【单选题】
An administrator enables High Availability (HA) on a Virtual SAN cluster.Which network is used for HA Network Heatbeat configuration?___
A. The Management network.
B. The vMotion network.
C. The Virtual SAN network.
D. The Provisioning Traffic network.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
C
解析
暂无解析
相关试题
【单选题】
A user wants to monitor a business-critical virtual machine to ensure that it doesn't run out of resources. What metric could be monitored in vRealize Operations to address this concern?___
A. Time Remaining badge
B. Compliance badge
C. Reclaimable Waste badge
D. Density badge
【单选题】
An administrator has recently installed a new ESXi 6.x Host, and during the configuration notices sporadic network problems. To check whether the issue occurred sometime during the configuration, the administrator would like to reset the system.How can this be accomplished in the shortest amount of time?___
A. Run the ESXi installer again and reinstall the host.
B. Select the Reset System Configuration option from the vSphere Client when connected directly to the host.
C. From the
D. irect Console User Interface, select Reset System Configuration.
【单选题】
A vApp is running out of compute resources when overall activity is high within the resource pool. At other times, everything is fine.What should be done to resolve this issue?___
A. Increase the size of the resource pool Shares.
B. Set the vApp's CPU and Memory Reservation Type to Expandable.
C. Set the vApp's CPU and Memory Limit to Unlimited.
D. Create a new resource pool with the existing hardware configuration.
【单选题】
A virtual machine has been renamed and an administrator is unable to find files with the new virtual machine name in the datastore.What is the reason for this?___
A. The names of the files on the datastore do not change.
B. The names of the files on the datastore have been corrupted.
C. The virtual machine needs to be re-added to the inventory.
D. The Distributed Resource Scheduler moved the virtual machine to another host.
【单选题】
An administrator has configured network connectivity for a new virtual machine, as shown in the Exhibit.What will occur with the network traffic of this virtual machine when communicating externally from vSwitch1?___
A. The virtual machine will communicate on both uplinks
B. The virtual machine will only communicate on vmnic1
C. The virtual machine will only communicate on vmnic2
D. The virtual machine will fail to communicate externally
【单选题】
An administrator is unable to create the first group in a new vRealize Operations environment. What is the likely cause of the problem?___
A. There are no group types defined.
B. The group is not defined in SSO.
C. There are more than 32 group types defined.
D. The description for the group is not provided.
【单选题】
A new vApp was built and tested in the corporate headquarters datacenter running vSphere 6.x. What condition would explain why the virtual machine is failing to boot in an offsite datacenter running on vSphere 5.5?___
A. The virtual machine was built with the default hardware version.
B. The VMFS 5 datastore is not compatible with virtual machines configured with vSphere 6.x.
C. a
D. RS 5.5 cluster cannot run virtual machines configured with vSphere 6.x.
【单选题】
An administrator is evaluating whether to deploy vCenter Server on a Windows server or on a vCenter Server appliance. The administrator has the following requirements: <A web browser will be utilized to manage the vSphere environment.> <16 ESXi hosts will be deployed.> <Licenses must be shared with a vCenter Server at another site.> <An external Oracle 10g database server will be used to host the vCenter Server database.> Why will the administrator need to deploy vCenter Server on a Windows server?___
A. Linked Mode is a requirement for the solution.
B. Oracle 10g is a requirement for the solution.
C. The vSphere web client is a requirement for the solution.
D. Management of more than 5 hosts is a requirement for the solution.
【单选题】
What is a benefit of using VMware Data Protection ?___
A. Provides support for guest-level backups and restores of Microsoft SQL Servers, Exchange Servers, and Share Point Servers.
B. Provides support for advanced storage services including replication, encryption, deduplication, and compression.
C. Provides direct access to VDP configuration integrated into the vSphere Client.
D. Reduces disk space consumed by virtual machine data using deduplication.
【单选题】
An administrator enables vSphere High Availability (HA) on an existing cluster with a large number of hosts and virtual machines. The administrator notices that the setup of vSphere HA on some of the hosts is failing. What step, if taken, might resolve this issue?___
