【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
ABC
解析
暂无解析
相关试题
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
【多选题】
As part of a multisite Single Sign-On (SSO) deployment what two steps are required to ensure that a change to one Single Sign-On instance is propagated to the other instances? (Choose two.)___
A. Schedule a Replication Task on the primary instance
B. Select the first instance during the installation of subsequent instances
C. During the installation of each instance choose Linked-Mode
D. Enable Synchronize to Active Directory on each instance
【多选题】
You need to add an object to an existing vApp using the vSphere Web Client. How is this accomplished?___
A. Create an Object Inside the vApp.
B. Add an Object to a vApp.
C. Add an Object to the
D. atastore the vApp is located in.
【多选题】
Which three steps must be taken to use vSphere Update Manager 6.x to upgrade an ESXi 5.5 host to vSphere 6.x? (Choose three.)___
A. Download an ESXi Image.
B. Configure the vSphere Update Manager Download Service.
C. Create a baseline and attach it to the ESXi Host.
D. Scan the vCenter Content Library for the
E. SXi Image.
【多选题】
Which two options would allow a database administrator, with no access to the vSphere infrastructure, to connect to a virtual machine? (Choose two.)___
A. Use the Virtual Machine Remote Console (VMRC).
B. Use Remote Desktop Protocol (RDP) to connect.
C. Ask the vSphere administrator to grant permission to access the console through vCenter Server.
D. Ask the vSphere administrator to grant permission to access with the Horizon View Direct Connect Client.
【多选题】
Which three are architecture components of vRealize Operations? (Choose three.)___
A. Identity Server
B. Administrative Server
C. Analytics Server
D. Database Server
E. Connection Broker
【单选题】
金克拉金克拉撒旦蒂萨里大儿童家爱丽丝打开就撒开绿灯技术的()
A. 手动阀手动阀
B. 撒旦
C. 反对法
D. 第三方
【单选题】
金克拉金克拉撒退热贴开绿灯技术的()
A. 是否
B. 阿斯顿
C. 撒旦
D. 感到反感
【单选题】
而非热舞法国会开绿灯技术的()
A. 撒的
B. 热个股分化
C. 返回
D. 而我认为
【单选题】
十大富豪不给发货返回返回返回()
A. dfdfgd
B. 梵蒂冈梵蒂冈
C. 广泛大概
D. 热
【多选题】
马克思主义哲学所讲的静止是指___
A. 运动的一种特殊形式
B. 绝对不动
C. 排斥运动
D. 事物处于量变状态
E. 事物在特定参考系中未发生位置变动
【多选题】
物质和运动的关系是___
A. 运动是物质的固有属性
B. 物质是运动的承担者
C. 运动是物质的存在方式
D. 运动不一定是物质的运动
E. 物质不一定都在运动
【多选题】
社会的物质性体现在___
A. 劳动是社会产生和存在的决定性因素
B. 在社会中不存在精神的现象和活动
C. 物质资料的产生是社会历史的前提
D. 全部社会生活在本质上是实践的
E. 社会生活中不存在物质关系以外的其他关系
推荐试题
【多选题】
插座安装的工程量,应区别?___
A. 电源相数
B. 额定电流   
C. 插座安装形式 
D. 插座插孔个数 
E. 接线盒个数
【多选题】
电缆配管连接配电箱时,箱内需要计算哪些工程量?___
A. 线缆端头
B. 预留
C. 电缆长度   
D. 导管长度   
E. 电线长度
【多选题】
电缆桥架按种类分为?___
A. 槽式 
B. 托盘式 
C. 梯架式 
D. 网格式 
E. 埋地式
【多选题】
电力变压器分( )及( )两种,以台计算,区别高低压及容量___
A. 干式 
B. 油浸式 
C. 分离式 
D. 油离式 
E. 混合式
【多选题】
电气专业需要计算的构件有哪些?___
A. 照明灯具
B. 配电箱柜  
C. 电线电缆   
D. 开关插座   
E. 接线盒
【多选题】
