【单选题】
An administrator is attempting to enable Storage I/O Control on a datastore, but it is failing. What is the likely reason for this failure? ___
A. The host is connected to a datastore is running on ESX 4.0.
B. The host is connected to a Fibre Channel storage array.
C. The datastore has multiple extents.
D. The datastore is managed by a single vCenter Server.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
A
解析
暂无解析
相关试题
【单选题】
A mission-critical virtual machine built on vSphere 4.1 needs to be moved to an ESXi 6.x host.Which virtual hardware version is needed to move the virtual machine without upgrading? ___
A. 6
B. 7
C. 10
D. 11
【单选题】
An administrator is analyzing a virtual machine as shown in the Exhibit. What is the current long term risk for this virtual machine? ___
A. The virtual machine may run out of memory before April 27.
B. The virtual machine may continue to function after April 27.
C. The virtual machine has adequate memory configured for operation for the next 120 days.
D. The virtual machine has adequate memory reservation configured for operation for the next 120 days.
【单选题】
An administrator is monitoring a High Availability (HA) and Distributed Resource Scheduler (DRS) enabled cluster and has noticed that virtual machines in the cluster are being migrated without user intervention. Why is this happening? ___
A. The DRS Automation level is set to Fully Automated.
B. The Automation level is set to Automatic.
C. The
D. PM Threshold is set to Aggressive.
【单选题】
An administrator attempts to migrate a suspended virtual machine to a newly deployed vSphere 6.x cluster. The compatibility check fails. What condition could cause this behavior?___
A. The new vSphere 6.x cluster is running Intel CPUs instead of AMD CPUs.
B. A suspended virtual machine cannot be migrated.
C. The hardware virtualization feature of the CPU is not enabled on the new hosts.
D. A vSphere Distributed Switch is required to migrate a suspended virtual machine.
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
An administrator has just configured the IP address on an ESXi host from the Direct Console User Interface. How can the configuration be validated as correct without any additional tools?___
A. Add the host to vCenter Server and if it works, then all networking settings are ok.
B. Select the Test Management Network option from the DCUI.
C. Connect to the host with the vSphere Client and click the Test Network option.
D. Use PowerCLI to connect to the host and initiate a network test.
【单选题】
An administrator is installing vCenter Server for an environment that has 40 ESXi 6.x Hosts and 150 virtual machines. Which database would meet the minimal requirements needed for this task? ___
A. vFabric Postgres
B. Microsoft SQL Express 2008
C. Microsoft SQL Server 2014
D. Oracle 11g
【单选题】
What is a requirement when enabling a Virtual SAN cluster in an existing High Availability (HA) and Distributed Resource Scheduler (DRS) Cluster? ___
A. Disable DRS and HA before enabling Virtual SAN
B. Enable DRS before enabling Virtual SAN
C. Disable HA before enabling Virtual SAN
D. Enable Storage DRS before enabling Virtual SAN
【单选题】
The vSphere administrator attempts to connect to an ESXi host via an SSH client and receives the following security alert: The vSphere administrator needs to determine whether the RSA key fingerprint shown in the security alert is the fingerprint of the intended ESXi host. Which tool should the vSphere administrator use? ___
A. Direct Console User Interface
B. vSphere Client
C. vSphere Web Client
D. vSphere Management Assistant
【单选题】
An administrator needs to monitor traffic on vSwitches in a vSphere 6.x environment. Which option, if configured, would accomplish this task? ___
A. Forged Transmits
B. MAC Address Changes
C. Promiscuous Mode
D. Notify Switches
【单选题】
What is true regarding datastores on ESXi 6.x? ___
A. NFS 4.1 datastore does not support Fault Tolerance (FT)
B. VMFS3 and VMFS5 datastores can be newly created
C. NFS datastore can be concurrently mounted using NFS 4.1 on one host and NFS on another
D. NFS 3.0 datastore does not support Fault Tolerance (FT)
【单选题】
An administrator is cloning and configuring five new web server virtual machines. What would be the benefit of configuring resource shares for the new VMs? ___