A. Increase the value of the config.vpxd.das.electionWaitTimeSec setting.
B. Set the value of vpxd.das.aamMemoryLimit to 256.
C. Set the value of the das.useDefaultIsolationAddress setting to False.
D. Increase the value of the das.iostatsinterval setting.
【单选题】
An ESXi 6.x host consists of 24 logical cores. Hyperthreading is enabled on the host. What is the maximum number of vCPUs that can be assigned to a virtual machine on this host?___
A. 24
B. 48
C. 64
D. 128
【单选题】
By default, each ESXi 6.x host is provisioned with a certificate from which root certificate authority?___
A. RedHat Certificate Authority
B. VMware Certificate Authority
C. DigiCert Certificate Authority
D. Verisign Certificate Authority
【单选题】
An administrator is adding an NFS datastore as shown in the Exhibit. What is the purpose of the Servers to be added list?___
A. It contains the IP addresses of the NFS Storage Server to provide multipathing capability.
B. It contains the IP addresses of the ESXi hosts that mount the datastore.
C. It contains the IP addresses used for
D. ynamic Discovery of targets.
【单选题】
An administrator reports that the System Event log data is only available for 24 hours when reviewing the Hardware Status tab. Which condition could be responsible for the loss of data?___
A. A Reset event log was executed.
B. The statistical collection level was set to a value of 1.
C. The boot disk of the host is corrupt.
D. Syslog has been configured at the vCenter Server level.
【单选题】
During an upgrade, the ESXi 6.x installer finds an existing version of ESXi and a VMFS3 volume. No virtual machines exist on the host or VMFS3 volume. The requirement is to upgrade to VMFS5. Which option should be chosen to meet this requirement?___
A. Upgrade ESXi and preserve the VMFS datastore
B. Install ESXi and preserve the VMFS datastore
C. Install ESXi and overwrite the VMFS datastore
D. Upgrade
E. SXi and overwrite the VMFS datastore
【单选题】
A vSphere 6.x Standard Switch is configured with 4 virtual machine portgroups, as shown in the exhibit. Which portgroup would be utilized by default when creating a new virtual machine?___
A. Access Network
B. DMZ Network
C. VM Network
D. Virtual Machine Network
【单选题】
Which vSphere 6.x feature will allow an organization to utilize native snapshots?___
A. Virtual Volumes
B. Virtual SAN
C. VMFS3
D. VMFS5
【单选题】
An administrator is creating a new vSphere Distributed Switch that will be utilized with a specific vSphere Cluster. The cluster itself contains a mix of ESXi 5.x and 6.x Hosts. Which Distributed Switch version should be created to support this configuration?___
A. Distributed Switch: 6.0.0
B. Distributed Switch: 5.0.0
C. Distributed Switch: 5.1.0
D. Distributed Switch: 5.5.0
【单选题】
Which load balancing policy, previously limited to vSphere Distributed Switches, is now available on vSphere Standard Switches with vSphere 6.x?___
A. Route based on physical NIC workload
B. Route based on IP Hash
C. Route based on the originating virtual port
D. Route based on Source MAC Hash
【单选题】
A storage administrator is not seeing full utilization of all bandwidth from an ESXi host. The vSphere administrator observes the adapter details, as shown in the Exhibit. What is the probable cause of this issue?___
A. Another path needs to be used to allow full utilization of the bandwidth.
B. The array is not setup to use the correct multipathing policy.
C. There are no virtual machines on the host.
D. No traffic is being sent across it because a path failed.
【单选题】
A storage administrator is not seeing full utilization of all bandwidth from an ESXi host. The vSphere administrator observes the adapter details, as shown in the Exhibit. What is the probable cause of this issue?___
A. Another path needs to be used to allow full utilization of the bandwidth.
B. The array is not setup to use the correct multipathing policy.
C. There are no virtual machines on the host.
D. No traffic is being sent across it because a path failed.
【单选题】
An administrator has just completed performing an interactive installation of ESXi 6.x and is booting the host. How is the network initially configured?___
A. The network is configured by Automatic Private IP Addressing (APIPA).
B. The network is configured based on the settings detected in DNS.
C. The network is configured with the address as specified in the installer.
D. The network is automatically configured by DHCP.
【单选题】
You have just installed an ESXi 6.x Host. As part of your company security regulations, a security banner must be presented on the console of the host. How can this action be accomplished?___
