【多选题】
Which three operations occur during a cold migration of a virtual machine? (Choose three.)___
A. The virtual machine disks are moved if the datastore is being changed.
B. The virtual machine is registered with the destination server.
C. The source virtual machine is removed from the old hosts.
D. The virtual machine hardware is upgraded.
E. The virtual machine files are quiesced prior to the migration.
查看试卷,进入试卷练习
微信扫一扫,开始刷题

答案
ABC
解析
暂无解析
相关试题
【多选题】
A 4 GB Memory virtual machine is experiencing extended memory issues, as shown in the Exhibit. What potential issues could be attributed to this memory pressure?___
A. A limit is imposed on the virtual memory of this virtual machine.
B. The Balloon driver has been uninstalled.
C. A limit has been imposed on the Virtual CPU of the virtual machine.
D. Storage IO control has been enabled for the virtual machine causing the swapped memory.
【多选题】
You are creating a virtual machine in the Web Client using the New Virtual Machine wizard. Which two steps are required? (Choose two.)___
A. Select a valid name.
B. Select a cluster for the compute resource.
C. Select a network adapter.
D. Select the virtual machine compatibility.
【多选题】
An administrator has been given requirements to configure vMotion for a new virtual machine. The configuration should: <Provide Network Redundancy Use VLAN 550> <Be secured against anyone trying to spoof communication The vSwitch1 configuration is shown in the Exhibit.> Which three changes should be made to meet the stated requirements? (Choose three.)___
A. The VLAN ID must be set appropriately.
B. The default values for MAC Address Changes and Forged Transmits must be altered.
C. The teaming and failover adapters must be set appropriately.
D. The Traffic Shaping configuration must be altered.
E. The Load Balancing Policy must be set appropriately.
【多选题】
Which three traffic types are available services options when configuring a vmkernel port? (Choose three.)___
A. Provisioning Traffic
B. Virtual Volumes Traffic
C. vSphere Replication NFC Traffic
D. Virtual SAN Traffic
E. FCoE Traffic
【多选题】
An administrator logs into the vSphere Web Client, but is unable to see any hosts and clusters. Which two options could fix the problem? (Choose two.)___
A. Verify that the client web browser and vCenter Server are in the same broadcast domain.
B. Verify that the vCenter Server system is registered with the same Platform Services Controller as the vSphere Web Client.
C. Log in to the vCenter Server as a user within the Active
D. irectory domain.
【多选题】
Which three VLAN Tagging modes are available in vSphere 6.x? (Choose three.)___
A. External Switch Tagging
B. Private VLAN Tagging
C. Virtual Switch Tagging
D. VXLAN Tagging
E. Virtual Guest Tagging
【多选题】
Which two statements are true about VMFS5 datastores on ESXi 6.x? (Choose two.)___
A. Virtual Disk (VMDK) size can be larger than 2TB.
B. Datastore extent size can be larger than 2TB.
C. Only Physical Mode Raw
D. evice Map (Passthrough-RDM) can be larger than 2TB.
【多选题】
Which two statements are correct when turning off a Distributed Resource Scheduler (DRS) Cluster? (Choose two.)___
A. The resource pool hierarchy of the DRS cluster is maintained.
B. The resource pool hierarchy of the DRS cluster is removed.
C. The affinity settings of the
D. RS cluster are removed and not maintained when DRS is re-enabled.
【多选题】
An administrator is creating a new Virtual SAN cluster on a Layer 2 network. There is an existing Virtual SAN cluster on the same Layer 2 network. Which two actions would allow the new Virtual SAN cluster to coexist with the older cluster? (Choose two.)___
A. Change the default Multicast Address on the new Virtual SAN cluster.
B. Change the default Unicast Address on the new Virtual SAN Cluster.
C. Create a separate VLAN for each cluster.
D. Create an ARP Alias for the Virtual SAN VMkernel Network Adapter.
【多选题】
A vCenter Operations Manager 5.7 environment is upgraded to vRealize Operations. After the upgrade, the analytics services fail to start. Which three steps must be taken to resolve the problem? (Choose three.)___
A. Take the vRealize Operations cluster offline.
B. Delete the activity persistence files.
C. Bring the cluster back online.
D. Remove any unresponsive nodes.
E. Stop the CaSA service.
【多选题】
An organization has an ESXi 6.x host that contains two resource pools. The host is being relocated to a DRS cluster. What two actions can be taken to integrate the host into the cluster, and what would happen to the existing ESXi resource pool hierarchy as a result? (Choose two.)___
A. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be deleted.
B. Create a resource pool for the ESXi host's virtual machines and resource pools. The resource pools present on the host will be deleted.
C. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be preserved.
