【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
查看试卷,进入试卷练习
微信扫一扫,开始刷题

答案
AB
解析
暂无解析
相关试题
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
【多选题】
As part of a multisite Single Sign-On (SSO) deployment what two steps are required to ensure that a change to one Single Sign-On instance is propagated to the other instances? (Choose two.)___
A. Schedule a Replication Task on the primary instance
B. Select the first instance during the installation of subsequent instances
C. During the installation of each instance choose Linked-Mode
D. Enable Synchronize to Active Directory on each instance
【多选题】
You need to add an object to an existing vApp using the vSphere Web Client. How is this accomplished?___
A. Create an Object Inside the vApp.
B. Add an Object to a vApp.
C. Add an Object to the
D. atastore the vApp is located in.
【多选题】
Which three steps must be taken to use vSphere Update Manager 6.x to upgrade an ESXi 5.5 host to vSphere 6.x? (Choose three.)___
A. Download an ESXi Image.
B. Configure the vSphere Update Manager Download Service.
C. Create a baseline and attach it to the ESXi Host.
D. Scan the vCenter Content Library for the
E. SXi Image.
【多选题】
Which two options would allow a database administrator, with no access to the vSphere infrastructure, to connect to a virtual machine? (Choose two.)___
A. Use the Virtual Machine Remote Console (VMRC).
B. Use Remote Desktop Protocol (RDP) to connect.
C. Ask the vSphere administrator to grant permission to access the console through vCenter Server.
D. Ask the vSphere administrator to grant permission to access with the Horizon View Direct Connect Client.
【多选题】
Which three are architecture components of vRealize Operations? (Choose three.)___
A. Identity Server
B. Administrative Server
C. Analytics Server
D. Database Server
E. Connection Broker
推荐试题
【多选题】
47:下列有关【1058】单位活期账户启用交易的说法,错误的是___。
A. 基本户启用时,取现标志系统默认为可取现;
B. 临时户启用时,取现标志系统默认为可取现;
C. 一般户启用时,取现标志系统默认为可取现;
【多选题】
48:关于久悬账户管理,下列说法正确的是___
A. 已转为久悬的账户,账户控制状态为不收不付;
B. 已转为营业外收入的账户,账户控制状态为只收不付;
C. 账户从营业外支出转正常后,不可再次使用,需办理销户手续;
D. 账户从久悬户转正常后,不可再次使用,需办理销户手续。
【多选题】
49:【1132】单位账户维护交易,以下维护事项说法正确的是 ___
A. 机构证件类型、证件号码为客户的关键信息,在本交易中可以修改;
B. 可以增加除主证件类型外的其他证件号码;