A. Configure the Advanced Settings > Annotations screen of the ESXi host.
B. This is configured from the Direct Console User Interface configuration menu.
C. It is not possible to configure a security banner for the ESXi host.
D. From vCenter Server, this setting is configured globally in the vCenter Server configuration.
【单选题】
An administrator is only able to see the Health Badge when using the vRealize Operations user interface. What is the likely cause of this behavior?___
A. The vRealize Operations Foundation License is in use.
B. The vmware-sps service failed to start.
C. The vRealize Operations Standard License is in use.
D. The vmware-rbd-watchdog service failed to start.
【单选题】
An administrator has configured an alarm to be notified when a virtual machine meets either of these conditions: <High virtual CPU> <High active memory consumption.> <The alarm is only triggering when both of the conditions are met.> What can be done to correct the alarm behavior?___
A. Edit the alarm and select Trigger if ANY of the following conditions are satisfied.
B. Edit the alarm and select Trigger if ALL of the following conditions are satisfied.
C. Create two separate alarms, one for CPU and one for memory and link them together with ESXCLI.
D. Delete the existing alarm and create a new event based alarm.
【单选题】
An administrator creates an ESXi cluster using vSphere Auto Deploy. The ESXi hosts are configured to get a management IP address from a DHCP server. The administrator needs to troubleshoot the management network on one of the hosts. Which DCUI option should the administrator use to renew the DHCP lease? ___
A. Restart Management Network
B. Restore Network Settings
C. Test Management Network
D. Configure Management Network
【单选题】
An administrator is attempting to restore a number of files in a directory within the Operating System of a virtual machine. How can the administrator restore the files from a previous backup? ___
A. Use the File Level Restore option from the selected backup of the virtual machine in the vSphere Web Client.
B. Connect to the File Level Restore tool from a web browser in the virtual machine.
C. Connect to the File Level Restore tool from the VMware
D. ata Protection appliance.
【单选题】
After selecting an object in vRealize Operations, how can a user compare the badge values of related child objects? ___
A. Use the Scoreboard tab
B. Use the Relationship tab
C. Use the Members tab
D. Use the Overview tab
【单选题】
You want to deploy a vApp and dynamically assign IP addresses without a DHCP server on the network. Which action would you take to accomplish this task? ___
A. Enable IP pools.
B. Configure a local DHCP server in the vApp.
C. Enable NAT on the vApp router.
D. Configure the guest OS for workgroup and WINS.
【单选题】
What is the optimal configuration when building a virtual machine for a single-threaded Windows application? ___
A. Deploy single-threaded applications on uniprocessor virtual machines.
B. Deploy single-threaded applications on symmetric multi-processor virtual machines.
C. Tune single-threaded applications to take advantage of symmetric multi-processor resources.
D. Tune Single-threaded applications at the hypervisor level.
【单选题】
An administrator has created the resource pool configuration shown in the Exhibit. Based on the exhibit, which virtual machine(s) can be successfully powered on? ___
A. VM-M1 only
B. VM-K1 only
C. VM-K1 and VM-K2 only
D. VM-K1, VM-K2, and VM-M1
【单选题】
Which vSphere 6 Enterprise Edition feature will allow an organization to ensure that critical multi-threaded applications have the maximum possible uptime? ___
A. Fault Tolerance
B. High Availability
C. Distributed Resource Scheduler
D. App HA
【单选题】
An administrator has a virtual machine that requires four times the compute resources than other virtual machines on the same ESXi 6.x host. How should the administrator configure the virtual machine settings, in order to be prepared for any resource contention? ___
A. Set the shares of the priority virtual machine to High and the rest to Low.
B. Set the shares of the priority virtual machine to High.
C. Set the shares of the priority virtual machine to High and the rest to Normal.
D. Set the shares of the priority virtual machine to Normal and the rest to Low.
【单选题】
Which type of Adapter does not require vmkernel networking? ___
A. Independent Hardware iSCSI Adapter
B. Dependent Hardware iSCSI Adapter
C. Software iSCSI Adapter
D. Software FCoE Adapter
【单选题】
During the installation of ESXi 6.0, the following error message is reported: Hardware Virtualization is not a feature of the CPU, or is not enabled in the BIOS. Which condition would generate this message? ___
