【单选题】
Which statement is true regarding the licensing of vCenter Server? ___
A. The license for vCenter Server must be provided at the time of installation.
B. Changing the license assigned to vCenter Server requires a restart of the vCenter Server service.
C. Virtual machines can still be powered on if the vCenter Server license expires.
D. Licensing for a single vCenter Server installation is determined by the number of managed virtual machines.
查看试卷,进入试卷练习
微信扫一扫,开始刷题

答案
C
解析
暂无解析
相关试题
【单选题】
When configuring vSphere Replication for a virtual machine, what is the lowest Recovery Point Objective (RPO) that can be selected? ___
A. 1 min
B. 5 min
C. 10 min
D. 15min
【单选题】
A developer needs to create a multi-tier development stack for a home lab. Which vSphere product will support the architecture required for the least software cost? ___
A. vSphere Hypervisor
B. vSphere Essentials
C. VMware Player
D. VMware Workstation
【单选题】
An administrator is installing Windows into a virtual machine. The DVD has been mounted on the Host and configured for the virtual machine as shown in the Exhibit. Based on the exhibit, when the virtual machine is booted, why would it attempt to search for a PXE server? ___
A. The CD/DVD device is not connected.
B. The ISO is in the incorrect storage location.
C. The OS minimum requirements have not been met.
D. The CD/DVD device is not set to Client Device.
【单选题】
What component must be installed prior to deploying a vCenter Server in vSphere 6.x? ___
A. vCenter Identity Services
B. Platform Services Controller
C. vCenter Single Sign-On
D. Client Integration Plug-In
【单选题】
What is a valid plug-in status for a plug-in that has been added to a vSphere client? ___
A. Disabled
B. Unknown
C. Stopped
D. Installed
【单选题】
Users of an application are reporting performance issues. The following performance values are observed in the vSphere Web Client: <Host CPU utilization is 90%> <Virtual Machine memory utilization is consistently greater than 90% CPU Ready values are higher than 20%> What could be the cause of the application performance issue? ___
A. The host is lacking the CPU resources required to meet the demand.
B. The host is lacking the memory resources required to meet the demand.
C. The virtual machine is lacking the CPU resources required to meet the demand.
D. The virtual machine is lacking the memory resources required to meet the demand.
【单选题】
An administrator creates an ESXi cluster using vSphere Auto Deploy. The ESXi hosts are configured to get a management IP address from a DHCP server. The administrator needs to troubleshoot the management network on one of the hosts. Which DCUI option should the administrator use to renew the DHCP lease? ___
A. Restart Management Network
B. Restore Network Settings
C. Test Management Network
D. Configure Management Network
【单选题】
An administrator is re-provisioning an ESXi host and moving it to another datacenter. Which DCUI option should the administrator use to revert the system configuration to the default settings? ___
A. Reset System Configuration
B. Rebuild Default System Configuration
C. Revert System Configuration
D. Renew Default System Configuration
【单选题】
An administrator has just completed installing an ESXi 6.x host, but doesn't know what address has been configured. Where is the ESXi host IP address configured? ___
A. RVC console
B. Direct Console User Interface
C. vSphere Web Client
D. vSphere Client
【单选题】
When is it possible to place a VMFS5 datastore in maintenance mode? ___
A. When it is a member of a Storage DRS cluster
B. When it is a member of Virtual SAN cluster
C. When it is a member of a multi-extent datastore
D. When it is a member of a Virtual Volume
【单选题】
Immediately after installing ESXi, an administrator observes that the Configure Lockdown Mode option is grayed out in the Direct Console User Interface (DCUI). What is the most likely explanation? ___
A. The host has not yet been added to a vCenter Server.
B. The BIOS on the host does not have NX/XD enabled.
C. The ESXi host is running in evaluation mode.
D. The host requires a reboot before this feature is available.
【单选题】
Immediately after installing ESXi, an administrator observes that the Configure Lockdown Mode option is grayed out in the Direct Console User Interface (DCUI). What is the most likely explanation? ___
