【单选题】
An administrator is troubleshooting network communications between a vCenter Server and an ESXi 6.5 host. Which log shows the related events between these components?___
A. /var/log/fdm.log
B. /var/log/vpxa.log
C. /var/log/hostd.log
D. /var/log/auth.log
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
B
解析
暂无解析
相关试题
【单选题】
An administrator has recently upgraded from vSphere 6.0 to 6.5, and can no longer see the software iSCSI named vmhba33. Which could be the reason for this?___
A. The upgrade has changed the vmhba name.
B. vSphere 6.5 automates iSCSI configurations.
C. vSphere 6.5 no longer supports software iSCSI.
D. The upgrade has deleted the vmhba.
【单选题】
An administrator is trying to vMotion a VM from his datacenter to a recovery site. Which is the maximum allowed RTT (Round-Trip Time) latency between source and destination host?___
A. 100 milliseconds
B. 150 milliseconds
C. 15 milliseconds
D. 10 milliseconds
【单选题】
Which is required for configuring iSCSI Software Adapter network port binding?___
A. VMkernel of the iSCSI traffic must be load balanced using Route based on IP Hash algorithm.
B. VMkernel of the iSCSI traffic must be load balanced using Route based on Source Virtual Port ID algorithm.
C. VMkernel of the iSCSI traffic must be load balanced using Route based on Source MAC Hash algorithm.
D. VMkernel of the iSCSI traffic must be bound to only one active network adapter.
【单选题】
In vSphere Data Protection 6.1, which is the function of a Backup Verification job?___
A. None. Backup Verification job is not a feature of vSphere Data Protection
B. It is a manual task -Power it on -Verify the guest OS -Check started applications
C. It is an automatic process -Restore a virtual machine -Power it on -Verify that the guest OS is booted by communicating with the Backup Verification agent
D. It is an automatic process -Restore a virtual machine -Power it on -Verify that the guest OC is booted by detecting the VMware ToolsTM "heartbeats"
【单选题】
An administrator has enabled vSphere Distributed Switch Health Check. The hosts connected to that Distributed Switch all display an alert:< vSphere Distributed Switch MTU supported status > .The administrator has all of the VMkernel ports MTU sizes set to 1600. Which action will remedy this problem?___
A. Configure the Distributed Switch to MTU 9100.
B. Disconnect and reconnect the physical network cable.
C. Configure the physical switch to MTU 1600.
D. Disable the Distributed Switch MTU.
【单选题】
Which Host Profile Subprofile configuration is used to configure firewall settings for ESXi hosts?___
A. Advanced Configuration Settings
B. General System Settings
C. Security
D. Networking
【单选题】
Where would a vSphere administrator find general vCenter Server logs on a vCenter Server Appliance?___
A. /var/log/vmware/vpxd/
B. /var/log/messages
C. /etc/vmware-vpx/
D. /var/log/vmware/vsan-health/
【单选题】
An administrator wishes to enable network port mirroring based on source port. Which feature should be enabled?___
A. vSphere standard switch port
B. ERSPAN
C. NSX Virtual Wire
D. VLAN
【单选题】
Which CLI command shows the physical uplink status for a vmnic?___
A. esxcli network ip connection list
B. esxcli network ip neighbor list
C. esxcli network nic get
D. esxcli network nic list
【单选题】
Which is the maximum number of block devices (LUNs) that are supported by ESXi hosts that are running version 6.5?___
A. 1024
B. 512
C. 2048
D. 256
【单选题】
When performing a vCenter Server 5.5 for Windows with Microsoft SQL Server Express database migration to vCenter Server Appliance 6.5, which will be the target database?___
A. Microsoft SQL Server Express 2012R2
B. Microsoft SQL Server Standard 2012R2
C. PostgreSQL
D. Oracle DB 11g
【单选题】
An administrator has multiple vCenter Server 6.5 systems but cannot enable Storage I/O Control (SIOC) on a datastore shared by ESXi hosts managed by the vCenter Server systems. Which action should the administrator take to resolve the issue?___
A. Unmount the datastore and then enable SIOC on the vCenter Server system.
B. Configure the datastore to be managed by a single vCenter Server system.
C. Configure Storage DRS and then enable SIOC on the vCenter Server system.
D. Enable Raw Device Mapping (RDM) on the
E. SXi hosts.
【单选题】
“OneAppServer” is a VM template stored in a content library named “LibraryOne”, but the vSphere administrator is not able to use this template for deployment. Why is the administrator unable to deploy OneAppServer?___