D. Create a resource pool for the
E. SXi host's virtual machines and resource pools. The resource pools present on the host will be preserved.
【多选题】
Which two parameters are required when adding an iSCSI target to an iSCSI Software Adapter using Dynamic Discovery? (Choose two.)___
A. The iSCSI device's IP Address or Fully Qualified Domain Name
B. The Port Number
C. The iSCSI device's iSCSI Qualified Name (IQN)
D. The Default Gateway IP Address
【多选题】
Which two SMTP Notification Event Details are specific to alarms triggered by events? (Choose two.)___
A. User Name
B. Summary
C. Old Status
D. Target
【多选题】
Which two High Availability ___ Cluster admission control policies can help avoid resource fragmentation? (Choose two.)(AC)
A. Define failover capacity by static number of hosts
B. Define failover capacity by reserving a percentage of the cluster resources
C. Use dedicated failover hosts
D. Use Virtual Machine Monitoring
【多选题】
An attempt to enable vSphere Fault Tolerance for a powered-on virtual machine fails. Which two scenarios would result in this failure? (Choose two.)___
A. The virtual machine has three vCPUs configured.
B. The host on which the virtual machine is running has insufficient memory resources.
C. The virtual machine has insufficient resources to accommodate full reservation plus the overhead memory.
D. VMware High Availability is enabled on the cluster of which this host is a member.
【多选题】
A vApp template recently added to a Content Library is not displayed. Which two actions could correct this problem? (Choose two.)___
A. Manually synchronize the library
B. Select the Download all library content immediately option
C. Select the Sync subscribed library option
D. Manually download the vApp template
【多选题】
What are three valid disk configurations for the vSphere Data Protection 6.x Appliance? (Choose three.)___
A. 500GB
B. 1TB
C. 1.5TB
D. 2TB
E. 4TB
【多选题】
Which three connection types are available when configuring a vSwitch in the vSphere Web Client? (Choose three.)___
A. VMkernel Network Adapter
B. Physical Network Adapter
C. Virtual Machine Port Group for a Standard Switch
D. vMotion Network Adapter
E. vSAN Network Adapter
【多选题】
Which three features can be enabled for a new host cluster? (Choose three.)___
A. Storage Distributed Resource Scheduling
B. High Availability
C. Fault Tolerance
D. Distributed Resource Scheduling
E. Virtual SAN
【多选题】
An administrator receives a report that no real time statistics are available for a virtual machine in the vCenter Server inventory. Which two statements indicate likely causes of the problem? (Choose two.)___
A. The virtual machine is powered off.
B. The host containing the virtual machine is disconnected from vCenter Server.
C. There is insufficient real time data to display the information.
D. The vCenter Server service is not running.
【多选题】
Your manager has given you a bash script that retrieves data for ESXi 6.x host configurations. This data needs to be collected right after the installation of a host and must be run directly on the host. Which two actions can be used to run this script on an ESXi host? (Choose two.)___
A. Connect to the host with Ruby vSphere Console and run the script from there.
B. Enable SSH access from the Direct Console User Interface.
C. Enable the ESXi Shell from the