A. To prioritize access to a resource during contention.
B. To guarantee access to a resource during contention.
C. To prioritize access to a resource before contention occurs.
D. To guarantee access to a resource before contention occurs.
【单选题】
An administrator logs into the vSphere Web Client and sees the warning shown in the Exhibit. During a change control window, the warning was addressed. What should be done to verify that the host is no longer showing the warning? ___
A. Run a Remediate host operation.
B. Recheck the compliance of the host.
C. Restart the host to get rid of the warning.
D. Install VMware tools to clear the warning.
【单选题】
A vApp named Sales has a Memory Limit of 32 GB and a CPU Limit of 12,000 MHz. There are three virtual machines within the vApp: <Sales-DB -- Has a memory reservation of 20 GB. > <Sales-DC -- Has a memory reservation of 8 GB. > <Sales-Web -- Has a memory reservation of 8 GB.> Which statement is correct? ___
A. All three virtual machines can power on, but will have memory contention.
B. All three virtual machines can power on without memory contention.
C. Only two of the three virtual machines can power on.
D. Only one of the virtual machines can power on.
【单选题】
You are editing the management network configuration of an ESXi 6.x Host from the vSphere Web Client. You mistakenly put the incorrect VLAN in place for the management network. What action do you need to take to correct this? ___
A. You need to manually edit the configuration on the host with command line utilities.
B. No action is required. By default ESXi rolls back configuration changes that disconnect the host.
C. The ESXi host system configuration will need to be restored to the factory configuration to fix the issue.
D. The change can be reverted in the vSphere Web Client by simply editing the switch again.
【单选题】
What is true about resource pools created on a Distributed Resource Scheduler (DRS) cluster?___
A. A root resource pool is created with the specified values.
B. A root resource pool is automatically created using the aggregate total of the ESXi host resources in the cluster.
C. A root resource pool is automatically created using the aggregate total of all resources in the datacenter.
D. A root resource pool is not needed when creating resource pools on a DRS cluster.
【单选题】
An administrator attempts to enable Enhanced vMotion Compatibility (EVC) on a cluster. The operation results in a compatibility error, as shown in the exhibit. What is the likely cause of this error? ___
A. The CPUs in the ESXi host are not AMD CPUs.
B. The CPUs in the ESXi host do not support hardware virtualization capabilities.
C. The XD/NX CPU features have not been enabled in the BIOS of the server.
D. There is no shared storage between the hosts in the cluster.
【单选题】
What condition would prevent an administrator from creating a new VMFS3 datastore on an ESXi 6.x host using the vSphere Web Client? ___
A. A VMFS3 datastore cannot be created on an ESXi 6.x host.
B. The VMFS3 kernel module is not loaded.
C. A VMFS3 datastore cannot be mounted on an ESXi 6.x host.
D. VMFS3 datastores are not compatible with virtual machines created on an
E. SXi 6.x host.
【单选题】
During a new vSphere Distributed Switch configuration, where does the Maximum Transmission Unit (MTU) value get modified? ___
A. Uplink Settings
B. Switch Settings
C. Portgroup Settings
D. NIC Teaming Settings
【单选题】
A small company wants to use VMware products for its production systems. The system administrator needs to recommend a solution that will deliver High Availability to the company's production applications. What is minimum vSphere offering that will support this requirement? ___