计算设置的主要作用是?___
A. 设置电气预留   
B. 设置管道支架计算方式   
C. 设置构件属性 
D. 设置超高计算方式 
E. 设置清单库、定额库(ABC)
【多选题】
控制台、控制箱、配电箱以台计算,应标明箱柜大小尺寸,配电箱区分()和()两种___
A. 落地式   
B. 悬浮式 
C. 悬挂嵌入式
D. 半嵌入式   
E. 半地下式
【多选题】
配电装置包括___
A. 断路器   
B. 接触器 
C. 互感器 
D. 避雷器 
E. 电抗器
【多选题】
软件内防雷接地里面默认有哪些构件?___
A. 避雷针   
B. 接地极 
C. 母线
D. 均压环 
E. 竖向立管
【多选题】
下列哪种情况可以被属性检查功能检查出来?___
A. 接地模块图元的标高高于绝对标高-0.6m时  
B. 管径的数值小于10或大于300时    
C. 4>保温厚度>0时
D. 图元是否计量属性为“否”    
E. 标高为层底标高
【多选题】
需要安装接线盒的设备有___
A. 配电箱   
B. 开关
C. 灯具
D. 插座
E. 管线
【多选题】
荧光灯具安装的工程量,应区别灯具的___
A. 安装形式
B. 灯具种类   
C. 灯管数量   
D. 开关种类   
E. 照明形式
【多选题】
有线电视系统包括哪些部分___
A. 信号线   
B. 前端
C. 传输系统   
D. 用户分配网
E. 以上都不对
【多选题】
“系统图”功能可以识别出哪些信息?___
A. 回路编号
B. 导线规格型号  
C. 导管规格型号 
D. 敷设方式   
E. 标高
【多选题】
绘制电线导管时,可以采用___绘制。
A. 直线绘制
B. 三点画弧   
C. 起点圆心终点画狐
D. 圆形绘制   
E. 矩形绘制
【多选题】
检查回路可以查看哪些工程量?___
A. 图元基本工程量
B. 电气线缆工程量   
C. 线缆端头工程量   
D. 支架工程量
E. 剔槽工程量
【多选题】
识别完灯具发现有一种灯具的标高输错了,如何快速修改灯具的标高?___
A. 批量选择改属性
B. 按属性查找图元进行修改
C. 提属性修改
D. 其他构件  
E. 无法修改
【多选题】
通过哪些功能识别图纸中的管线?___
A. 单回路   
B. 多回路 
C. 自动识别   
D. 选择识别   
E. 多线绘制
【多选题】
哪些构件可以生成接线盒?___
A. 电线导管
B. 电缆导管   
C. 开关插座   
D. 综合线缆   
E. 桥架
【多选题】
使用选择起点功能的要求是?___
A. 必须设置起点   
B. 必须选择导管  
C. 桥架树连通
D. 必须选择立管    
E. 不允许跨层
【多选题】
软件内计算剔槽必须需要满足哪些条件?___
A. 砌块墙   
B. 管在墙内   
C. 管端点有设备 
D. 必须是立管
E. 必须是水平管
【多选题】
选择起点不能使用的原因有哪些?___
A. 无起点   
B. 与起点未连通  
C. 未选择管线
D. 未选择桥架
E. 有多个起点
【多选题】
避雷网可以采用以下哪些功能进行绘制?___
A. 直线绘制
B. 回路识别   
C. 布置立管   
D. 选择识别   
E. 自动识别
【多选题】
下列工程量软件能够自动统计的是?___
A. 电缆头   
B. 接地母线附加长度
C. 预留长度   
D. 敷设驰度   
E. 接线盒
【多选题】
布置立管功能可以处理哪些构件?___
A. 引上线   
B. 竖向桥架   
C. 引下线 
D. 竖向配管   
E. 水平配管
【多选题】
电气管线剔槽软件如何快速处理___
A. 将管道属性中,是否计算跳槽改为“是”    
B. 识别墙,墙类型改为砌块墙
C. 不能处理,只能手算  
D. 以上说法多对 
【多选题】
安装专业的图纸一般包括___安装大样图等。
A. 主要设备材料表
B. 系统图 
C. 平面图 
D. 设计说明
【多选题】
下列哪个构件套定额的工程量不是按体积计算的___
A. 焊接钢管
B. PPR管  
C. 通风管道   
D. 管道保温层
【多选题】
水管自动识别下面说法正确的是___
A. 标识必须与CAD线平行   
B. 标识与CAD线的距离不受CAD识别选项的控制   
C. 标识与CAD线的夹角小于等于5度则认为平行   
D. 遇到立管的圆圈时水平管自动打断,不生成通头   
【多选题】
在给水系统中,以下构件工程量计算和管道长度计算有关的是___
A. 管道刷油
B. 管道保温   
C. 阀门
D. 管道保护层
【多选题】
电气照明专业,关于铜芯聚氯乙烯绝缘电线的型号不正确的是___
A.
B. V    B ZR  
C. SC  
D. PVC    
E. DN
【多选题】
属于电气专业要计算的设备是___
A. 开关 
B. 插座
C. 线缆
D. 接线盒 
E. 桥架
【多选题】
材料表中包含的信息有___
A. 图例 
B. 名称
C. 型号
D. 工程规模   
E. 工期
【多选题】
下列是人体触电的直接原因,哪一种说法是正确的___
A. 误触高压线 
B. 误触带电裸导线   
C. 接触漏电电气设备
D. 缺乏安全用电知识 
【多选题】
关于镇流器的作用,以下错误的是___
A. 产生高压脉冲以点燃低压汞灯
B. 稳定工作电流  
C. 改善功率因数    
D. 节能
【多选题】
民用电系统包括以下哪几个系统___
A. 动力系统
B. 发电系统   
C. 照明系统   
D. 应急照明系统 
E. 防雷接地系统
【多选题】
以下哪些设备属于配电设备___
A. 卤素灯   
B. 断路器 
C. 隔离开关   
D. 互感器 
E. 高低压配电柜
【多选题】
电机指的是()和()的总称___
A. 高压配电机 
B. 发电机 
C. 柴油机 
D. 电动机 
E. 电压报警机
【多选题】
电缆桥架包括()和()___
A. 电缆梯架
B. 电缆管架   
C. 电缆导管   
D. 电缆沟 
E. 电缆托盘
【多选题】
下列线缆中需要计算电缆敷设驰度的是?___
A. RVVP-4*4   
B. YJV-4*4    
C. BTTZ-4*4  
D. YJ(F)Y-4*4