【多选题】
What are two requirements to enable EVC in vSphere DRS cluster? (Choose two.)___
A. CPUs must be from the same vendor.
B. EVC must use the lowest possible baseline supported by the hardware.
C. CPUs must be in the same family and of the same speed.
D. No VMs may be running in the cluster.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
AB
解析
暂无解析
相关试题
【多选题】
What three conditions could result in VMware Flash Read Cache being unable to claim a disk? (Choose three.)___
A. The disk is not listed in the VMware hardware compatibility guide.
B. The disk is not detected as an SSD.
C. The disk is not detected as local.
D. The disk is in use by VMFs.
【多选题】
Boot from SAN is supported on which three storage technologies? (Choose three.)___
A. VMware vSAN
B. FCoE
C. NFS 4.1
D. iSCSI
E. FC
【多选题】
Which two components are part of storage I/O multipathing on ESXi? (Choose two.)___
A. SATP
B. VASA
C. PSP
D. VAAI
【多选题】
Which two statements are true about Highly Available vSphere Auto Deploy infrastructure? (Choose two.)___
A. It helps prevent data loss.
B. It is a prerequisite for using vSphere Auto Deploy with stateful install.
C. It requires two or more Auto
D. eploy servers.
【多选题】
The virtual machine log rotation size can be changed for all VMs by which two interfaces? (Choose two.)___
A. PowerCLI
B. vSphere Web Client
C. ESXi host client
D. esxcli
【多选题】
Which two configuration options can exclude virtual disks from snapshot operations? (Choose two.)___
A. Use RDM in virtual mode for virtual disk.
B. Use virtual disks in Independent – Persistent mode.
C. Use a virtual disk larger than 2 TB in size.
D. Use RDM in physical mode for virtual disk.
【多选题】
Which two storage configurations on the source server are unsupported with VMware Converter? (Choose two.)___
A. Linux LVM
B. software RAID
C. GPT/MBR hybrid disks
D. Windows basic volumes
E. Windows dynamic volumes
【多选题】
Which two statements about vCenter HA are correct? (Choose two.)___
A. ESXi 5.5 or later is required.
B. vCenter HA network latency between nodes must be less than 50 ms.
C. NFS datastore is supported.
D. It must be deployed on a 3
E. SXi host cluster with DRS enabled.
【多选题】
An attempt to delete NFS datastore from a ESXi host returns the error: Sysinfo error on operation returned the following status:< Busy> Which two statements could explain this failure? (Choose two.)___
A. NFS datastore is a part of Storage DRS Cluster.
B. NFS.VolumeRemountFrequency value is set to 30.
C. Storage I/O Control is enabled on NFS datastore.
D. NFS datastore has running or registered virtual machines.
【多选题】
An administrator finds that the Microsoft Exchange virtual machines are exhibiting network latency. What two in-guest changes can help decrease latency? (Choose two.)___
A. LRO
B. TSO
C. SR-IOV
D. PVRDMA
【多选题】
Which two types of iSCSI adapters require VMkernel networking configuration? (Choose two.)___
A. dependent hardware
B. in-guest
C. software
D. independent hardware
【多选题】
Which two statements are true for NFS v4.1 firewall behavior? (Choose two.)___
A. It closes port 2049.
B. It sets allowed. All flag to TRUE.
C. It sets allowed. All flag to FALSE.
D. It opens port 2049.
【多选题】
A vSphere Administrator attempts to enable Fault Tolerance for a virtual machine but receives the following error: Secondary VM could not be powered on as there are no compatible hosts that can accommodate it. What two options could cause this error? (Choose two.)___