A. vSphere Essentials
B. vSphere Essentials Plus
C. vSphere Hypervisor
D. vSphere Standard
【单选题】
Which scenario shows a reason for VMware Tools failing to install? ___
A. Virtual machine has a CD-ROM configured.
B. Guest OS Antivirus is blocking the VMware Tools installation.
C. Guest OS has 64-bit ldd (list dynamic dependencies) utility installed.
D. Virtual machine is powered on.
【单选题】
An administrator is configuring an ESXi 6.x host to use multiple NICs to resolve a management network redundancy error. After configuring a second NIC, the server is not able to communicate when the primary connection is taken down. The administrator analyzes the Exhibit shown here. Based on the exhibit, what is the likely cause of the issue? ___
A. vmnic4 is not attached to a vSwitch.
B. vmnic2 is not connected to a physical switch.
C. E1000 is the incorrect NIC
D. river for this card.
【单选题】
What information is required as part of an interactive ESXi 6.x installation? ___
A. Keyboard layout
B. IP Address
C. Root password
D. DNS information
【单选题】
What is the default load balancing policy for a newly created VMkernel port on a vSphere Distributed Switch? ___
A. Route based on orginating virtual port ID
B. Route based on IP Hash
C. Route based on source mac address
D. Route based on physical NIC load
【单选题】
An administrator deploys vCenter Server using the embedded Platform Services Controller. After testing the deployment for a couple of months, it is determined that the environment would be better served with an external Platform Services Controller. What should the administrator do to meet this new requirement? ___
A. Deploy a fresh instance of vCenter Server with an external Platform Services Controller.
B. Perform a fresh install of an external Platform Services Controller.
C. Migrate the embedded Platform Services Controller to an external Platform Services Controller.
D. Upgrade the embedded Platform Services Controller to an external Platform Services Controller.
【单选题】
Why are some virtual machines orphaned after rebooting a High Availability (HA) enabled host? ___
A. The Orphaned virtual machines have HA restart disabled.
B. The Orphaned virtual machines moved recently and the change did not persist.
C. The host is attached to failed storage.
D. The host just came out of maintenance mode.
【单选题】
Which vSphere 6 Standard Edition feature will allow an organization to ensure that critical multi-threaded applications have the maximum possible uptime? ___
A. Fault Tolerance
B. High Availability
C. Distributed Resource Scheduler
D. App HA
【多选题】
An application running in a virtual machine is experiencing performance issues. When utilizing performance monitoring utilities, it is noted that the CPU Utilization of the application is at 100%. Which two scenarios are probable causes of the CPU contention for the application? (Choose two.)___
A. There is a network I/O constraint.
B. There is a storage I/O constraint.
C. There is insufficient disk space assigned to the virtual machine.
D. The application is not virtualization aware.
【多选题】
A Fault Tolerance (FT) virtual machine with four vCPUs is experiencing high latency when performing ICMP and Application tests. What are three potential causes that may be attributing to this latency? (Choose three.)___
A. The FT network has insufficient bandwidth and is running on a 1GB Link.
B. The FT network is on a particularly high latency link.
C. The FT network has been configured with Network I/O Control.
D. The FT virtual machine is running an e1000 network adapter.
E. The
F. T virtual machine is running on poor performing network-based storage.
【多选题】
A virtual machine is experiencing performance issues. The following performance metrics are observed: <CPU usage value for the virtual machine is above 90%> < CPU ready value for the virtual machine is above 20%> Which two activities will likely resolve the performance issues? (Choose two.)___
A. Set a CPU reservation for the virtual machine.
B. Increase the CPU limit on the virtual machine.
C. Decrease CPU shares equally for all virtual machines on the host.
D. Increase CPU shares equally for all virtual machines on the host.
【多选题】
An administrator is upgrading a vSphere Distributed Switch. The existing switch is version 6.0 and the administrator wants to upgrade to the latest version possible. The environment contains several ESXi 6.1 hosts. Which two options are available to ensure that the upgraded switch will be compatible with these hosts? (Choose two.)___
A. Upgrade the vSphere Distributed Switch to 6.0
B. Upgrade the ESXi 5.5 hosts to version 6.0, then upgrade the vSphere Distributed Switch to 5.5
C. Upgrade the vSphere Distributed Switch to 5.1
D. Upgrade the
E. SXi host switches to 5.5, then upgrade the vSphere Distributed Switch to 5.5
【多选题】
An administrator attempts to create a Thick Provisioned Virtual Disk (VMDK) on an NFS datastore; but it fails. Which two reasons would explain the failure? (Choose two.)___
A. Datastore is on an NFS 3 storage server that does not support Hardware Acceleration
B. Datastore is on an NFS 4.1 storage server
C. Only VMFS datastores support "Thick Provisioned" VMDK
D. The NFS datastore was not created on a "Thick Provisioned" device
【多选题】
Which two NFS Protocol versions does vSphere 6 support? (Choose two.)___
A. Version 3
B. Version 3.1
C. Version 4
D. Version 4.1
【多选题】
Which three operations occur during a cold migration of a virtual machine? (Choose three.)___