A. The host has not yet been added to a vCenter Server.
B. The BIOS on the host does not have NX/XD enabled.
C. The ESXi host is running in evaluation mode.
D. The host requires a reboot before this feature is available.
【单选题】
Which Single Sign-On deployment mode should an administrator use for two 6.x vCenter Servers configured with linked mode? ___
A. Basic Single Sign-On with vCenter Server Heartbeat
B. Multisite Single Sign-On
C. Basic Single Sign-On
D. Single Sign-On with Linked Mode
【单选题】
What is required when changing a virtual machine name using the vSphere Web Client? ___
A. Verify connectivity to the ESXi host where the virtual machine is running and its inventory list is accessible.
B. Verify in which datastore the virtual machine resides and that you have access and its inventory list is accessible.
C. Verify that virtual machine files are stored in the same datastore and can be accessed in the datastore browser list.
D. Verify the virtual machine is not running in Fault Tolerant mode and that it is not in a Distributed Resource Scheduler cluster.
【单选题】
An administrator deploys vRealize Operations into a vSphere 6.x environment. After the deployment, the administrator notices that badges are not appearing. What is a likely cause of this behavior? ___
A. Badges do not appear until you register vRealize Operations with vCenter Server.
B. Badges do not appear until you register a vCenter Server in vRealize Operations.
C. The vRealize Operations appliance needs to be redeployed.
D. The vCenter Server appliance needs to be redeployed.
【单选题】
How are ports scaled on vSphere Standard Switches (vSS)? ___
A. Ports on a vSS can be dynamically scaled up and down.
B. Ports on a vSS can only be statically scaled up or down.
C. Ports on a vSS can only be dynamically scaled down.
D. Ports on a vSS can only be dynamically scaled up.
【单选题】
A High Availability (HA) cluster is configured to respond to a given number of host failures. The cluster contains virtual machines configured with these settings: VM1 has a 1GHz CPU reservation and no Memory reservation VM2 has a 2GHz CPU reservation and no Memory reservation VM3 has no CPU reservation and no Memory reservation . Given this information, what is the correct slot size for the cluster? ___
A. The CPU Reservation should be set to 32MHz and the memory reservation should be set to 32MB plus memory overhead.
B. The CPU reservation should be set to 1 GHz and the memory reservation should be set to 0MB plus memory overhead.
C. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 0MB plus the virtual machine memory overhead.
D. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 32MB, plus the virtual machine memory overhead.
【单选题】
An administrator is planning a vSphere infrastructure with the following specific networking requirements: <The ability to shape inbound (RX) traffic> <Support for Private VLANs (PVLANs)> <Support for LLDP (Link Layer Discovery Protocol)>. What is the minimum vSphere Edition that will support these requirements? ___
A. vSphere Essentials Plus
B. vSphere Standard
C. vSphere Enterprise
D. vSphere
E. nterprise Plus
【单选题】
When you add an ESXi 6.x host to a new Cluster, which vSphere object owns the CPU and Memory resources of the hosts? ___
A. vCenter Server
B. Datacenter
C. Cluster
D. Host
【单选题】
A user is trying to retrieve objects from a SharePoint server and finds the request is taking an excessive amount of time. An administrator tries to isolate the issue and notes the following: Application performance is poor when compared to virtual machines on other hosts. Performance improves when the virtual machine is moved to another host. The virtual machine encounters higher than expected CPU %Ready times. What conclusion can be reached regarding the performance issues for this virtual machine? ___
A. Host Power Management is directly impacting virtual machine performance.
B. The virtual machine has a large number of snapshots.
C. The Path Selection Policy for the storage device is set differently on the affected host.
D. Network I/O control is configured for the portgroup.
【单选题】
A virtual machine template is accidently removed from the vCenter Server Inventory. Which method would be used to recover the template back into the environment?___
A. Use the datastore browser to locate the template, then right click and add the .vmtx file to inventory.
B. Use the datastore browser to locate the template, then right click and add the .vmx file to inventory.
C. Using the Managed Object Browser and adding the template from the ManagedObjectReference:GuestFileManager object.
D. Using the Managed Object Browser and adding the template from the ManagedObjectReference:VirtualDiskManager object.
【单选题】
A vSphere administrator needs to backup a virtual machine that has a Microsoft SQL Server Database installed. Which solution allows for an application quiesce to occur during backup?___
A. VMware vCenter Converter
B. VMware vCenter Site Recovery Manager
C. VMware vSphere Replication
D. VMware vSphere Data Protection Advanced
【单选题】
An administrator is migrating a virtual machine from a Test cluster to a Production cluster. The two environments do not have any shared storage. What is the easiest way to accomplish this task? ___
