is on a particularly high latency link.
C. The FT network has been configured with Network I/O Control.
D. The FT virtual machine is running an e1000 network adapter.
E. The
F. T virtual machine is running on poor performing network-based storage.
【多选题】
A virtual machine is experiencing performance issues. The following performance metrics are observed: <CPU usage value for the virtual machine is above 90%> < CPU ready value for the virtual machine is above 20%> Which two activities will likely resolve the performance issues? (Choose two.)___
A. Set a CPU reservation for the virtual machine.
B. Increase the CPU limit on the virtual machine.
C. Decrease CPU shares equally for all virtual machines on the host.
D. Increase CPU shares equally for all virtual machines on the host.
【多选题】
An administrator is upgrading a vSphere Distributed Switch. The existing switch is version 6.0 and the administrator wants to upgrade to the latest version possible. The environment contains several ESXi 6.1 hosts. Which two options are available to ensure that the upgraded switch will be compatible with these hosts? (Choose two.)___
A. Upgrade the vSphere Distributed Switch to 6.0
B. Upgrade the ESXi 5.5 hosts to version 6.0, then upgrade the vSphere Distributed Switch to 5.5
C. Upgrade the vSphere Distributed Switch to 5.1
D. Upgrade the
E. SXi host switches to 5.5, then upgrade the vSphere Distributed Switch to 5.5
【多选题】
An administrator attempts to create a Thick Provisioned Virtual Disk (VMDK) on an NFS datastore; but it fails. Which two reasons would explain the failure? (Choose two.)___
A. Datastore is on an NFS 3 storage server that does not support Hardware Acceleration
B. Datastore is on an NFS 4.1 storage server
C. Only VMFS datastores support "Thick Provisioned" VMDK
D. The NFS datastore was not created on a "Thick Provisioned" device
【多选题】
Which two NFS Protocol versions does vSphere 6 support? (Choose two.)___
A. Version 3
B. Version 3.1
C. Version 4
D. Version 4.1
【多选题】
Which three operations occur during a cold migration of a virtual machine? (Choose three.)___
A. The virtual machine disks are moved if the datastore is being changed.
B. The virtual machine is registered with the destination server.
C. The source virtual machine is removed from the old hosts.
D. The virtual machine hardware is upgraded.
E. The virtual machine files are quiesced prior to the migration.
【多选题】
A 4 GB Memory virtual machine is experiencing extended memory issues, as shown in the Exhibit. What potential issues could be attributed to this memory pressure?___
A. A limit is imposed on the virtual memory of this virtual machine.
B. The Balloon driver has been uninstalled.
C. A limit has been imposed on the Virtual CPU of the virtual machine.
D. Storage IO control has been enabled for the virtual machine causing the swapped memory.
【多选题】
You are creating a virtual machine in the Web Client using the New Virtual Machine wizard. Which two steps are required? (Choose two.)___
A. Select a valid name.
B. Select a cluster for the compute resource.
C. Select a network adapter.
D. Select the virtual machine compatibility.
【多选题】
An administrator has been given requirements to configure vMotion for a new virtual machine. The configuration should: <Provide Network Redundancy Use VLAN 550> <Be secured against anyone trying to spoof communication The vSwitch1 configuration is shown in the Exhibit.> Which three changes should be made to meet the stated requirements? (Choose three.)___
A. The VLAN ID must be set appropriately.
B. The default values for MAC Address Changes and Forged Transmits must be altered.
C. The teaming and failover adapters must be set appropriately.
D. The Traffic Shaping configuration must be altered.
E. The Load Balancing Policy must be set appropriately.
【多选题】
Which three traffic types are available services options when configuring a vmkernel port? (Choose three.)___
A. Provisioning Traffic
B. Virtual Volumes Traffic
C. vSphere Replication NFC Traffic
D. Virtual SAN Traffic
E. FCoE Traffic
【多选题】
An administrator logs into the vSphere Web Client, but is unable to see any hosts and clusters. Which two options could fix the problem? (Choose two.)___
A. Verify that the client web browser and vCenter Server are in the same broadcast domain.
B. Verify that the vCenter Server system is registered with the same Platform Services Controller as the vSphere Web Client.