A. The other ESXi host(s) are in Maintenance Mode.
B. Hardware virtualization is not enabled on the other ESXi host(s).
C. The other ESXi host(s) are in Quarantine Mode.
D. Hardware MMU is enabled on the other
E. SXi host(s).
【多选题】
Storage capabilities be populated in what two ways? (Choose two.)___
A. The administrator can use tags to describe capabilities.
B. Default capabilities are provided by vCenter Server.
C. Datastores can advertise their capabilities through VAAI.
D. Datastores can advertise their capabilities through VASA.
【多选题】
In network troubleshooting it is important to know what upstream switch the ESXi host is connected to. Which two features does ESXi provide to help identify the upstream switch? (Choose two.)___
A. Promiscuous mode
B. DPM
C. LLDP
D. CDP
【多选题】
Virtual Volumes supports which three VMware features? (Choose three.)___
A. Instant Clones
B. Distributed Resource Scheduler
C. Linked Clones
D. vMotion
E. Storage Distributed Resource Scheduler
【多选题】
vSphere DRS helps to balance virtual machines with available resources in a vSphere cluster. What three types of resources can be taken into account for balancing? (Choose three.)___
A. CPU
B. physical NIC saturation of an ESXi host
C. virtual NIC saturation of a virtual machine
D. RAM
E. storage latency
【多选题】
Which three design requirements must be satisfied to enable RAID-6 objects in a VMware vSAN cluster? (Choose three.)___
A. vSAN Advanced license or higher
B. vSAN stretched cluster
C. at least six hosts contributing storage
D. deduplication and compression
E. all flash configuration
【多选题】
When using "Cluster resource percentage" for host failover capacity in vSphere HA Admission Control, the total resource requirements are calculated from which two values? (Choose two.)___
A. Total vCPUs assigned to each VM.
B. Average CPU usage on each VM over time.
C. Memory reservations on each VM.
D. Total memory assigned to each VM.
E. Average active memory on each VM over time.
F. CPU reservations on each VM.
【多选题】
Which are four attributes of the Active vCenter HA node? (Choose four)___
A. It uses the vCenter HA network to communicate with the Witness node.
B. It constantly replicates vPostgres data with the Witness node.
C. It uses a public IP address for the management interface.
D. It runs the active vCenter Server Appliance instance.
E. It uses the vCenter HA network for replication of data to the Passive node.
F. It provides a quorum to protect against split-brain situations.
【多选题】
Which are two vCenter Server two-factor authentication methods? (Choose two.)___
A. RSA SecurID
B. Smart Card
C. SAML
D. Symantec VIP
【多选题】
An administrator is creating VMkernel adapters on an ESXi 6.5 host and wants to create separate VMkernel adapters for every type of traffic in the default TCP/IP stack. Which three types of traffic can be explicitly enabled on a separate VMkernel adapter? (Choose three.)___
A. Virtual SAN traffic
B. NFS traffic
C. vMotion traffic
D. vSphere HA traffic
E. Fault Tolerance logging traffic
【多选题】
When migrating a Windows vCenter Server 6.0 to the vCenter Server Appliance 6.5, which two will be migrated by default? (Choose two.)___
A. Local Windows OS users and groups
B. Configuration
C. Custom ports
D. FQDN
E. Historical and Performance data
【多选题】
Which three types of Content Libraries exist within vSphere 6.5? (Choose three.)___
A. Remote Content Library
B. Published Content Library
C. Local Content Library
D. Shared Content Library
E. Subscribed Content Library
【多选题】
An administrator cannot enable multi-processor Fault Tolerance (SMP-FT) for a virtual machine. Which are two possible causes for this? (Choose two.)___
A. The virtual machine is running on a vSAN datastore.
B. The Fault Tolerance network is using a 10Gbit uplink.
C. The virtual machine has 6 vCPUs assigned.
D. The virtual machine has a 1TB VMDK attached.
E. The virtual machine has snapshots present.
【多选题】
Which two statements are true for Predictive DRS? (Choose two.)___
A. It balances resource utilization for virtual machines with unpredictable utilization patterns.
B. It integrates DRS with vRealize Operations Manager to balance workloads for virtual machines before resource utilization spikes occur.
C. It balances resource utilization based on a threshold's algorithm that runs each night.
D. It determines the best placement and balance of virtual machines based on a threshold's algorithm that runs each night in vCenter Server 6.5 Database.