C. 可以通过本交易实现变更基本户开户行行名、行号、账号、开户许可证号码等信息;
D. 可以通过本交易维护验资户转为基本户。
【多选题】
51:对于个人账户开户1052交易,以下说法错误的是___?
A. 不需要上传新开存单;
B. 需要上传个人业务交易单正、背面;
C. 个人业务交易单背面填写和勾选必须与系统一致;
D. 1052业务不需要拍摄现金。
【多选题】
52:以下关于单据和凭证规范使用说法错误的是哪一个?___
A. 制式凭证中的勾选项可以修改,需修改的应在错误处加盖柜员私章,且修改不能超过三处,超过三处的应重新填写凭证。
B. 凭证的修改不允许使用修正液,使用修正液的凭证应做作废处理,重新填写。
C. 各种单折上应在规定的位置加盖业务章或公章,没有盖章的视为无效凭证。
D. 个人有卡(折)存取款、存单(折)正常销户不必填制个人业务交易单。
【多选题】
59:银行业金融机构在收缴假币过程中,一次性发现假人民币( )张、枚(含)以上,假外币( )张、枚(含)以上的,应当立即报告当地公安机关并提供有关线索。___
A. 20,10
B. 10,5
C. 10,5
D. 20,5
【多选题】
60:根据公安部和中国人民银行联合下发了《关于进一步加强反假货币工作的通知》(公通字〔2009〕43号)要求,银行业金融机构一次性发现假人民币___元(含)以上的,要立即通报公安机关,一次性发现假人民币( )元(含)以上的,要在当天通报公安机关。
A. 500,100
B. 500,200
C. 400,100
D. 400,200
【多选题】
2:以下说法正确的是___
A. 各营业网点在分析客户风险等级时,对于风险级别介于相邻等级之间的,原则上应归入较高等级风险类客户进行管理
B. 客户在同一机构有多个账户的,该营业网点应综合多个账户的交易信息评定客户洗钱风险等级
C. 客户在多个营业网点开户且被评定为不同风险等级的,以其中较高的风险等级为准
D. 客户在多个营业网点开户且被评定为不同风险等级的,以其中较低的风险等级为准
【多选题】
3:以下行业的客户,哪些客户可评定为高风险客户___
A. 赌场等赌博性质的机构
B. 军事装备、武器制造分销等与武器有关的行业
C. 彩票销售行业
D. 艺术品、珠宝古董批发和零售行业
E. 律师行、会计师行
【多选题】
4:以下行业的客户,可评定为高风险客户的有哪些___
A. 贵金属、稀有矿石行业
B. 典当行
C. 拍卖行
D. 卡拉OK、夜总会、按摩、桑拿等文化娱乐行业
E. 上市公司
【多选题】
5:法定代表人、负责人等关键岗位人员, 以及客户本人或其账户控制人、受益人属于___的单位的客户,可评定为高风险客户。
A. 外国政要
B. 被政府及相关部门列入“黑名单”的客户
C. 被怀疑其经营活动或资金来源合法性的客户
D. 已经或正在接受行政或司法调查的客户
E. 有犯罪嫌疑或其他犯罪记录的客户
【多选题】
6:法定代表人、负责人等关键岗位人员, 以及客户本人或其账户控制人、受益人属于___的单位的客户,可评定为高风险客户。
A. 股权结构过于复杂、难于辨认实际受益人的客户
B. 故意隐瞒身份、拒绝提供有效身份证件或者其他身份证明文件的客户
C. 信用等级低,但经常从事高额度、高风险类业务的客户
D. 其他涉及洗钱及恐怖融资高风险属性的客户
【多选题】
7:符合下列哪个条件的个人和单位客户,可评定为低风险客户___
A. 外国政要
B. 党的机关、国家权力机关、行政机关、司法机关、政协机关、解放军、武警部队,但不包括其下属的各类企事业单位
C. 同业金融机构
D. 非盈利社会事业单位,如公立学校、公立医院
E. 上市公司
【多选题】
8:各风险等级客户基本信息审核频率为___
A. 高风险客户:自评定风险等级后,每三个月审核一次客户基本信息
B. 高风险客户:自评定风险等级后,每半年审核一次客户基本信息
C. 中风险客户:自评定风险等级后,每年审核一次客户基本信息
D. 低风险客户:自评定风险等级后,每两年审核一次客户基本信息
【多选题】
9:各营业网点客户风险等级分类管理员,除审核客户的基本信息外,还应对客户___等进行综合的分析和评价,以便对客户反洗钱风险等级进科学评定和及时调整。
A. 既往的交易特征
B. 交易量
C. 资金来源及用途
D. 交易频率
E. 交易动向
【多选题】
10:支行反洗钱工作实施小组具体履行下列职责___
A. 设立反洗钱岗位,指定专人作为支行反洗钱联络员,负责本支行反洗钱具体工作
B. 根据反洗钱法规和本行有关制度,指导和监督前台业务的反洗钱工作
C. 负责本辖区营业网点在履行反洗钱义务过程中发现可疑交易或涉嫌犯罪的及时上报总行
D. 协助有权部门对涉嫌洗钱犯罪的账户或存款进行查询、冻结、扣划
E. 负责组织本支行员工进行反洗钱培训和对客户的反洗钱宣传工作
【多选题】
11:支行各营业网点反洗钱工作人员由营业网点负责人担任,各营业网点反洗钱工作人员的职责有___
A. 负责组织本营业网点员工对大额交易和可疑交易进行实时监测
B. 负责按时对反洗钱系统自动提取的大额交易信息进行修改或删除后确认
C. 负责按时对本营业网点的可疑交易信息进行新增、修改或删除后确认