D. irect Console User Interface.
【多选题】
Which two are true about the Risk badge in vRealize Operations? (Choose two.)___
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
C. The Risk badge indicates problems that are degrading performance of the system.
D. Risks require attention now to correct system performance problems.
【多选题】
vSphere Update Manager allows which two virtual machine attributes to be upgraded? (Choose two.)___
A. Virtual machine firewall policies for NSX.
B. Software Packages in the virtual machine.
C. Virtual machine Hardware Version.
D. VMware Tools Upgrade.
【多选题】
What are two benefits of using NFS 4.1 with vSphere 6.x as compared to NFS 3? (Choose two.)___
A. NFS 4.1 supports Kerberos Authentication
B. NFS 4.1 supports multipathing
C. NFS 4.1 supports IPv6
D. NFS 4.1 supports hardware acceleration
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
推荐试题
【单选题】
公司主导产品“豫光”牌铅锭、锌锭、阴极铜,分别在( )注册交易。___
A. 伦敦金属交易所、上海期货交易所
B. 巴黎金属交易所、深圳期货交易所
C. 伦敦金属交易所、深圳期货交易所
【单选题】
2007年,豫光开创中国炼铅史上( )新模式,充分利用了原生铅与再生铅的优势,实现了废铅酸蓄电池的大规模自动化处理,指标先进,实用性强,开创了再生铅快速发展的“豫光模式”。___
A. 液态高铅渣直接还原熔炼
B. 废旧铅酸蓄电池自动分离-侧吹熔炼再生铅
C. 原生与再生相结合的炼铅
【单选题】
2008年7月1日奠基的公司8万吨/年电解铅项目,采用的是公司历时8年自主研发的( )新工艺,是有史以来国内首条脱离鼓风炉的铅生产线。___
A. 原生与再生相结合的炼铅
B. 液态高铅渣直接还原熔炼
C. 废旧铅酸蓄电池自动分离-侧吹熔炼再生铅
【单选题】
2012年,豫光( )试验取得成功,并首家将此工艺应用于综合回收铜及有价金属的冶炼渣处理技术改造工程。___
A. 双侧吹连续炼铜新工艺
B. 双底吹连续炼铜新工艺
C. 底吹+侧吹连续炼铜新工艺
【单选题】
2014年5月17日,第三届中国工业大奖在人民大会堂揭晓,公司荣获( )。中国工业大奖是经国务院批准设立的工业领域的最高奖项,代表我国工业发展的最高水平。___
A. 中国工业大奖提名奖
B. 中国工业大奖卓越奖
C. 中国工业大奖一等奖
【单选题】
2015年7月30日,公司设立了“一院八所”,成为公司技术创新、培养学科带头人和高科技人才的重要载体。下列不属于“一院八所”的机构是( )。___
A. 铅合金研究所
B. 锌合金研究所
C. 蓄电池研究所
【单选题】
2015年,公司( )建设启动,该体系覆盖河南、陕西、山西、四川、江西、福建等6个省份,建设规范、标准的基础收集贮存站点。___
A. 城市矿产回收网络体系
B. 废铅酸蓄电池回收网络体系
C. 再生资源回收网络体系
【单选题】
公司( )设计生产能力为7万吨/年。2016年3月开工建设,8月底竣工,9月10日试产,至年底已经稳定运行,是公司首次尝试( )单独处理。___
A. 底吹炉;粗铅
B. 侧吹炉;再生铅
C. 侧吹炉;再生塑料
【单选题】
2017年4月,在重点行业节能减排达标竞赛中,豫光集团因为节能减排工作突出,获得( )。___
A. “全国五一劳动奖章”
B. “全国五一劳动模范”
C. “全国五一劳动奖状”
【单选题】
2017年7月2日,公司再生铅资源循环利用及高效清洁生产技改项目奠基并开工建设,该工程采用一条氧气底吹-液态高铅渣直接还原生产线,替代原有两条( )生产线,实现环保提升、技术升级。___
A. 氧气底吹-鼓风炉还原
B. 氧气侧吹-鼓风炉还原
C. 废旧铅酸蓄电池自动分离-底吹熔炼再生铅
【单选题】
2017年7月,公司主持的产学研结合的项目有色金属冶炼烟气多污染物协同控制技术成功申请为( ),获得国家中央财政经费3245万元。___
A. 国家重点研发计划
B. 国家863计划
C. 国家科技支撑计划
【单选题】
公司目前的战略布局是:( )___
A. 做强有色主业,坚持循环经济,加快转型升级,完善产业链条
B. 上游抓资源、主业抓标杆、下游抓延链,外向抓贸易,周边抓多元
C. 两创两转两突破
【单选题】
公司2018年的工作思路是:( )___
A. 做强有色主业,坚持循环经济,加快转型升级,完善产业链条
B. 上游抓资源、主业抓标杆、下游抓延链,外向抓贸易,周边抓多元
C. 两创两转两突破
【单选题】
公司规划了与国家战略相对应的“三步走”的战略部署,其中第三步是:( )___
A. 保持高速高效发展,建设百年豫光。
B. 持续高效高速发展,到豫光建企100年,实现建设国际一流标杆企业的目标。
C. 持续高速扩张,到豫光建企100年,建设成为中国最好的企业。
【单选题】
张战伟书记要求公司要组织实施“511”工程。以下哪项不是“511”工程涵盖内容:( )___
A. “十三五”末工业产值达到500亿元
B. 建设一个国家级实验室或国家级技术创新平台;一个全行业标杆性工程
C. 建设一个世界级实验室;建设一个行业一流产业示范工程
【单选题】
下列关于公司循环经济建设的说法,错误的是:( )___
A. 建设资源节约型、环境友好型社会,是豫光不懈的追求
B. 目前,企业已形成了铅系统综合回收、锌系统综合回收两个循环经济圈
C. 公司是国家首批循环经济试点单位
【单选题】
豫光是河南省首家生产阴极铜的铜冶炼企业。关于“双底吹连续炼铜”新工艺,下列说法不正确的是:( )___
A. 该工艺流程短、投资少、节能减排效果明显
B. 工艺水平国际先进、自动化信息化融合程度高
C. 该工艺离发达国家水平还有一定差距
【单选题】
豫光是世界再生铅发展的中国样本。关于公司再生铅说法不正确的是:( )___
A. 国内首创再生铅和原生铅结合的豫光模式
B. 首创废铅酸蓄电池回收网络体系,开辟了废铅酸蓄电池绿色回收新模式
C. 废铅酸蓄电池回收竞争不过非法企业,应该放弃
【单选题】
《豫光集团创建中国有色冶炼标杆企业工作方案》提出,要以创建“七个一流”的中国有色冶炼标杆企业为目标,力争十三五期间实现铅锌铜冶炼关键可比指标和主要细分指标全面达到行业最优。其中,不属于七个一流的是:( )___
A. 安全一流、环保一流、质量一流
B. 指标一流、管理一流、文化一流
C. 规模一流、生产一流、细节一流
【单选题】
公司十三五期间管理工作的主线是“( )”,通过对标行业最优,做到指标提升和管理进步互动互促,实现公司竞争实力和行业引领能力显著增强。___
A. 创建中国有色冶炼标杆企业
B. 创建中国有色冶炼创新企业
C. 创建中国最具竞争力企业