A. OneAppServer must be updated before it can be deployed.
B. LibraryOne is a subscribed library and OneAppServer is not downloaded yet.
C. LibraryOne is published and optimized for syncing over HTTP.
D. OneAppServer was imported from a local file on the system.
【单选题】
An administrator sets the Failover Capacity for both CPU and Memory at 25%. Based on the Exhibit below, how much of the cluster’s total CPU resources are still available to power on additional virtual machines?___
A. 45%
B. 25%
C. 70%
D. 60%
【单选题】
Which statement applies to the vSphere Replication appliance?___
A. Only one vSphere Replication appliance can be deployed per vCenter Server instance.
B. VMware Tools in the vSphere Replication appliance can be upgraded.
C. A single vSphere Replication appliance can manage a maximum of 4000 replications.
D. vSphere Replication is available only with the vSphere
E. ssentials Plus license.
【单选题】
Which esxcli namespace can a vSphere Administrator use to adjust the queue depth?___
A. esxcli system module parameters
B. esxcli storage core device
C. esxcli system module set
D. esxcli storage core adapter
【单选题】
Which statement regarding datastore clusters meets VMware’s recommended best practices?___
A. Clusters should contain only datastores presented from the same storage array.
B. Clusters should contain only datastores with equal hardware acceleration capability.
C. Clusters should contain only datastores with the same capacity.
D. Clusters should contain only datastores using the same connection method (iSCSI, FC, etc.).
【单选题】
What VM Monitoring setting would ensure that the maximum reset window for a virtual machine is 24 hours?___
A. Medium
B. Low
C. High
D. Normal
【单选题】
What is the default space threshold for vSphere Storage DRS?___
A. 80%
B. 70%
C. 90%
D. 95%
【单选题】
Which is the correct sequence to upgrade a vSphere infrastructure?___
A. vCenter Server>ESXi host> VMware Tools>VM compatibility
B. ESXi host>vCenter Server> VMware Tools>VM compatibility
C. vCenter host> ESXi host> VM compatibility> VMware Tools
D. ESXi host>vCenter Server> VM compatibility>VMware Tools
【单选题】
An administrator has a large boot from SAN cluster and wants to ensure consistent configuration by using host profiles. What special considerations are required for boot from SAN hosts?___
A. Change the “Device is shared clusterwide” setting to “false” in the host profile.
B. Verify that the boot LUN is correctly identified as the boot device in the host profile.
C. The boot from SAN device must report as a local device.
D. Host profiles are incompatible with boot from SAN hosts.
【单选题】
When using VMware Converter to import a Windows server and improve the consistency of the destination virtual machine, which optional step can be performed immediately prior to powering down the source server?___
A. Perform a final synchronization task.
B. Remove the server from the network.
C. Uninstall production applications.
D. Remove the server from the Active Directory domain.
【单选题】
Restoration of the vCenter Server Appliance is accomplished using which interface?___
A. vSphere Web Client
B. vSphere Client
C. vCenter Server Appliance Management Interface
D. vCenter Server Appliance GUI Installer
【单选题】
When attempting to migrate a virtual machine to another host in the same cluster, the error message, “Select a valid compute resource” returns. What could cause this error?___
A. Both hosts run different versions of ESXi.
B. Both hosts are not sharing the same datastore.
C. VMware Tools is not installed.
D. Virtual machine has an ISO attached.
【单选题】
When will vSphere Data Protection delete the expired backup image of a Platform Service Controller?___
A. Immediately after the retention period has expired.
B. After the expired backup image is restored.
C. During the next backup window following expiry.
D. During the next maintenance window following expiry.
【单选题】
Group A has permission to download files in Content Library. Group B does not have permission to download files in Content Library. If a user is a member of both groups, what will be the result?___
A. The user cannot download file from Content Library.
B. The user can download file from Content Library.
C. The user cannot access Content Library.
D. The user can access Content Library.
【单选题】
An administrator is trying to set up Host Partial Failure Response, but the Automated option is grayed out. What can the administrator change to enable the Automated option?___
A. Change the vSphere DRS Automation level to Partially Automated.
B. Change the vSphere DRS Automation level to Fully Automated.
C. Enable vSphere HA Host Monitoring.
D. Change the vSphere DPM Automation level to Automatic.
【单选题】
When you attempt to open a virtual machine console from the vSphere Web Client, the console does not connect. The following error message appears:<HTTP ERROR 404> <Problem accessin/.Reason: Not Found>. Why did not connect?___
