【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
AC
解析
暂无解析
相关试题
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
【多选题】
As part of a multisite Single Sign-On (SSO) deployment what two steps are required to ensure that a change to one Single Sign-On instance is propagated to the other instances? (Choose two.)___
A. Schedule a Replication Task on the primary instance
B. Select the first instance during the installation of subsequent instances
C. During the installation of each instance choose Linked-Mode
D. Enable Synchronize to Active Directory on each instance
【多选题】
You need to add an object to an existing vApp using the vSphere Web Client. How is this accomplished?___
A. Create an Object Inside the vApp.
B. Add an Object to a vApp.
C. Add an Object to the
D. atastore the vApp is located in.
【多选题】
Which three steps must be taken to use vSphere Update Manager 6.x to upgrade an ESXi 5.5 host to vSphere 6.x? (Choose three.)___
A. Download an ESXi Image.
B. Configure the vSphere Update Manager Download Service.
C. Create a baseline and attach it to the ESXi Host.
D. Scan the vCenter Content Library for the
E. SXi Image.
【多选题】
Which two options would allow a database administrator, with no access to the vSphere infrastructure, to connect to a virtual machine? (Choose two.)___
A. Use the Virtual Machine Remote Console (VMRC).
B. Use Remote Desktop Protocol (RDP) to connect.
C. Ask the vSphere administrator to grant permission to access the console through vCenter Server.
D. Ask the vSphere administrator to grant permission to access with the Horizon View Direct Connect Client.
【多选题】
Which three are architecture components of vRealize Operations? (Choose three.)___
A. Identity Server
B. Administrative Server
C. Analytics Server
D. Database Server
E. Connection Broker
【单选题】
金克拉金克拉撒旦蒂萨里大儿童家爱丽丝打开就撒开绿灯技术的()
A. 手动阀手动阀
B. 撒旦
C. 反对法
D. 第三方
【单选题】
金克拉金克拉撒退热贴开绿灯技术的()
A. 是否
B. 阿斯顿
C. 撒旦
D. 感到反感
【单选题】
而非热舞法国会开绿灯技术的()
A. 撒的
B. 热个股分化
C. 返回
D. 而我认为
推荐试题
【单选题】
经常有人工作的场所及施工车辆上宜配备急救箱,存放___,并应指定专人经常检查、补充或更换。
A. 防蚊虫药品
B. 医用绷带
C. 创可贴
D. 急救用品
【单选题】
装有SF6设备的配电站,应装设强力通风装置,风口应设置在___,其电源开关应装设在门外。
A. 室内中部
B. 室内顶部
C. 室内底部
D. 室内电缆通道
【单选题】
凡装有攀登装置的杆、塔,攀登装置上应设置___标示牌。
A. “止步,高压危险!”
B. “禁止攀登,高压危险!”
C. “从此上下!”
D. “有电危险!”
【单选题】
装设于地面的配电变压器应设有安全围栏,并悬挂___等标示牌。
A. “止步,高压危险!”
B. “禁止攀登,高压危险!”
C. “从此上下!”
D. “有电危险!”
【单选题】
检修作业,若需将栏杆拆除时,应装设___,并在检修作业结束时立即将栏杆装回。