A. The virtual machine disks are moved if the datastore is being changed.
B. The virtual machine is registered with the destination server.
C. The source virtual machine is removed from the old hosts.
D. The virtual machine hardware is upgraded.
E. The virtual machine files are quiesced prior to the migration.
【多选题】
A 4 GB Memory virtual machine is experiencing extended memory issues, as shown in the Exhibit. What potential issues could be attributed to this memory pressure?___
A. A limit is imposed on the virtual memory of this virtual machine.
B. The Balloon driver has been uninstalled.
C. A limit has been imposed on the Virtual CPU of the virtual machine.
D. Storage IO control has been enabled for the virtual machine causing the swapped memory.
【多选题】
You are creating a virtual machine in the Web Client using the New Virtual Machine wizard. Which two steps are required? (Choose two.)___
A. Select a valid name.
B. Select a cluster for the compute resource.
C. Select a network adapter.
D. Select the virtual machine compatibility.
【多选题】
An administrator has been given requirements to configure vMotion for a new virtual machine. The configuration should: <Provide Network Redundancy Use VLAN 550> <Be secured against anyone trying to spoof communication The vSwitch1 configuration is shown in the Exhibit.> Which three changes should be made to meet the stated requirements? (Choose three.)___
A. The VLAN ID must be set appropriately.
B. The default values for MAC Address Changes and Forged Transmits must be altered.
C. The teaming and failover adapters must be set appropriately.
D. The Traffic Shaping configuration must be altered.
E. The Load Balancing Policy must be set appropriately.
【多选题】
Which three traffic types are available services options when configuring a vmkernel port? (Choose three.)___
A. Provisioning Traffic
B. Virtual Volumes Traffic
C. vSphere Replication NFC Traffic
D. Virtual SAN Traffic
E. FCoE Traffic
【多选题】
An administrator logs into the vSphere Web Client, but is unable to see any hosts and clusters. Which two options could fix the problem? (Choose two.)___
A. Verify that the client web browser and vCenter Server are in the same broadcast domain.
B. Verify that the vCenter Server system is registered with the same Platform Services Controller as the vSphere Web Client.