【多选题】
Which two situations could cause a virtual machine to appear with (orphaned) appended to its name? (Choose two.)___
A. if a host failover is unsuccessful
B. if a virtual machine was removed from vCenter Server's inventory
C. if a virtual machine was deployed from template, and the template has been deleted
D. if a virtual machine is unregistered directly on the host
【多选题】
Which three requirements are needed to apply RAID 5 or RAID 6 erasure coding on a vSAN 6.2 or 6.5 object? (Choose three.)___
A. on Disk Format 3.0
B. Hybrid vSAN
C. All Flash vSAN
D. vSAN Advanced License
E. Stretched Cluster Configurations
【多选题】
An administrator sees the following error in the log files: Which two events could be the source of the error message? (Choose two.)___
A. vCenter Server failure
B. VXLAN failure
C. Disk array failure
D. Network failure
E. ESXi host failure
【多选题】
An administrator is attempting to access an ESXi host via the DCUI but is unable to do so. Which could be two possible causes? (Choose two.)___
A. The host in Qhas no out-of-band management capability (i.e. iLO/iDRAC).
B. The SSH service is disabled on the host.
C. Strict lockdown mode is enabled on the host.
D. Normal lockdown mode is enabled and the administrator is a member of the
E. xception User list.
【多选题】
Which two permissions are required to migrate a virtual machine with Storage vMotion? (Choose two.)___
A. Network > Move Network
B. Virtual Machine > Inventory > Move
C. Resource > Migrate powered on virtual machine
D. Datastore > Allocate Space
【多选题】
Which are three supported storage requirements for vCenter Server HA? (Choose three.)___
A. NFS
B. RDM
C. vSAN
D. VMFS
E. JBOD
【多选题】
Which are the two network requirements for a VMware vSAN 6.5 cluster? (Choose two.)___
A. Multicast must be enabled on the physical switches and routers that handle vSAN traffic.
B. vSAN requires IPv6 only.
C. All hosts must have a dedicated 40GbE NIC.
D. The vSAN network supported IPv4 or IPv6.
E. vSAN requires IPv4 only.
【多选题】
Which three prerequisites must be in place prior to enabling secure boot for a virtual machine? (Choose three.)___
A. VirtualMachine.Config.Settings privileges
B. an encrypted USB drive
C. Virtual Hardware version 13 or later
D. Virtual Hardware version 12 or later
E. EFI firmware
【多选题】
A user is given the "Virtual machine user (sample)" role in a vSphere 6.x environment. Which three permissions would the user be able to perform? (Choose three.)___
A. Reset a virtual machine.
B. Power on a virtual machine.
C. Move a host into a cluster.
D. Configure CD media.
E. Migrate a virtual machine with Storage vMotion.
【多选题】
Which three are supported upgrade processes for ESXi host? (Choose three.)___
A. using vSphere Auto Deploy
B. using a TFTP server
C. using Update Manager
D. using an
E. SXCLI command
【多选题】
When enabling Storage DRS on a datastore cluster, which three components are enabled as a result? (Choose three.)___
A. Space load balancing among datastore within the datastore cluster.
B. Initial placement for virtual disks based on space and I/O workload.
C. I/O load balancing among datastores within the datastore cluster.
D. Queue Depth alerting on disks within the datastore cluster.
E. Data de-duplication within the datastore cluster.
【多选题】
What are two features introduced in Network I/O Control version 3? (Choose two.)___
A. Bandwidth reservation per traffic type
B. Network resource pools
C. CoS tagging
D. Bandwidth guarantee to virtual machines
【多选题】
Which two correct virtual machine advanced configuration parameters will accomplish this? (Choose two.)___
A. isolation.device.edit.disable = “FALSE”
B. isolation.device.edit.disable = “TRUE”
C. isolation.device.connectable.disable = “FALSE”
D. isolation.device.connectable.disable = “TRUE”
【多选题】
Which three statements are correct regarding booting an ESXi Host from Fibre Channel SAN? (Choose three.)___