A. LAHF/SAHF is not enabled in the BIOS.
B. NX/XD is not enabled in the BIOS.
C. SSE3 is not enabled in the BIOS.
D. Hyperthreading is not enabled in the BIOS.
【单选题】
An administrator is unable to login to vCenter Server when using the vSphere web client. The administrator successfully accessed vCenter Server using the client earlier the same day. What is the most appropriate first step the administrator should take to resolve this issue? ___
A. Verify the web browser being used has Adobe Flash plugin version 11.5 or later
B. Verify the vCenter Single Sign-On service is running on the vCenter Server
C. Verify the vSphere Web Server service is running on the vCenter Server
D. Verify the administrator has permissions configured in vCenter Server
【单选题】
An administrator has configured an alarm to be notified when a virtual machine meets two conditions: <high virtual CPU> <high active memory consumption> The alarm is malfunctioning and triggering when either condition is met instead of both. What can be done to correct the issue? ___
A. Edit the alarm and select Trigger if ALL of the following conditions are satisfied.
B. Edit the alarm and select Trigger if ANY of the following conditions are satisfied.
C. Create two separate alarms, one for CPU and one for memory.
D. Delete the existing alarm and create a new event based alarm.
【单选题】
What must be enabled to ensure that VM Component Protection (VMCP) works in a High Availability cluster? ___
A. VMware Tools Virtual Machine Communication Interface (VMCI)
B. Fault Tolerance
C. Atomic Test and Set (ATS)
D. All Paths Down (APD) Timeout
【单选题】
An administrator wants to add a web server to an existing multi-tier application consisting of three virtual machines: <A web server> <A database server An application server> The web server should be added to the application when the primary web server reaches: <70% vCPU utilization> <55% active memory> Which option will achieve this result? ___
A. Create a virtual machine alarm with an action to run a script that starts a new instance of the web server.
B. Create a host cpu and memory alarm with an action to run a script that starts a new instance of the webserver.
C. Configure HA application monitoring for the web server and set it to trigger deployment of a new instance of the web server.