C. Log in to the vCenter Server as a user within the Active
D. irectory domain.
推荐试题
【多选题】
下列哪些选项属于事故报告的内容( )。
A. 事故发生的时间、地点(区域)以及事故发生单位
B. 已知的电力设备、设施损坏情况,停运的发电(供热)机组数量、电网减供负荷或者发电厂减少出力的数值、停电(停热)范围
C. 事故原因的初步判断
D. 事故发生后采取的措施、电网运行方式、发电机组运行状况以及事故控制情况
【多选题】
生产经营单位应当( )。
A. 制定生产安全事故应急救援预案
B. 定期组织应急救援预案演练
C. 对从业人员进行应急教育和培训
D. 以上都是
【多选题】
《电力建设工程施工安全监督管理办法》适用于电力建设工程的( )等有关活动,以及国家能源局及其派出机构对电力建设工程施工安全实施监督管理。
A. 新建
B. 扩建
C. 改建
D. 拆除
【多选题】
电力建设工程施工安全坚持“安全第一、预防为主、综合治理”的方针,建立( )的管理机制。
A. 企业负责
B. 职工参与
C. 行业自律
D. 政府监管
【多选题】
考试机构应当制订和认真落实特种设备作业人员的考试组织工作的各项规章制度,严格按照 ( )的原则,组织实施特种设备作业人员的考试,确保考试工作质量。
A. 公开
B. 公正
C. 公平
D. 科学
【多选题】
任何单位和个人不得非法 ( )或者出借《特种设备作业人员证》。
A. 印制
B. 伪造
C. 伪造
D. 倒卖
【多选题】
监理工程师必须遵守( )的职业准则,维护建设单位的合法权益,不损害其他有关单位的合法权。
A. 守法
B. 诚信
C. 公平
D. 科学
【多选题】
监理规划编制依据:与电力建设工程项目有关的( )和工程建设标准强制性条文。
A. 法律
B. 法规
C. 规章
D. 规范
【多选题】
总监理工程师应组织监理人员熟悉设计文件,并组织( )和进行施工图纸会检工作。
A. 建设单位
B. 承包单位
C. 设计单位
D. 分包单位
【多选题】
第一次工地会议应包括以下主要内容:( )分别介绍各自驻现场的组织机构、人员及其分工。
A. 建设单位
B. 监理单位
C. 设计单位
D. 承包单位
【多选题】
安全生产反违章工作管理办法适用于国家电网公司所属各级生产性企业以及( )、( )、( )。
A. 省电力公司
B. 产业公司
C. 专业公司
D. 国网公司
【多选题】
违章按照性质分为( )、( )和( )三类。
A. 管理违章
B. 行为违章
C. 装置违章
D. 习惯性违章
【多选题】
工作任务、危险点不清楚,会造成( )、( )、 ( )等问题。
A. 不能正确履行安全职责
B. 作业现场可控
C. 盲目作业
D. 风险控制不足
【多选题】
《国家电网公司安全事故调查规程》规定的一至四级事件对应国家相关法规定义的( )。
A. 特别重大事故
B. 重大事故
C. 较大事故
D. 一般事故
【多选题】
《国家电网公司安全事故调查规程》规定安全事故调查应做到“四不放过”具体指( )。
A. 事故原因未查清不放过
B. 责任人员未处理不放过
C. 责任人员未受到处罚不放过
D. 整改措施未落实不放过
【多选题】
《国家电网公司电力安全工器具管理规定》所称的安全工器具系指保障工作人员人身安全的个体防护装备、( )、( )、( )和标识牌等专用工具和器具。
A. 屏蔽服
B. 绝缘安全工器具
C. 登高工器具
D. 安全围栏(网)
【多选题】
安全工器具报废条件包括( )。
A. 经试验或检验不符合国家或行业标准的。
B. 在规定期限内重新检验的合格。
C. 超过有效使用期限,不能达到有效防护功能指标的。
D. 外观检查明显损坏影响安全使用的。
【多选题】
严禁在未落实现场( )、( )、( )等安全技术措施时作业。
A. 停电
B. 验电
C. 装设接地线
D. 合接地刀闸
【多选题】
《国网湖北省电力有限公司安全生产违章记分操作规范》适用于公司系统( )、( ),以及( )、( )。
A. 各集体企业(含农电服务公司)
B. 监理公司
C. 施工承(分)包商
D. 各单位
【多选题】
对未列入《典型违章记分标准》的违章,安全稽查人员有权参照标准认定违章( )、( )并给予违章记分。
A. 性质
B. 结果
C. 等级
D. 级别
【多选题】
国家电网有限公司员工奖惩规定,对员工的惩处主要包括( )、( )和( )三种方式。
A. 纪律处分
B. 经济处罚
C. 组织处理
D. 刑事处罚
【多选题】
公司所属各级单位发生责任性七级安全事件,对主要责任者给予纪律处分:( );或组织处理:( )。
A. 警告
B. 留用察看
C. 通报批评
D. 调整岗位
【多选题】
危险性较大的分部分项工程中建设单位应当依法提供( )、( )、( )的工程地质、水文地质和工程周边环境等资料。
A. 真实
B. 准确
C. 完整
D. 片面
【多选题】
严禁无资质或资质不合格、能力不满足要求的低素质队伍通过资质( )等手段参与专业承包或劳务分包。
A. 挂靠
B. 借用
C. 造假
D.