A. Direct connect topology is supported.
B. Each host must have its own boot LUN.
C. ESXi hosts do not require local storage.
D. Multipathing to a boot LUN on an active-passive array is supported.
E. Hosts can share one common boot LUN.
推荐试题
【单选题】
CCA125在一个项目接近完工时,发起人要求承包商改变已安装的照明以符合新标准。承包商应该怎么做?___
A. 审查工作并提交一份显示工作已完成的报告
B. 请求延长工期并提交变更请求以完成工作
C. 与发起人一起检查新规定,然后提交变更请求
D. 评估成本和进度影响,然后向项目经理提交变更请求
【单选题】
CCA126一个新项目完工所需成本的不确定性很高。项目经理应该用什么方法来确定预期成本?___
A. 类比估算
B. 统计技术估算
C. 参数估算
D. 三点估算
【单选题】
CCA127项目经理希望供应商完成他们生产的每个组件的测试,但惊讶地发现没有进行任何测试。为了恢复,项目团队对组件进行统计抽样。测试要求应记录在哪里?___
A. 采购管理计划
B. 质量管理计划
C. 合同变更文档
D. 需求管理计划
【单选题】
CCA128项目经理集合在地理上分散的团队,为一家组织实施新的强制性监管要求。若要获得该相关方的承诺,项目经理应该怎么做?___
A. 设置必要的沟通基础设施。
B. 召开项目启动大会。
C. 执行相关方分析。
D. 让团队集中办公
【单选题】
CCA129供应商通知项目经理可能延迟交付一个模块。项目经理应该怎么做?___
A. 立即通知相关方
B. 通过增加额外的天数来修改项目管理计划,并记录它们对项目时间的影响。
C. 审查风险管理计划以评估风险,然后通知相关方。
D. 完成对项目影响的评估,并更新项目管理计划。
【单选题】
CCA130一项批准的项目变更将需要一名 IT 部门的专用资源。该资源的经理没有空提供批准,但马上需要该资源以确保项目保持进度。项目经理应该怎么做?___
A. 将新工作分配给现有团队成员
B. 寻求项目发起人的指导。
C. 告诉该资源开始工作,并在经理有空时获得批准。
D. 查阅变更管理计划
【单选题】
CCA131一家公司被一家大公司收购,这家大公司希望把重点放在其核心产品和服务上。处于规划阶段的所有项目都正在进行修定,以包含 新的变更管理程序。一个项目的项目经理需要持续的高级输入,以确保与新的组织结构保持一致。若要确保项目变更得到有效管理,项目经理应该怎么做?___
A. 重新开放需求,扩展项目以包含新的变更管理程序,并制定一名团队成员全权负责变更管理
B. 确定哪些变更控制适用于该项目,只实施那些相关且有价值的变更控制,并在必要时将变更升级上报给管理层。
C. 忽略新的变更管理过程,并通知新的管理层,项目需求已经完成并且无法进行变更
D. 实施新的变更控制并形成变更控制委员会CCB,以跟踪和监控变更.并及时解决问题和升级上报问题
【单选题】
CCA132在项目启动大会结束时,项目经理陈述项目范围并让关键相关方和高管提出意见,项目经理正在尝试完成什么目标?___
A. 记录需求日志的信息
B. 设定团队成员对项目可交付成果的期望
C. 获得相关方的正式承诺
D. 创建项目的范围基准
【单选题】
CCA133项目经理正在为客户管理一个跨国项目,拟采用最新技术替换其电信基础设备。项目经理得知,在某些国家,必须遵循特定的环境规定来处置被替换的硬件。在制定商业论证时,未考虑到这些规定,项目经理应该怎么做?___
A. 更新商业论证以包含硬件处置成本。
B. 建议发起人将遵守这项规定的成本纳入商业论证。
C. 提出一个包含遵守环境法规成本的实施策略。