D. Configure Fault Tolerance on the virtual machine and leave the secondary machine disabled until needed.
【单选题】
An administrator has an application that requires connection directly to PCI devices through a virtual machine. What is a limitation of this configuration? ___
A. Devices must be reserved for PCI passthrough on at least one host on which the virtual machine will run.
B. Snapshots are not supported with DirectPath I/O passthrough devices.
C. A maximum of 18 PCI vSphere
D. irectPath devices can be added to a virtual machine.
推荐试题
【单选题】
项目团队决定取消某些高风险工作, 来降低整体项目风险水平。 这属于以下哪种风险应对策略? ( )
A. 减轻
B. 转移
C. 开拓
D. 规避
【单选题】
所有项目的风险管理都要经过下列所有过程, 除了 ( )。
A. 实施定性风险分析
B. 实施定量风险分析
C. 规划风险应对
D. 监督风险
【单选题】
组织要求尽快推出新产品以抢占市场份额, 并决定把你的项目定为战略优先级项目, 分配最好的专家为项目服务。 这是哪种风险应对策略?( )
A. 开拓
B. 提高
C. 转移
D. 接受
【单选题】
以下所有都会决定风险的排序, 除了 ( )。
A. 风险发生的概率
B. 风险发生的后果
C. 风险发生的紧急性
D. 风险承受力
【单选题】
某项目是高风险项目, 风险管理特别重要。 在分析项目风险时, 项目管理团队需要开展风险数据质量评估, 以便 ( )
A. 使定量风险分析所依据的数据更加可靠
B. 更好地进行风险应对规划
C. 使定性风险分析具有较高的可信度
D. 更有效地监督风险
【单选题】
以下哪个是实施风险应对过程的输入? ( )
A. 变更请求
B. 事业环境因素
C. 风险报告
D. 工作绩效报告
【单选题】
次生风险是 ( )。
A. 一个风险引起的另一个风险
B. 因应对一个风险而直接导致的另一个风险
C. 不太重要的风险
D. 非紧急发生的风险
【单选题】
某公司正在项目选择过程中, 有新建工厂和扩建现有工厂两个方案可供选择。 如果新建, 在市场需求强的情况下, 能盈利 10000 万美元; 在市场需求弱的情况下, 将亏损 4000 万美元。 如果扩建, 在需求强的情况下, 可盈利 8000 万美元; 在需求弱的情况下, 可盈利 2000 万美元。 经过分析, 发现 60%的可能性需求强, 40%的可能性需求弱。 正确的做法是 ( )
A. 选择新建, 因为预期货币价值为 4400 万美元
B. 选择扩建, 因为预期货币价值为 5600 万美元
C. 暂时不做决策, 因为不知道在需求中的情况下的概率和盈利
D. 综合考虑项目相关方的风险态度后, 再选择新建或扩建
【单选题】
下列哪一项是项目风险? ( )
A. 刚浇注的楼板出现了裂缝
B. 项目可能无法获得所需的设计工程师
C. 合同规定的时间已过, 供应商仍未供货
D. 项目所需的钢材涨价了 20%
【单选题】
项目经理邀请各主要相关方召开会议, 对风险的概率和影响进行了评估。 之后, 他又分析了假设条件的合理性和现实性, 并对风险数据的质量进行了评估。 在他进行风险管理的下一个过程之前, 他还必须 ( )
A. 识别风险的触发因素
B. 制订风险应对计划
C. 评估风险的发展趋势
D. 使用标准化的风险级别矩阵
【单选题】
风险管理的哪个过程, 需要开展成本效益分析? ( )
A. 实施定性风险分析
B. 实施定量风险分析
C. 规划风险应对
D. 实施风险应对
【单选题】
风险管理计划中通常包括下列哪项? ( )
A. 被指定的风险责任人
B. 风险管理方法论
C. 风险应对措施
D. 风险登记册
【单选题】
不能针对以下哪个要素做敏感性分析并绘制龙卷风图? ( )
A. 单个项目风险
B. 易变的项目活动
C. 具体的不明确性来源
D. 项目整体风险
【单选题】
以下哪个管理过程不使用核对单?( )
A. 识别风险
B. 规划风险应对
C. 控制质量
D. 制订项目管理计划
【单选题】
项目经理刚刚完成了一个项目, 正在实施的新项目与上一个项目非常相似, 他可以用哪个技术来较快识别项目的具体风险? ( )
A. 头脑风暴
B. 核对单
C. 根本原因分析
D. 提示清单
【单选题】
有关风险, 下列说法错误的是 ( )
A. 大多数风险都可以预测和管理
B. 应该主动管理所有风险
C. 风险总是和不确定性联系在一起
D. 风险一定会给项目目标的至少一个方面造成影响
【单选题】
项目发生了一个风险, 项目经理动用了应急储备, 这种风险可能是以下哪种风险?
A. 已知 - 已知风险
B. 已知 - 未知风险
C. 未知 - 未知风险
D. 次生风险
【单选题】