A. Perform a Storage vMotion.
B. Perform a regular vMotion.
C. Perform a Virtual to Virtual migration.
D. Perform a backup and restore using VMware Data Protection.
【单选题】
An administrator must determine an appropriate backup solution, given these conditions: 50 of the virtual machines are in a resource pool named Finance. 50 of the virtual machines are in a resource pool named QA. Which solution allows an administrator the ability to backup 100 virtual machines? ___
A. Use Snapshot Manager on the vCenter Server to backup the virtual machines.
B. Use the VMware Consolidated Backup (vcb) tool on the ESXi Host to backup the virtual machines.
C. Use the VMware Data Recovery (VDR) Appliance on the vCenter Server to backup the virtual machines.
D. Use the VMware Data Protection (VDP) Appliance on one of the
E. SXi Hosts to backup the virtual machines.
【单选题】
What is a benefit of using Enhanced vMotion Compatibility for an environment? ___
A. EVC masks CPU features to allow compatibility between hosts that are dissimilar.
B. EVC allows for cross platform vMotion to occur.
C. EVC enables Long
D. istance vMotion.
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
An administrator needs to verify that vMotion operations can be performed in a vSphere data center.What round trip time (RTT) latency is the maximum value that will allow vMotion operations to succeed? ___
A. 50ms RTT
B. 100ms RTT
C. 150ms RTT
D. 200ms RTT
【单选题】
A storage administrator has reported that full utilization of all bandwidth from an ESXi 6.x host is not being seen. In troubleshooting the issue, the Adapter details are shown in the Exhibit. Based on the exhibit, what is cause of the issue? ___
A. The array is not setup to use the correct multipathing policy.
B. There are no virtual machines on the ESXi host.
C. Not all links are used because a path is disabled.
D. Another path needs to be configured.
【单选题】
An administrator is migrating a powered-on virtual machine, as shown in the exhibit. Which option should be selected to perform a Storage vMotion of the VM? ___
A. Change storage only
B. Change VM compute resource only
C. Change both compute resource and storage, changing the compute resource first.
D. Change both compute resource and storage, changing the storage resource first.
【单选题】
An administrator is attempting to enable Storage I/O Control on a datastore, but it is failing. What is the likely reason for this failure? ___
A. The host is connected to a datastore is running on ESX 4.0.
B. The host is connected to a Fibre Channel storage array.
C. The datastore has multiple extents.
D. The datastore is managed by a single vCenter Server.
【单选题】
A mission-critical virtual machine built on vSphere 4.1 needs to be moved to an ESXi 6.x host.Which virtual hardware version is needed to move the virtual machine without upgrading? ___
A. 6
B. 7
C. 10
D. 11
【单选题】
An administrator is analyzing a virtual machine as shown in the Exhibit. What is the current long term risk for this virtual machine? ___
A. The virtual machine may run out of memory before April 27.
B. The virtual machine may continue to function after April 27.
C. The virtual machine has adequate memory configured for operation for the next 120 days.
D. The virtual machine has adequate memory reservation configured for operation for the next 120 days.
【单选题】
An administrator is monitoring a High Availability (HA) and Distributed Resource Scheduler (DRS) enabled cluster and has noticed that virtual machines in the cluster are being migrated without user intervention. Why is this happening? ___
A. The DRS Automation level is set to Fully Automated.
B. The Automation level is set to Automatic.
C. The
D. PM Threshold is set to Aggressive.
【单选题】
An administrator attempts to migrate a suspended virtual machine to a newly deployed vSphere 6.x cluster. The compatibility check fails. What condition could cause this behavior?___
A. The new vSphere 6.x cluster is running Intel CPUs instead of AMD CPUs.
B. A suspended virtual machine cannot be migrated.
C. The hardware virtualization feature of the CPU is not enabled on the new hosts.
D. A vSphere Distributed Switch is required to migrate a suspended virtual machine.
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
An administrator has just configured the IP address on an ESXi host from the Direct Console User Interface. How can the configuration be validated as correct without any additional tools?___