D. 根据业务需求识别主要可交付成果,以管理客户期望并遵守该规定。
【单选题】
CCA134项目发起人通知项目经理,即使已完成的项目符合进度计划,在预算范围满足范围需求,但客户对最终产品感到不满意。若要避免这种情况,项目经理应该事先做什么?___
A. 在制定质量管理计划的同时安排更多的会议。
B. 确保可交付成果符合质量控制测量结果中列出的要求
C. 实施石川图工具
D. 完成需求跟踪矩阵
【单选题】
CCA135在创建采购管理计划时,项目经理发现组织内部存在的某些资源正在为其他项目效力,项目经理应该怎么做来满足这种需求?___
A. 开展自制或外购分析
B. ,创建工作分解结构WBS
C. 制定风险登记册
D. 开始人员分配谈判
【单选题】
CCA136到目前为止本该完成百分之八十的一个项目只完成了百分之七十五,项目总预算为100,000 美元,己完成工作实际成本ACWP为 72,000 美元。根据这些信息可以确定什么?___
A. 该项目低于预算,其进度绩效指数(SPI)为 0.94,成本绩效指数(CPI)为 1.04
B. 该项目超出预算,其 SP1 为 1.07,CPI 为 0.96
C. 该项目超出预算,其 SPI 为 0.94,CPI 为 1.04
D. 该项目低于预算,其 SPI 为 0.94, CP1 为 0.96
【单选题】
CCA137一个项目已经发生偏差几个月了,这种状态 B 通过电子邮件在每周报告中发送给所有相关方。一位关键相关方刚刚得知这一偏差并对只通过电子邮件通知他们感到不安,若要预防这个问题,项目经理应该是先做什么?___
A. 确认所有相关方都收到并理解每份状态报告
B. 为每一个相关方选择适当的沟通方法
C. 直接与关键相关方就重要问题或项目偏差进行接洽
D. 计划与关键相关方定期举行会议以报告项目状态
【单选题】
CCA138项目经理加入一个刚刚开始的项目,项目发起人和项目团队向新项目经理保证有足够的预算和符合实际的进度计划,项目经理担心可能威胁到项目成功的意外事件。项目经理 应该怎么做?___
A. 识别并评估任何项目风险
B. 请求项目发起人为项目规划提供额外资金
C. 与职能经理讨论潜在的计划外风险
D. 关注按计划执行项目
【单选题】
CCA139项目经理加入一个具有分布式团队.固定预算和紧迫期限的项目。在项目规划过程中,若要避免任何范围蔓延,并让团队专注于交付满足要求的产品,项目经理应该怎么做?___
A. 确保范围的任何变更都经过正式的批准过程
B. 与所有开发团队召开每日站会
C. 要求所有开发团队主管准备详细的需求
D. 防止相关方直接与开发团队主管交流
【单选题】
CCA140客户拒绝了一项交付成果,因为它不符合约定的质量规格,项目团队调查该问题,并确定供应商提供的零件有问题,供应商拒绝纠正这种情况。项目经理应该审查什么?___
A. 与供应商订立的服务水平协议SLA
B. 采购管理计划和合同协议
C. 内部质量保证报告
D. 资源管埋计划
【单选题】
CCA141在一个项目的用户验收阶段,一些用户抱怨他们的期望未得到满足,项目经理事先应该釆取哪一个不同做法?___
A. 考虑相关方的反馈
B. 执行风险评估
C. 实施冲突管理技术
D. 与用户建立一种专业关系
【单选题】
CCA142由于升职,一位新相关方加入到一个项目中。该相关方对其新角色的操作责任有良好的认识,但未接受过与该项目角色相关的培训。项目经理应该怎么做?___
A. 与新相关方开会,审查相关项目文件并收集背景信息,然后更新相关方登记册
B. 请新相关方书面确认他们对新角色的理解,然后更新项目章程
C. 更新项目治理计划以添加这位新相关方,并包含相关责任的描述以反映这项变更
D. 修订工作分解结构WBS,以包含这位新相关方的相关可交付成果
【单选题】
CCA143项目经理正在为一个新项目制定项目进度计划,根据项目经理的经验,该项目需要两年才能完成。然而,公司总监要求该项目在18个月内完成。项目经理应该怎么做?___