C. Log in to the vCenter Server as a user within the Active
D. irectory domain.
【多选题】
Which three VLAN Tagging modes are available in vSphere 6.x? (Choose three.)___
A. External Switch Tagging
B. Private VLAN Tagging
C. Virtual Switch Tagging
D. VXLAN Tagging
E. Virtual Guest Tagging
【多选题】
Which two statements are true about VMFS5 datastores on ESXi 6.x? (Choose two.)___
A. Virtual Disk (VMDK) size can be larger than 2TB.
B. Datastore extent size can be larger than 2TB.
C. Only Physical Mode Raw
D. evice Map (Passthrough-RDM) can be larger than 2TB.
【多选题】
Which two statements are correct when turning off a Distributed Resource Scheduler (DRS) Cluster? (Choose two.)___
A. The resource pool hierarchy of the DRS cluster is maintained.
B. The resource pool hierarchy of the DRS cluster is removed.
C. The affinity settings of the
D. RS cluster are removed and not maintained when DRS is re-enabled.
【多选题】
An administrator is creating a new Virtual SAN cluster on a Layer 2 network. There is an existing Virtual SAN cluster on the same Layer 2 network. Which two actions would allow the new Virtual SAN cluster to coexist with the older cluster? (Choose two.)___
A. Change the default Multicast Address on the new Virtual SAN cluster.
B. Change the default Unicast Address on the new Virtual SAN Cluster.
C. Create a separate VLAN for each cluster.
D. Create an ARP Alias for the Virtual SAN VMkernel Network Adapter.
【多选题】
A vCenter Operations Manager 5.7 environment is upgraded to vRealize Operations. After the upgrade, the analytics services fail to start. Which three steps must be taken to resolve the problem? (Choose three.)___
A. Take the vRealize Operations cluster offline.
B. Delete the activity persistence files.
C. Bring the cluster back online.
D. Remove any unresponsive nodes.
E. Stop the CaSA service.
【多选题】
An organization has an ESXi 6.x host that contains two resource pools. The host is being relocated to a DRS cluster. What two actions can be taken to integrate the host into the cluster, and what would happen to the existing ESXi resource pool hierarchy as a result? (Choose two.)___
A. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be deleted.
B. Create a resource pool for the ESXi host's virtual machines and resource pools. The resource pools present on the host will be deleted.
C. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be preserved.
D. Create a resource pool for the
E. SXi host's virtual machines and resource pools. The resource pools present on the host will be preserved.
【多选题】
Which two parameters are required when adding an iSCSI target to an iSCSI Software Adapter using Dynamic Discovery? (Choose two.)___
A. The iSCSI device's IP Address or Fully Qualified Domain Name
B. The Port Number
C. The iSCSI device's iSCSI Qualified Name (IQN)
D. The Default Gateway IP Address
【多选题】
Which two SMTP Notification Event Details are specific to alarms triggered by events? (Choose two.)___
A. User Name
B. Summary
C. Old Status
D. Target
推荐试题
【单选题】
根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)的规定,关于金属门窗套工程量计算,说法正确的是___
A. 按设计图示尺寸以长度计算
B. 按设计图示尺寸以投影面积计算
C. 按设计图示尺寸以展开面积计算
D. 并入门窗工程量不另计算
【单选题】
根据《房屋建筑与装饰工程工程量计算规范》(GB50854--2013)的规定,保温隔热墙的工程量应___。
A. 按设计图示尺寸以体积计算
B. 按设计图示尺寸以面积计算
C. 按设计图示以墙体高度计算
D. 按设计图示以墙体中心线长度计算
【单选题】
根据《建筑工程建筑面积计算规范》(GB/T50353~2013)的规定,围护结构不垂直于平面的楼层,其建筑面积___。
A. 按其外墙结构外围水平面积计算
B. 按其顶盖水平投影面积的 1/2 计算
C. 按其结构底板水平投影面积计算
D. 按其底板面的外墙外围水平面积计算
【单选题】
根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)的规定,关于保温、隔的工程量计算,说法正确的是___。
A. 保温隔热屋面工程量按设计图示尺寸以体积计算
B. 保温隔热屋面工程量按设计图示尺寸以面积计算,扣除面积>0.3 ㎡孔洞及占位面积
C. 保温隔热墙面工程量计算时门窗洞口侧壁以及与墙相连的柱,不计入保温墙体工程量内
D. 保温隔热墙面工程量按设计图示以长度计算
【单选题】
根据《房屋建筑与装饰工程工程量计算规范》(GB50854--2013)的规定,关于墙面喷刷涂料工程量计算,说法正确的是___。
A. 按设计图示尺寸以面积计算
B. 按设计图示尺寸以单面外围面积计算
C. 按设计图示尺寸以长度计算
D. 按设计图示尺寸以质量计算
【单选题】
根据《房屋建筑与装饰工程工程量计算规范》(GB50854--2013)的规定,关于木门工量计算,说法错误的是___
A. 木质门工程量按设计图示数量计算
B. 木质连窗门工程量按设计图示洞口尺寸以面积计算
C. 木质防火门工程量按设计图示框的中心线以延长米计算
D. 木门框工程量按设计图示数量计算【答案】C
【单选题】
根据《建筑工程建筑面积计算规范》(GB/T50353--2013)的规定,某建筑物层高为 3.6m,首层有一大厅,净高 7.2m,其大厅建筑面积应按___计算。
A. 1 层
B. 1.5 层
C. 2 层
D. 2.5 层
【单选题】
某住宅建筑各层外墙结构外围水平面积均为 400 ㎡,共 6 层,该建筑中有一条与室内通的 宽 度 为 300mm 的 变 形 缝 , 缝 长 为 10m 。 根 据 《 建 筑 工 程 建 筑 面 积 计 算 规 范 》(GB/T50353--2013)的规定,该建筑物的建筑面积为___
A. 2382 ㎡
B. 2400 ㎡
C. 2403 ㎡
D. 2418 ㎡
【单选题】