【多选题】
"根据评价后风险值的大小及所对
A. 稍有风险
B. 一般风险
C. 显著风险
D. 高度风险
【多选题】
监理项目部对施工项目部报送的施工分包资料进行备案,动态核查进场分包队伍的( )、( )、( )等施工能力,发现问题及时提出整改要求,实施闭环管理。
A. 人员配备
B. 施工机具配备
C. 技术管理
D. 安全措施
【多选题】
环境保护要求:严格遵守国家工程建设( )、( )、( )、( )和保护环境法律法规,倡导绿色环保施工,尽量减少施工对环境的影响。
A. 节地
B. 节能
C. 节水
D. 节材
【多选题】
分包安全管理遵循( )、( )、( )的原则。施工承包商落实分包安全管理的主体责任,对劳务分包人员实行统一管理,统一标准、统一培训、统一奖惩。施工承包商的上级主管部门负责监督管理,公司建立统一信息平台,对入场的每一位分包人员进行实名制管理。
A. “谁发包谁负责、“
B. “谁发包、谁监督”
C. “谁主管谁监督”
D. “统一平台实名制管理”
【多选题】
分包必须依据国家法律法规和《国家电网有限公司输变电工程施工分包安全管理办法》进行。严禁违法( )、( ),禁止无资质队伍采取资质借用、挂靠等手段参与分包;禁止施工承包商以包代管、以罚代管。
A. 承包
B. 分包
C. 转包
D. 承接
【多选题】
相线、N线、PE线的颜色标记必须符合以下规定:相线L1(A)、L2(B)、L1(C)相序的绝缘颜色依次为( )色; N线的绝缘颜色为淡蓝色;PE线的绝缘颜色为绿/黄双色。任何情况下上述颜色标记严禁混用和互相代用。
A. 黄
B. 绿
C. 红
D. 蓝
【多选题】
配电系统应设置配电柜或( ),实行三级配电。
A. 总配电箱
B. 分配电箱
C. 开关箱
D. 开关站
【多选题】
根据基坑工程安全风险评估等级,应提出风险控制措施。风险控制的基本对策包括( )。
A. 风险消除
B. 风险降低
C. 风险转移
D. 风险自留
【多选题】
基坑支护结构的支撑或锚杆体系出现( )的迹象。
A. 过大变形
B. 压屈
C. 断裂
D. 松弛
【多选题】
在风速达到10.8m/s及以上大风或( )等恶劣天气时,应停止露天的起重吊装作业。
A. 大雨
B. 大雪
C. 大雾
D.
【多选题】
4.2.13 起重机工作时,在( )动作中,只允许同时进行其中两种动作的复合操作。
A. 行走
B. 起升
C. 回转
D. 变幅
【多选题】
搭拆脚手架人员必须( )、( )、( )。
A. 戴安全帽
B. 系安全带
C. 穿防滑鞋
D. 绝缘线
【多选题】
脚手板应铺设( )、( ),并应用安全网双层兜底。
A. 坚固
B. 牢靠
C. 严实
D. 严正
【多选题】
在脚手架使用期间,严禁拆除下列杆件:主节点处的( )。
A. 纵、横向水平杆
B. 纵、横向扫地杆
C. 连墙件
D. 脚手板
【多选题】
土石方开挖前,应查明基坑周边影响范围内建(构)物、( )、( )、( )、( )及( )等地下管线情况,并采取措施保护其使用安全。
A. 上下水
B. 电缆
C. 燃气
D. 给水
【多选题】
作业人员和设备撤离通道( )或( )时,不应进行爆破作业。
A. 不安全
B. 堵塞
C. 畅通
D. 安全