A. 根据总监的要求修订项目进度计划
B. 使用资源平衡,来平均项目团队成员的任务
C. 减少项目范围以满足修订的项目进度计划
D. 保持项目进度计划不变,但显示这种变更对其他制约因素的影晌
【单选题】
CCA144项目经理正在制定相关方参与计划,并识别到一位权力等级较高但在项目中兴趣较低的相关方,项目经理应该如何对待该相关方?___
A. 重点管理
B. 随时告知
C. 监督
D. 令其满意
【单选题】
CCA145在一个价值 100 万美元的项目中途,项目经理进行挣值分析(EVA),分析显示计划价值PV为 623,000 美元,挣值EV为 523,000 美元,实际成本AC为 643,000 美元。 根据这些数字,项目的成本偏差CV和进度偏差 SV分别是多少?___
A. CV =+120.000 美元,SV =+100,000 美元
B. CV =+100.000 美元,SV =+120,000 美元
C. CV =-100.000 美元,SV = -120,000 元
D. CV = -120.000 美元,SV = -100,000 美元
【单选题】
CCA146一家跨国公司的组织单位有大量的产品增强功能待办事项,这些产品增强功能是暂时保留的用户故事。待批准的预算申请在上周获得批准。___
A. 记录项目生命周期和方法讨论需求
B. 为所有用户故事制定一份进度计划
C. 对所有用户故事执行风险评估
D. 根据以前相同产品的项目分配资源
【单选题】
CCA147一个大型项目包含将由分包商执行的许多阶段。团队成员各自负责一个阶段。项目经理应该使用什么来执行质量管理计划?___
A. 质量测量指标
B. 质量审计
C. 根本原因分析
D. 因果分析
【单选题】
CCA148一个项目的规模已经大到由指导委员会取代单一的项目发起人。项目经理应该怎么做来适应这种新发展?___
A. 认识到相关方结构发生了变化,并量身定做与这个团队的沟通
B. 按照最初的计划继续工作,同时认识到该项目现在包括其他相关方
C. 为团队组织一次与新的指导委员会一起召开的会议,继续进行项目工作
D. 与新的委员会分享当前的状态报告
【单选题】
CCA149在一次迭代结束时,一位团队成员告诉项目经理,由于几天前出现了无法解决的问题,一个计划任务未完成。若要在将来避免这种情况,项目经理应该怎么做?___
A. 在回顾总结会议上讨论该问题
B. 在演示中说明该问题
C. 在下一次迭代规划会上讨论该问题
D. 在下一次迭代每日站立会上审查该问题
【单选题】
CCA150项目经理向所有相关方发送定期状态报告,报告内容包括项目成就列表,即将完成的目标和目前的挑战。但是,一些相关方仍抱怨说他们不了解项目的状态。项目经理应该怎么做?___
A. 联系这些相关方以了解他们担心的问题,并在实施变更之前遵循变更请求过程
B. 向这些相关方分发一些新的,更详细的状态报告
C. 要求这些相关方审查沟通管理计划并向他们提供最新的状态报告
D. 与这些相关方和项目团队开会,以提供更详细的项目状态更新
【单选题】
CCA151项目经理正在开展一个内部项目,需要一个新的销售点POS交易系统,项目经理发现这个系统有个问题,不仅可能延迟这个项目,而且还会影响到依赖于这个系统的其他一些项目。这个问题未包含在风险登记册中,因为之前的试验认为该系统没有缺陷。项目经理应该联系谁来解决这个问题?___
A. IT 部门
B. 受影响的发起人
C. 受影响的项目经理
D. 运营团队
【单选题】
CCA152项目经理正在管理一个先进的计费系统项目。项目经理已经检查了现在的计费系统以及公司项目管理信息系统PMIS中的经验教训知识库。项目经理将可能收集更多的系统需求。项目经理下一步应该怎么做?___
A. 参考所有的行业最佳实践
B. 咨询任何有经验的内部或外部团队
C. 与外部主题专家(SME) 一起工作
D. 与内部业务和技术支持资源一起工作
【单选题】