A. Port 443 is in use.
B. Port 9443 is in use.
C. Port 8443 is in use.
D. Port 22443 is in use.
【单选题】
What new feature was introduced to the Content Library in vSphere 6.5?___
A. Mount an ISO directly from the Content Library.
B. Deploy a virtual machine from an OVF Package in a Content Library.
C. Upload a File from a URL to a Library Item.
D. Upload a File from a Local System to a Library Item.
【单选题】
How can an administrator exclude Encryption rights from a support engineer?___
A. Clone the role Virtual machine power user, remove Cryptographic operations privileges.
B. Clone the role Administrator and assign to the support engineer.
C. Clone the role Virtual machine power user and assign to the support engineer.
D. Clone the role No cryptography administrator and select privileges only for the support engineer.
【单选题】
The administrator must back up a vCenter HA deployment. Which component must be backed up?___
A. Passive node
B. Witness node
C. External database
D. Active node
【单选题】
What is the supported protocol to perform remote L3 traffic monitoring in vSphere 6.5?___
A. VXLAN
B. ERSPAN
C. RSPAN
D. SPAN
【单选题】
What are the minimum hardware requirements for a Windows vCenter Server with embedded PSC that manages a “Small” environment?___
A. 2vCPUs, 16 GB RAM
B. 4 vCPUs, 16 GB RAM
C. 2 vCPUs, 10 GB RAM
D. 4 vCPUs, 10 GB RAM
【单选题】
Which port is used for communication between ESXi and vSphere Data protection?___
A. 80
B. 443
C. 902
D. 22
【单选题】
What can prevent Storage DRS from functioning on a datastore?___
A. The datastore is configured for Virtual Machine Swapfile location.
B. The datastore is shared across multiple datacenters.
C. The datastore is connected to a host that is running Storage I/O Control.
D. Storage DRS advanced option IgnoreAffinityRulesForMaintenance is set to 1.
【单选题】
When troubleshooting VMware vCenter Server issues, when logging level provides maximum detail?___
A. Verbose
B. Trivia
C. Info
D. Error
【单选题】
What new feature is introduced in NFS 4.1 on ESXi 6.5?___
A. IPv6
B. KRB5i
C. AUTH_SYS
D. Storage DRS
【单选题】
What configuration option would ensure that a virtual NUMA topology is defined on VMs having more than eight virtual CPUs?___
A. cupid.coresPerSocket
B. numa.vcpu.followcorespersocket
C. numa.vcpu.maxPerVirtualNode
D. numa.vcpu.min
【单选题】
What is the minimum disk space required to deploy vSphere Data Protection (VDP) with 8 TB configuration?___
A. 4 TB
B. 16 TB
C. 8 TB
D. 12 TB
【单选题】
What advanced option for vSphere HA defines a maximum number of reset attempts by VMCP for a virtual machine?___
A. das.maxterminates
B. das.isolationshutdowntimeout