你决定找到优势互补的另一个合作伙伴, 组成联合体参与项目工作, 这种积极应对风险的策略是( )
A. 开拓
B. 提高
C. 分享
D. 转移
【单选题】
可供查询的概率和影响矩阵, 一般是由谁来设定的? ( )’
A. 项目经理
B. 执行组织
C. 客户
D. 项目重要相关方
【单选题】
哪个风险应对策略, 可同时用于威胁应对、 机会应对和整体项目风险应对? ( )
A. 规避
B. 上报
C. 接受
D. 分享
【单选题】
哪个是识别风险过程得到的风险登记册的内容? ( )
A. 潜在风险应对措施清单
B. 整体项目风险来源
C. 已识别单个项目风险的概述信息
D. 风险紧迫性信息
【单选题】
经过概率和影响评估, 那些目前发生概率比较低、 影响比较小的风险应该如何处理?( )
A. 从风险登记册中删掉
B. 暂时忽略不管
C. 保留在风险登记册中
D. 预留专门的应急储备
【单选题】
如果某个风险可以有多种应对方案, 而且需要综合考虑每种方案的多种特征, 以下哪个工具最能帮助项目经理进行优先级排序并确定首选方案? ( )
A. 成本效益分析
B. 备选方案分析
C. 多标准决策分析
D. 敏感性分析
【单选题】
发起人明确表明, 当项目成本超支 5%时必须采取相应措施, 如果成本超支 15%就会终止该项目。 以下哪个说法是正确的?( )
A. 项目成本的 5% 是风险临界值
B. 项目成本的 15% 是风险临界值
C. 项目成本的 15% 是风险偏好
D. 项目成本的 5% 是风险承受力
【单选题】
影响项目进度的风险因素众多, 项目经理想知道每个因素对进度影响的大小, 以便重点管理其中对项目进度影响最大的因素, 他应该使用以下哪种技术进行分析? ( )
A. 敏感性分析
B. 根本原因分析
C. 决策树分析
D. 过程分析
【单选题】
可以为应对风险制订弹回计划, 以便 ( )
A. 在主要应对措施不起作用时启用
B. 在严重威胁发生时启用
C. 以便用隐蔽手段把风险推给其他人
D. 接受不太严重的风险
【单选题】
要考察组织优势能抵消威胁的程度, 以及机会可以克服劣势的程度, 应该使用以下哪种分析技术? ( )
A. 根本原因分析
B. 文件分析
C. 假设条件和制约因素分析
D. SWOT 分析
【单选题】
风险识别活动需要哪些人参加? ( )
A. 项目团队成员
B. 风险管理专家
C. 项目经理和高级管理者
D. 全部项目相关方
【单选题】
在建立定量风险分析模型时, 如果某个风险的发生与任何计划活动都没有关系, 在模型中应该如何表示?( )
A. 用概率分布图表示
B. 用概率分支来表示
C. 不需要在模型中表示它
D. 用龙卷风图表示
【单选题】
关于风险转移, 下列说法正确的是 ( )。
A. 风险转移可以消除风险
B. 风险转移可以把风险推给后续的项目
C. 风险转移是把风险的影响连同应对责任一起转移给第三方
D. 风险转移不需要支付风险费用
【单选题】
进行蒙特卡洛模拟得到了项目成本的 S 曲线图。 其中会显示 ( )。
A. 项目成本的不确定性区间、 实现特定成本目标的概率
B. 对项目成本有最大影响的风险、 该风险的影响程度
C. 项目成本的不确定性区间、 项目进度的不确定性区间
D. 实现特定成本目标的概率、 实现特定进度目标的概率
【单选题】
对某一风险进行分析, 发现它位于概率和影响矩阵的低风险区域内, 下一步应该做什么?( )
A. 进行定性风险分析
B. 规划风险应对
C. 跟踪已识别风险
D. 规划风险管理
【单选题】
风险报告在以下哪个管理过程第一次被创建? ( )
A. 识别风险
B. 规划风险应对
C. 监督风险
D. 实施风险应对
【单选题】
项目团队正在使用战略分析框架 PESTLE ( 政治、 经济、 社会、 技术、 法律、 环境) 来识别整体项目风险的来源, 这是以下哪个工具技术的应用?( )
A. 核对单
B. 根本原因分析
C. 文件分析
D. 提示清单
【单选题】
以下关于固定总价合同的说法, 正确的是 ( )。
A. 价格完全固定, 不允许调整, 以便卖方承担工作范围变更的风险
B. 买方只需粗略定义所需采购的产品或服务
C. 买方承担因合同履行不好而导致的成本增加
D. 如果工作范围发生变化, 则可以调整合同价格
【单选题】
为获得最大的价格优势,公司统一购买各项目所需的办公用品,不允许各个项目部分别购买,这种采购方式被称为( )。
A. 分散式采购
B. 集中式采购
C. 竞争性采购
D. 独有来源采购
【单选题】
招标文件中应该包括 ( )。
A. 所需的合同条款
B. 初步估计的合同价
C. 详细的施工方法
D. 详细的进度计划
【单选题】
在采购管理中,项目经理的角色应该是 ()。 、
A. 采购管理的专家
B. 法律法规方面的专家
C. 管理整个采购过程的人
D. 代表组织签署协议的人
【单选题】
项目经理正在国外实施项目, 需要向当地的供应商购买服务。 如何确保合同在跨国采购中具备可执行性?( )
A. 在合同中约定清晰的争议解决方案
B. 在订立合同条款时考虑当地文化和法律的影响
C. 签订固定总价合同, 让风险最小
D. 在合同中详细规定关于提前终止的条款
【单选题】
组织采购部和法务部的人员将参与项目的采购工作, 有关他们在采购中的角色和职责的安排应该写入哪个文件中? ( )
A. 相关方登记册
B. 采购策略
C. 合同
D. 采购管理计划