A. Add the host to vCenter Server and if it works, then all networking settings are ok.
B. Select the Test Management Network option from the DCUI.
C. Connect to the host with the vSphere Client and click the Test Network option.
D. Use PowerCLI to connect to the host and initiate a network test.
【单选题】
An administrator is installing vCenter Server for an environment that has 40 ESXi 6.x Hosts and 150 virtual machines. Which database would meet the minimal requirements needed for this task? ___
A. vFabric Postgres
B. Microsoft SQL Express 2008
C. Microsoft SQL Server 2014
D. Oracle 11g
【单选题】
What is a requirement when enabling a Virtual SAN cluster in an existing High Availability (HA) and Distributed Resource Scheduler (DRS) Cluster? ___
A. Disable DRS and HA before enabling Virtual SAN
B. Enable DRS before enabling Virtual SAN
C. Disable HA before enabling Virtual SAN
D. Enable Storage DRS before enabling Virtual SAN
推荐试题
【单选题】
项目经理要实现有效整合, 必须重点处理好哪几方面的关系? ( )
A. 项目内部的关系
B. 项目与所在组织、 行业的关系
C. 项目与项目管理职业、 其他职业之间的关系
D. 以上都是
【单选题】
以下行为有利于项目经理应用项目管理知识实现项目目标, 除了 ( )。
A. 了解自己和团队成员的专长
B. 努力让自己成为所有方面的专家
C. 依靠专家的知识有效开展工作
D. 找到具备专业知识的人员
【单选题】
为出色完成以下工作任务, 项目经理需要展示其战略和商务管理技能。 除了 ( )。
A. 向投资方解释启动项目的目的和将要实现的目标
B. 在与客户洽谈中展现组织的使命
C. 向高层说明项目对于组织战略的贡献
D. 展现自己的专业能力和个性魅力以赢得客户信任
【单选题】
按目前的状况, 你预计项目后期资源调配可能会遇到困难。 你知道某位领导可以帮助你渡过难关。 你应该 ( )。
A. 请他参加项目的每次会议
B. 试图与他建立良好的个人关系
C. 让团队成员定期向他发送工作绩效报告
D. 问题出现后再找他帮忙
【单选题】
针对团队成员的个性差异, 项目经理应该 ( )。
A. 重视与自己个性互补的团队成员
B. 重视不同的个性
C. 重视与自己个性相似的团队成员
D. 通过组织文化来统一团队成员的个性
【单选题】
大型项目的项目经理与大型管弦乐队的指挥相比较, 以下哪个说法是正确的? ( )
A. 乐队指挥领导同一个专业的人员, 项目经理领导不同专业的人员
B. 乐队指挥无须使用书面沟通技术, 项目经理必须使用书面沟通技术
C. 都要领导跨专业的团队, 都要对成果负责。
D. 乐队指挥必须使用形体沟通技术, 项目经理无须使用形体沟通技术
【单选题】
对项目经理的最佳定义是 ( )。
A. 负责管理项目的个人
B. 受组织委派实现项目目标的个人
C. 受组织委派, 亲自执行项目, 实现项目目标的个人
D. 受组织委派, 领导项目团队, 实现项目目标的个人
【单选题】
项目问题日趋复杂而且更具综合性, 而公司的招聘周期又太长, 导致项目常常不能快速获取所需的专家资源。 于是你提议公司加强与行业协会的联系, 以便必要时能调用协会专家库的各种资源为项目问题做综合诊断。 你这是正在执行哪个层面的整合? ( )
A. 过程层面
B. 背景层面
C. 认知层面
D. 项目层面
【单选题】
客户提出了需求变更,项目经理要求团队成员分析该变更可能对范围、 进度和预算等各方面的综合影响, 并确保按实施整体变更控制过程严格审批。项目经理正在执行哪个层面的整合工作?( )