CCA153项目经理聘请一位资源开发一个网站。该资源在没有完成工作的情况下突然离职,项目经理必须聘请另一位资源来完成这项工作,新聘请的资源更改网络设计,覆盖了原有设计。应如何描述与第一位资源工作相关的成本?___
A. 间接成本
B. 直接成本
C. 沉没成本
D. 可变成本
【单选题】
CCA154在收尾会议上,项目发起人表示根据项目评估,项目取得成功。但一位相关方却不同意,因为没有实现他们的需求。项目经理指出,相关方的需求在项目范围说明书中被称为项目除外情况。项目经理下一步应该怎么做?___
A. 忽略该相关方的争论并继续进行收尾会议
B. 建议进行项目评估以确保项目已完成
C. 建议将这些需求作为另一个项目的范围
D. 在问题日志中添加该问题
【单选题】
CCA155在项目启动期间,项目经理进行了成本效益分析,结果为 0.6,项目经理下一步应该怎么做?___
A. 咨询专家,寻找选择方案,并重新执行分析
B. 与项目发起人一起审查结果,以确认项目的可行性
C. 审查报告以确定是应该开始项目还是拒绝项目
D. 咨询相关方关于项目的批准情况
【单选题】
CCA156项目经理负责管理一个处于执行阶段的项目,并希望审查项目范围以进行成本结算,项目经理发现在工作分解结构WBS中遗漏了一项可交付成果。项目经理下一步应该怎么做?___
A. 询问相关方是否需要添加这些遗漏的可交付成果
B. 请求项目管理办公室PMO批准这顼工作的额外资金
C. 根据 100%的规则将工作添加到 WBS 中,并重新计算项目总成本
D. 要求主题专家(SMEs)检查这些可交付成果是否有必要
【单选题】
CCA157客户对产品质量不满意。项目经理收到一份质量团队提供的图表,图表表明少量的原因导致大部分的问题。质量团队向项目经理提供的是下列哪一项?___
A. 散点图
B. 趋势图
C. 帕累托图
D. 控制图
【单选题】
CCA158项目经理完成项目章程的制定,并与关键相关方一起审查项目章程。项目经理下一步应该怎么做?___
A. 制定项目管理计划
B. 与项目团队一起召开项目启动大会
C. 获得项目发起人对项目章程的批准
D. 获得相关方对项目章程的批准
【单选题】
CCA159项目经理通过将工作包分解到活动中去,识别并记录产生项目可交付成果的具体行动,结果将产生哪一份文件?___
A. 资源分解结构RBS
B. 活动资源需求
C. 里程碑清单
D. 活动持续时间估算
【单选题】
CCA160项目经理被任命管理一个现有项目,需要了解项目可交付成果项目经理应该参考下列哪一份文件?___
A. 项目章程
B. 项目需求规范
C. 项目范围说明书
D. 项目进度表
【单选题】
CCA161项目经理正在领导一支团队开发新的在线银行应用程序。23 个月后,团队支出 100,000美元,剩余预算成本只有 70,000 美元。目标完成日期还有 12 个月,但是团队期望能在 9 个月内就能完成。一名团队成员发现一款成熟的现货产品满足所有项目规范,能够以 60,000美元的价格购买到,且能够在八个月内实施。项目经理应该考虑什么?___
A. 完工尚需绩效指数
B. 客户或项目发起人验收
C. 开发方面已支出的金额
D. 自制或外购分析
【单选题】
CCA162项目经理得到通知,代码的关键部分软件开发人员将离开办公室三周时间。这项活动不属于关键路径。项目经理下一步应该怎么做?___
A. 按照项目进度计划的规定继续任务
B. 应用风险登记册中所述的应对策略
C. 获得拥有该技能的备用资源
D. 检查应急计划
【单选题】
CCA163项目经理正在规划一个新的多公司参与项目,每家公司都有多名项目相关方。项目经理应该使用什么沟通方法?___
A. 交互式沟通
B. 推式沟通
C. 拉式沟通
D. 选择性沟通
【单选题】
CCA164项目经理正在努力识别一个大型项目的完整范围。项目经理应该审查什么?___
A. 项目进度计划
B. 工作分解结构WBS和排列活动顺序
C. 网络图
D. 项目章程和需求文档