根据《房屋建筑与装饰工程工程量计算规范》(GB50854--2013)的规定,土方工程量算中,虚方指未经碾压、堆积时间为___的土壤。
A. 不大于半年
B. 不小于半年
C. 不大于 1 年
D. 不小于 1 年
【单选题】
根据《房屋建筑与装饰工程工程量计算规范》(GB50854--2013)的规定,在吊顶天棚工程量计算中不扣除___。
A. 单个>0.3 ㎡孔洞所占的面积
B. 独立柱所占的面积
C. 与天棚相连的窗帘盒所占的面积
D. 检查口所占的面积
【单选题】
根据《房屋建筑与装饰工程工程量计算规范》(GB50854--2013),天棚抹灰工程量计正确的是___。
A. 应扣除间壁墙、垛所占面积
B. 带梁天棚的梁两侧抹灰面积不计算
C. 锯齿形楼梯底板抹灰按展开面积计算
D. 板式楼梯底面抹灰按水平投影面积计算
【单选题】
根据《房屋建筑与装饰工程工程量计算规范》(GB50854--2013)的规定,关于防腐涂工程量计算,说法错误的是___。
A. 按设计图示尺寸以质量计算
B. 立面防腐需扣除面积>0.3 ㎡孔洞所占面积
C. 平面防腐需扣除柱、垛所占面积
D. 按设计图示尺寸以面积计算
【单选题】
根据《混凝土结构设计规范》(GB50010-2010)的规定,设计使用年限为 100 年的环境中使用的 C30 混凝土板中,直径为 20mm 的最外层钢筋的保护层的最小厚度为___。
A. 15mm
B. 18mm
C. 20mm
D. 21mm
【单选题】
根据《房屋建筑与装饰工程工程量计算规范》(GB50854--2013)的规定,保温隔热墙的工程量应___。
A. 按设计图示尺寸以体积计算
B. 按设计图示尺寸以面积计算
C. 按设计图示以墙体高度计算
D. 按设计图示以墙体中心线长度计算
【多选题】
根据《建筑工程建筑面积计算规范》(GB/T50353--2013)的规定,关于建筑面积的计算说法正确的有___。
A. 建筑物结构层高在 2.20m 及以上者应计算全面积
B. 形成建筑空间的坡屋顶,结构层高在 2.10m 及以上的部位应计算全面积
C. 结构层高指楼面或地面结构层上表面至上部结构层上表面之间的垂直距离
D. 结构净高指楼面或地面结构层上表面至上部结构层下表面之间的垂直距离
E. 形成建筑空间的坡屋顶,结构净高在 1.20m 以下的部位不应计算建筑面积
【多选题】
根据《房屋建筑与装饰工程工程量计算规范》(GB50854--2013),砖基础工程量计算确的 有___。
A. 按设计图示尺寸以体积计算
B. 扣除构造柱所占体积
C. 扣除大放脚 T 形接头处的重叠部分
D. 内墙基础长度按内墙净长线计算
E. 外墙基础长度按外墙中心线计算【答案】ABDE
【多选题】
根据《建筑工程建筑面积计算规范》 GBT50353--2013),不计算建筑面积的项目有___
A. 屋顶的水箱
B. 建筑物内的操作平台、上料平台
C. 专用的消防钢楼梯
D. 建筑物内的设备层、管道层
E. 门厅内设置的走廊【答案】ABC
【多选题】
根据《房屋建筑与装饰工程工程量计算规范》(GB50854--2013)的规定,关于天棚工量计算,说法正确的有___。
A. 天棚抹灰工程量应扣除垛、柱所占面积
B. 采光天棚工程量按设计图示尺寸以水平投影面积计算
C. 送风口工程量按设计图示数量计算
D. 装饰网架吊顶工程量按设计图示尺寸以水平投影面积计算
E. 带梁天棚的梁两侧抹灰面积并人天棚面积内
【多选题】
根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)的规定,下列属于安文明施工中的环境保护的有___。
A. 生活垃圾清理外运
B. 施工现场临时设施的装饰装修
C. 现场施工机械设备降低噪声措施
D. 现场工人的防暑降温
E. 现场治安综合治理
【多选题】
根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)的规定,关于门窗工程量计算,说法正确的有___。
A. 金属卷帘门以樘计量时,按设计图示数量计算
B. 木门窗套以米计量时,按设计图示中心以延长米计算
C. 金属塑钢窗以平方米计量时,按设计图示洞口尺寸以面积计算
D. 窗帘以米计量时,按设计图示尺寸以成活后长度计算
E. 石材窗台板按设计图示尺寸以长度计算
【多选题】
根据《建筑面积计算规范》 GB/T50353--2013)的规定,关于形成建筑空间的坡屋顶的建筑面积的计算,说法正确的有___。
A. 结构净高小于 1.20m 的,不应计算建筑面积
B. 结构净高小于 1.20m 的,应计算 1/2 建筑面积
C. 结构净高等于 2.10m 的,应计算 1/2 建筑面积
D. 结构净高等于 2.10m 的,应计算全面积
E. 结构净高大于 2.10m 的,应计算全面积
【多选题】
根据《房屋建筑与装饰工程工程量计算规范》(GB50854--2013)的规定,关于土方工量的计算,说法正确的有___。
A. 平整场地工程量按设计图示尺寸以建筑物首层建筑面积计算