D. 负责检查本营业网点员工落实各项反洗钱规章制度情况,对发现的可疑交易进行分析、识别
E. 负责本网点客户风险的分类和调整工作
【多选题】
12:临柜人员的反洗钱职责有___
A. 严格执行存款账户实名制、账户管理办法及反洗钱相关规定,按要求对客户身份进行识别
B. 按要求留存客户身份资料和交易记录
C. 对经办的大额交易进行实时监测,超柜员权限的及时履行审批手续
D. 对柜台发现的可疑交易及时向营业网点反洗钱联络员汇报
E. 负责营业柜台的反洗钱宣传工作
【多选题】
13:涉及恐怖活动的资产被采取冻结措施期间,符合以下情形之一的,有关账户可以进行款项收取或者资产受让___
A. 收取被采取冻结措施的资产产生的孳息以及其他收益
B. 受偿债权
C. 为不影响正常的证券、期货交易秩序,执行恐怖活动组织及恐怖活动人员名单公布前生效的交易指令
D. 执行恐怖活动组织及恐怖活动人员名单公布后的交易指令
【多选题】
15:反洗钱内部审计包括哪些内容。___
A. 反洗钱组织机构建设情况
B. 反洗钱宣传和培训情况
C. 客户身份识别、持续识别情况
D. 客户洗钱风险等级划分情况
E. 大额和可疑交易报告情况, 可疑交易人工识别情况
【多选题】
16:有下列___行为的,总行将责令限期改正,并视情节给予相关责任人200至1000元罚款,情节严重的,给予纪律处分或行政处分,触犯法律的,移送司法机关追究责任。
A. 未按照规定履行客户身份识别的
B. 未按照规定保存客户身份识别和交易记录,或私自将客户身份资料泄露给他人的
C. 未按规定手续办理大额取现的
D. 未按规定报送大额交易报告和可疑交易报告的
E. 与身份不明的客户进行交易或为客户开立匿名、假名账户的
【多选题】
17:根据〈金融机构大额交易和可疑交易报告管理办法〉(中国人民银行令〔2016〕第3号)的规定,符合下列___的大额交易应当通过反洗钱系统提交大额交易报告。
A. 当日单笔或者累计人民币交易5万元以上(含5万元)、外币等值1万美元以上(含1万美元)的现金缴存、现金支取、现金结售汇、现钞兑换、现金汇款、现金票据解付及其他形式的现金收支。
B. 非自然人客户银行账户与其他的银行账户发生当日单笔或者累计交易人民币200万元以上(含200万元)、外币等值20万美元以上(含20万美元)的款项划转。
C. 自然人客户银行账户与其他的银行账户之间发生当日单笔或者累计交易人民币50万元以上(含50万)、外币等值10万美元以上(含10万美元)的境内款项划转。
D. 自然人客户银行账户与其他的银行账户之间发生当日单笔或者累计交易人民币20万元以上(含20万)、外币等值1万美元以上(含1万美元)的跨境款项划转。
E. 非自然人客户银行账户与其他的银行账户发生当日单笔或者累计交易人民币100万元以上(含100万元)、外币等值10万美元以上(含10万美元)的款项划转。
【多选题】
18:对符合下列___条件的大额交易,如未发现该交易或行为可疑的,可以不报告大额交易报告。
A. 定期存款到期后,不直接提取或者划转,而是本金或者本金加全部或者部分利息续存入在同一机构开立的同一户名下的另一账户。
B. 自然人实盘外汇买卖交易过程中不同外币币种间的转换。
C. 交易一方为各级党的机关、国家权力机关、行政机关、司法机关、军事机关、人民政协机关和人民解放军、武警部队,但不包含其下属的各类企事业单位。
D. 各机构在黄金交易所进行的黄金交易
E. 证券公司、期货公司、基金管理公司与客户进行金融交易并通过本行账户划转款项的
【多选题】
19:下列哪些金融机构与客户进行金融交易并通过本行账户划转款项的,由本行通过省联社反洗钱系统按照人民银行相关要求提交大额交易报告。___
A. 证券公司、期货公司、基金管理公司
B. 保险公司、保险资产管理公司
C. 信托公司、金融资产管理公司
D. 金融租赁公司、汽车金融公司
【多选题】
20:本行在履行客户身份识别义务时发现下列哪些可疑行为的,也应通过反洗钱系统提交可疑交易报告。___
A. 客户拒绝提供有效身份证件或者其他身份证明文件的
B. 对向境内汇入资金的境外机构提出要求后,仍无法完整获得汇款人姓名或者名称、汇款人账号和汇款人住所及其他相关替代性信息的
C. 客户无正当理由拒绝更新客户基本信息的
D. 采取必要措施后,仍怀疑先前获得的客户身份资料的真实性、有效性、完整性的
E. 履行客户身份识别义务时发现的其他可疑行为
【多选题】
21:本行对通过交易监测标准筛选出的交易进行人工分析、识别,并记录分析过程,不作为可疑交易报告的,应当记录分析排除的合理理由,包括但不限于___
A. 客户的身份、客户的职业(行业)
B. 客户的年龄
C. 经营范围
D. 交易目的
E. 交易对手情况
【多选题】
22:出现以下___情况时,本行各营业机构应当重新识别客户。
A. 客户提出销户
B. 客户行为或者交易情况出现异常的
C. 客户姓名或者名称与国务院有关部门、机构和司法机关依法要求金融机构协查或者关注的犯罪嫌疑人、洗钱和恐怖融资分子的姓名或者名称相同的
D. 客户有洗钱、恐怖融资活动嫌疑的
E. 先前获得的客户身份资料的真实性、有效性、完整性存在疑点的