A. 过程层面
B. 背景层面
C. 认知层面
D. 项目层面
【单选题】
采取以下行动, 可以帮助项目经理关注最重要的事, 除了 ()
A. 寻找适用于项目的优先级排序方法
B. 区分出项目的关键成功因素
C. 从大量信息中筛选最重要的信息
D. 确保项目范围有限
【单选题】
PMI 发布的人才三角中提出了战略和商业管理技能, 这项技能要求项目经理 ( )。
A. 关注项目的进度计划编制和执行
B. 能够激励和带领团队实现目标
C. 了解和应用项目所在行业的相关知识
D. 针对每个项目剪裁传统和敏捷的项目管理工具
【单选题】
项目经理必须学会把大量工作授权给团队成员去完成, 但有些工作不能授权出去。以下哪项工作是不能授权出去的?( )
A. 项目进度管理
B. 项目整合管理
C. 项目预算管理
D. 项目风险管理
【单选题】
人事部告知你, 你和另一名项目经理几乎同时提出了用人申请, 都打算在下周使用某位专家, 你应该 ( )
A. 让人事部帮忙协调
B. 询问这名专家的意愿
C. 试图与另一名项目经理见面
D. 要求人事部再招聘一名专家
【单选题】
项 目 整 合 管 理 是 指 ( )
A. 识别和选择项目的资源配置方案
B. 平衡相互竞争的项目目标, 如范围、 时间、 成本和质量
C. 协调项目管理各知识领域之间的相互影响
D. 以上都是
【单选题】
总结项目上的全部采购工作的经验教训, 并把经验教训写入最终的经验教训登记册。 这是哪个管理过程的活动? ( )
A. 控制采购
B. 结束项目或阶段
C. 结束采购
D. 监控项目工作
【单选题】
关于项目整合管理的责任描述, 正确的是 ( )。
A. 项目发起人对整合管理承担最终责任
B. 项目经理亲自执行项目工作并承担最终责任
C. 被授权的团队成员对整合管理承担最终责任
D. 项目经理必须亲自承担项目整合管理的最终责任
【单选题】
关于项目的知识管理, 下列说法正确的是 ( )。
A. 知识管理主要是将知识记录下来用于分享
B. 本项目生成的知识可用来支持组织运营或未来的项目
C. 知识管理主要是管理现有知识
D. 显性知识易于分享, 是知识管理的重点
【单选题】
拟派的项目经理拿到 2 年前完成的商业论证报告, 着手项目的启动工作, 他首先应该 ( )
A. 据此编写项目章程
B. 要求组织对他正式任命
C. 审查商业论证报告的内容和结论
D. 审查并修改商业论证报告
【单选题】
对于在完工前就提前终止的项目, 应该在哪个过程中调查和记录提前终止的原因?()
A. 结束项目或阶段
B. 指导与管理项目工作
C. 制订项目管理计划
D. 适用于项目所处阶段的具体过程
【单选题】
关于项目整合管理说法正确的是 ( )。
A. 整合管理只需要在项目内部开展
B. 整合管理可以确保项目管理各知识领域之间保持独立
C. 项目越复杂越需要全面的整合管理
D. 不太复杂的项目可以不需要整合管理
【单选题】
为了使项目收尾, 除了下述哪项外, 其余各项都需要具备? ( )
A. 与团队成员交流项目情况
B. 获得客户对项目成果的接受
C. 审核项目文档的完整性
D. 更新项目管理计划
【单选题】
以下哪项最准确地描述了开展项目变更控制的目的? ( }
A. 确保所有变更都经过审批, 确保只有经批准的变更才能纳人计划中
B. 确保所有变更都经过变更控制委员会的审批, 并在批准后纳人计划中
C. 确保把项目变更控制在最小的范围内
D. 确保只有最重要的相关方才能提出变更请求, 并参与对变更请求的审批工作
【单选题】
执行以下哪项会导致基准的变更?( )
A. 采取措施预防不利绩效偏差的出现
B. 采取措施使进度落后的某个工作包赶上进度计划
C. 对存在质量缺陷的某个工作包进行返工
D. 在工作分解结构中新增一个工作包
【单选题】
关于经验教训登记册的说法, 错误的是 ( )。
A. 管理项目知识过程可以得到经验教训登记册
B. 经验教训登记册的更新需要全员参与
C. 项目结束时, 经验教训登记册的内容会成为组织过程资产的一部分
D. 经验教训登记册里通常不包括与情况相关的行动方案
【单选题】
以下哪项是对配置管理活动的最佳描述? ( }
A. 识别配置项、 记录并报告配置状态、 配置项核实与审计
B. 分析配置项、 记录并报告配置状态、 配置项核实与审计
C. 配置项管理、 配置项控制、 配置项审计
D. 配置项识别、 配置项分析、 配置项管理
【单选题】
变更控制委员会 (CCB ) 是什么职能的组织? ( )
A. 由主要相关方的代表组成, 负责审批项目基准变更
B. 由主要相关方的代表组成, 负责审批所有变更
C. 由项目执行组织中的高级管理人员组成, 负责审批项目基准变更
D. 由项目经理领导的变更管理委员会