B. 挖沟槽土方工程量按设计图示尺寸以基础底面积乘以挖土深度计算
C. 挖流砂工程量按设计图示位置、界限以体积计算
D. 管沟土方工程量按设计图示以管道中心线长度计算
E. 回填方工程量按设计图示尺寸以主墙间净面积计算
【多选题】
根据《房屋建筑与装饰工程工程量计算规范》(GB50854--2013)的规定,关于金属结工程量计算,说法正确的有___。
A. 钢托架工程量按设计图示数量计算
B. 钢桁架工程量按设计图示尺寸以质量计算
C. 钢桁架工程量计算不扣除孔眼的质量
D. 钢托架工程量计算时应计入焊条、铆钉、螺栓的质量
E. 钢架桥工程量按设计图示尺寸以质量计算
【多选题】
根据《房屋建筑与装饰工程工程量计算规范》(GB50854--2013),现浇混凝土工程量算正确的有___。
A. 构造柱工程量包括嵌接墙体部分
B. 框架柱的柱高应自柱基上表面至柱顶高度计算
C. 梁工程量不包括伸入墙内的梁头体积
D. 墙体工程量包括墙垛及突出墙面部分体积
E. 无梁板按板和柱帽体积之和计算
【多选题】
根据《建设工程安全生产管理条例》,下列关于建设工程安全生产责任的说法,正确的是___。
A. 设计单位应与设计文件中注明涉及施工安全的重点部位和环节
B. 施工单位对于安全作业费用有其他用途时需经建设单位批准
C. 施工单位应对管理人员的作业人员每年至少进行一次安全生产教育培训
D. 施工单位应向作业人员提供安全防护用具和安全防护服装
E. 施工单位应自施工起重机械验收合格之日起 60 日内向有关部门登记
【多选题】
根据《建设工程安全生产管理条例》,施工单位对列入工程概算的安全作业环境及安全施 工措施所需费用,应当用于___。
A. 施工安全防护设施的采购
B. 施工机械设备的更新
C. 施工机具安全性能的检测
D. 安全施工措施的落实
E. 安全生产条件的改善
【多选题】
根 据 《建筑法》,关于建筑工程承包的说法,正确的有___。
A. 承包单位应在其资质等级许可的业务范围内承揽工程
B. 大型建筑工程可由两个以上的承包单位联合共同承包
C. 除总承包合同约定的分包外,工程分包须经建设单位认可
D. 总承包单位就分包工程对建设单位不承担连带责任
E. 分包单位可将其分包的工程再分包
【多选题】
根据《建设工程质量管理条例》建设工程竣工验收应具备的条件有___。
A. 有完整的技术档案和施工管理资料
B. 有勘察、设计、施工,监督单位分别签署的质量合格文件
C. 有施工单位签署的工程保修书
D. 有工程款结清证明文件
E. 有工程使用的主要建筑材料的进场实验报告
【多选题】
根据《建设工程质量管理条例》,关于施工单位承揽工程的说法,正确的有___。
A. 施工单位应在资质等级许可的范围内承揽工程
B. 施工单位不得以其他施工单位的名义承揽工程
C. 施工单位可允许个人以本单位的名义承揽工程
D. 施工单位不得转包所承揽的工程
E. 施工单位不得分包所承揽的工程
【多选题】
根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)的规定,下列属于安文明施工中的环境保护的有___。
A. 生活垃圾清理外运
B. 施工现场临时设施的装饰装修
C. 现场施工机械设备降低噪声措施
D. 现场工人的防暑降温
E. 现场治安综合治理
【多选题】
根据《建筑工程建筑面积计算规范》(GB/T50353--2013)的规定,关于建筑面积的计算说法正确的有___。
A. 建筑物结构层高在 2.20m 及以上者应计算全面积
B. 形成建筑空间的坡屋顶,结构层高在 2.10m 及以上的部位应计算全面积
C. 结构层高指楼面或地面结构层上表面至上部结构层上表面之间的垂直距离
D. 结构净高指楼面或地面结构层上表面至上部结构层下表面之间的垂直距离
E. 形成建筑空间的坡屋顶,结构净高在 1.20m 以下的部位不应计算建筑面积
【多选题】
根据《房屋建筑与装饰工程工程量计算规范》(GB50854--2013),砖基础工程量计算确的有___。
A. 按设计图示尺寸以体积计算
B. 扣除构造柱所占体积
C. 扣除大放脚 T 形接头处的重叠部分
D. 内墙基础长度按内墙净长线计算
E. 外墙基础长度按外墙中心线计算
【多选题】
根据《建筑工程建筑面积计算规范》 GBT50353--2013),不计算建筑面积的项目有___
A. 屋顶的水箱
B. 建筑物内的操作平台、上料平台
C. 专用的消防钢楼梯
D. 建筑物内的设备层、管道层
E. 门厅内设置的走廊
【单选题】
关于钢筋混凝土预制桩施工,说法正确的是___。
A. 基坑较大时,打桩宜从周边向中间进行
B. 打桩宜采用重锤低击
C. 钢筋混凝土预制桩堆放层数不超过2层
D. 桩体混凝土强度达到设计强度的70%方可运输
【单选题】
有关卷材防水屋面施工,下列说法中错误的是___。
A. 平行于屋脊的搭接缝应顺流水方向搭接
B. 先进行细部构造处理
C. 搭接缝宜留在沟底而不宜留在天沟侧面
D. 同一层相邻两幅卷材短边搭接缝错开不应小于500mm