C. das.maxresets
D. fdm.isolationpolicydelaysec
推荐试题
【判断题】
电费小红包不可以提现
A. 对
B. 错
【判断题】
【x】106、根据《快响服务工作规定》,流程归档后,由服务快响组在12小时对客户进行电话回访,填写调查问卷,收集客户1电力服务的意见及建议
A. 对
B. 错
【判断题】
【x】107、新受理客户报装信息应符合客户基础信息校验规则要求,留下客户正确的联系方式,经办人受委托办理的报装业务,只需维护客户本人联系信息即可
A. 对
B. 错
【判断题】
【x】108、“三型一化”营业厅转型应扩大收费区功能,提升自助区功能,推进自助设备功能业务全覆盖、使用便捷化
A. 对
B. 错
【判断题】
“三型一化”转型应坚持效益原则。优化营业厅功能布局、网络与实体渠道安排,大力推行网上办电交费,让“信息多跑路、客户少跑腿”,推动以较低成本投入获取良好服务体验
A. 对
B. 错
【判断题】
【x】110、“三型一化”转型后营业厅将取消业务办理区,全面引导并指导客户至自助服务区线上办理业务
A. 对
B. 错
【判断题】
【x】111、客户不具备民事行为能力,或因客户自身原因造成的,可以不合理投诉为由发起申诉
A. 对
B. 错
【判断题】
【x】112、服务投诉是指供电企业在处理具体营业业务过程中存在工作超时限、疏忽、差错等引发的客户投诉
A. 对
B. 错
【判断题】
【x】113、投诉以客户表达强烈不满或明确提出投诉意愿作为派发唯一依据
A. 对
B. 错
【判断题】
投诉申诉涉及非供电企业业务、恶意投诉的,允许采用经省市公司专业部门签字盖章的申诉证明材料
A. 对
B. 错
【判断题】
【x】115、演练过程中发生的突发事件和不可控因素,参演人员应及时中止部分项目的演练
A. 对
B. 错
【判断题】
演练前必须做好协调沟通,确保演练过程中无人员伤亡、无财务损失、无设备故障的异常情况发生
A. 对
B. 错
【判断题】
【x】117、结合实际情况和自身条件,不定期举行营业厅应急演练,提高应急响应能力
A. 对
B. 错
【判断题】
演练的目的包括检验供电营业厅工作人员的组织协调能力
A. 对
B. 错
【判断题】
柜台业务办理人员及营业厅保安对营业厅其他客户进行有序的安抚指引
A. 对
B. 错
【判断题】
【x】122、发生意外事件主要指在营业厅内发生如打架、偷窃、损坏物品等属于治安类事件的情况
A. 对
B. 错
【判断题】
与客户交接物品时,供电企业工作人员应双手递送,不抛不丢,交接现金时唱收唱付
A. 对
B. 错
【判断题】
《国家电网公司供电客户服务提供标准》规定,客户是指已经与供电企业建立供用电关系的组织或个人
A. 对
B. 错
【判断题】
供电客户服务是在电力供应过程中,企业为满足客户获得和使用电力产品的各种相关需求的一系列活动的总称。简称“客户服务”
A. 对
B. 错
【判断题】
因计算机系统出现故障而影响业务办理时,若短时间内可以恢复,应请客户稍候并致歉;若需较长时间才能恢复,请客户明天再来办理
A. 对
B. 错
【判断题】
供用电合同的变更或者解除,应当依照有关法律,行政法规和《电力供应与使用条例》的规定办理
A. 对
B. 错
【判断题】
对申请新装、增容用电的居民客户,应核定用电容量,用电需求,确认供电电压、计量装置位置和接户线的路径、长度
A. 对
B. 错
【判断题】
对现场不具备供电条件的,可不在勘查意见中说明原因,只须向客户做好口头解释
A. 对
B. 错
【判断题】
供电营业规则》中规定:从破产用电客户分离出去的新户,必须在还清原破产用电客户电费和其他债务后,方可办理用电手续。否则,供电企业可按违约用电处理
A. 对
B. 错
【判断题】
实行营业厅“一证受理”,在收到客户用电主体资格证明并签署“承诺书”后,收资后正式受理用电申请
A. 对
B. 错
【判断题】
营业厅综合柜员,办理客户正常电费退费,应通过退费流程并提供相应资料,到财务部门申请费用进行退费,不得从当日现金收费中支出
A. 对
B. 错
【判断题】
《中华人民共和国电力法》规定:用户对供电质量有特殊要求的,供电企业应当根据其用电性质、用电容量和电网的可能,提供相应的电力
A. 对
B. 错
【判断题】
营业厅安保人员兼职流动消防员职责,熟悉消防设施的位置和使用方法,能对起火事故第一时间做出反应,能够及时疏散客户与工作人员,并利用现有消防设备进行灭火
A. 对
B. 错
【判断题】
业厅消防安全管理要求实行“每月一检查”制度,重点巡查消防设备完备情况以及监控死角、火灾多发区的消防安全情况
A. 对
B. 错
【判断题】
营业厅内填单区、客户等候区、公共雨伞租借区、自助柜台机区等区域内设施摆放位置合理,禁止大量物料堆叠
A. 对
B. 错
【填空题】
1、推行居民客户“免填单”服务,业务办理人员了解客户申请信息并录入营销业务应用系统,生成___,打印后交由客户签字确认。
【填空题】
2、暂停期满或每一日历年内累计暂停用电时间超过___的用户,不论是否申请恢复用电,供电企业须从期满之日起,恢复其原电价计费方式,并按合同约定的容量计收基本电费。
【填空题】
3、在用电地址、用电容量、用电类别、供电点等不变,仅电能计量装置安装位置变化的情况下,可办理___手续。
【填空题】
4、更名一般只针对___的名称的变更。
【填空题】
5、改类流程正式受理后,不需要换表在___个工作日内归档;需要换表的,在___个工作日内归档。
【填空题】
6、同城异地营业厅应在1个工作日内将收集的客户报装资料传递至属地营业厅,实现___。
【填空题】
7、实行勘查装表___作业。具备直接装表条件的,在勘查确定供电方案后当场装表接电。
【填空题】
8、竣工检验受理后___个工作日内,按照与用户预约的时间,组织开展竣工检验。根据国家、行业标准、规程和用户竣工报验资料,对受电工程涉网部分进行全面检验。
【填空题】
9、申请暂停用电,每次应不少于___天,每一日历年内暂停时间累计不超过六个月,次数不受限制。
【填空题】
10、在___、___、___、供电点等不变,仅电能计量装置安装位置变化的情况下,可办理移表手续。