A. 临时遮栏
B. 固定遮栏
C. 安全警示牌
D. 安全警示灯
【单选题】
非连续进行的故障修复工作,应使用___。
A. 故障紧急抢修单
B. 工作票
C. 施工作业票
D. 故障应急抢修单
【单选题】
禁止___停、送电。
A. 同时
B. 约时
C. 分时
D. 按时
【单选题】
接地线拆除后,___不得再登杆工作或在设备上工作。
A. 工作班成员
B. 任何人
C. 运行人员
D. 作业人员
【单选题】
工作完工后,应清扫整理现场,工作负责人(包括小组负责人)应检查___的状况。
A. 停电地段
B. 检修地段
C. 工作地段
D. 杆塔上
【单选题】
工作地段所有由工作班自行装设的接地线拆除后,工作负责人应及时向相关工作许可人(含配合停电线路、设备许可人)报告___。
A. 工作票结束
B. 工作票终结
C. 工作结束
D. 工作终结
【单选题】
工作许可人在接到所有工作负责人(包括用户)的终结报告,并确认所有工作已完毕,所有___已撤离,所有接地线已拆除,与记录簿核对无误并做好记录后,方可下令拆除各侧安全措施。
A. 工作许可人
B. 小组负责人
C. 工作票签发人
D. 工作人员
【单选题】
作业人员工作中正常活动范围与10kV高压线路、设备带电部分的安全距离为___米
A. 0.35
B. 0.6
C. 0.7
D. 1.0
【单选题】
任何运行中星形接线设备的中性点,应视为___设备。
A. 大电流接地
B. 不带电
C. 带电
D. 停电
【单选题】
停电线路、设备的断开点,应有能够反映线路、设备运行状态的电气和机械等指示。无明显断开点也无电气、机械等指示时,应断开___。
A. 同级电源
B. 下一级电源
C. 上一级电源
D. 断路器(开关)
【单选题】
对难以做到与电源完全断开的检修线路、设备,可___其与电源之间的电气连接。
A. 断开
B. 拆除
C. 隔离
D. 拉开
【单选题】
高压开关柜前后间隔没有可靠隔离的,工作时应___。
A. 同时停电
B. 加强监护
C. 装设围栏
D. 加装绝缘挡板
【单选题】
电气设备___在母线或引线上的,设备检修时应将母线或引线停电。
A. 直接连接
B. 间接连接
C. 可靠连接
D. 连接
【单选题】
室外低压配电线路和设备验电宜使用___。
A. 绝缘棒
B. 工频高压发生器
C. 声光验电器
D. 高压验电棒
【单选题】
高压验电前,验电器应先在有电设备上试验,确证验电器良好;无法在有电设备上试验时,可用___高压发生器等确证验电器良好。
A. 工频
B. 高频
C. 中频
D. 低频
【单选题】
雨雪天气室外设备宜采用间接验电;若直接验电,应使用___,并戴绝缘手套。
A. 声光验电器
B. 高压声光验电器
C. 雨雪型验电器
D. 高压验电棒
【单选题】
禁止作业人员越过___的线路对上层线路、远侧进行验电。
A. 未停电
B. 未经验电、接地
C. 未经验电
D. 未停电、接地
【单选题】
当验明确已无电压后,应立即将检修的高压配电线路和设备接地并___短路。
A. 单相
B. 两项
C. 三相
D. 中相和边相
【单选题】
配合停电的交叉跨越或邻近线路,在交叉跨越或邻近线路处附近应装设___接地线。
A. 一组
B. 两组
C. 相应
D. 三组
【单选题】
禁止作业人员擅自变更工作票中指定的接地线位置,若需变更,应由工作负责人征得___同意,并在工作票上注明变更情况。
A. 工作许可人或专责监护
B. 工作许可人或小组负责人
C. 工作票签发人或专责监护人
D. 工作票签发人或工作许可人
【单选题】
装设、拆除接地线均应使用___并戴绝缘手套,人体不得碰触接地线或未接地的导线。
A. 绝缘绳
B. 专用的绝缘绳
C. 绝缘棒
D. 软铜线
【单选题】
装设接地线应___,拆除接地线的顺序与此相反。
A. 先接母线侧、后接负荷侧
B. 先接负荷侧、后接母线侧
C. 先接导体端、后接接地端;
D. 先接接地端、后接导体端
【单选题】
电缆及电容器接地前应___充分放电。
A. 逐相
B. 保证一点
C. 单相
D. 三相
【单选题】
电缆及电容器接地前应逐相充分放电,星形接线电容器的中性点应接地,串联电容器及与整组电容器脱离的电容器应___。
A. 全部接地
B. 单只接地
C. 充分放电
D. 逐个充分放电
【单选题】
___及电容器接地前应逐相充分放电。
A. 避雷器
B. 电缆
C. 导线
D. 变压器
【单选题】
接地线截面积应满足装设地点短路电流的要求,且高压接地线的截面积不得小于___mm2。
A. 16
B. 25
C. 36
D. 20
【单选题】
成套接地线应由有___的多股软铜线和专用线夹组成。
A. 绝缘护套
B. 护套
C. 透明护套
D. 橡胶护套
【单选题】
低压接地线和个人保安线的截面积不得小于___mm2。
A. 12
B. 16
C. 25
D. 36
【单选题】
接地线应使用专用的线夹固定在导体上,禁止用___的方法接地或短路。
A. 压接
B. 缠绕
C. 固定
D. 熔接
【单选题】
杆塔无接地引下线时,可采用截面积大于190mm2(如φ16mm圆钢)、地下深度大于___m的临时接地体。
A. 0.6
B. 0.8
C. 1.0
D. 1.2
【单选题】
若由于设备原因,接地刀闸与检修设备之间连有断路器(开关),在接地刀闸和断路器(开关)合上后,应有保证断路器(开关)不会___的措施。
A. 拉闸
B. 损坏
C. 分闸
D. 合闸
【单选题】
在工作地点或检修的配电设备上悬挂___标示牌;
A. “在此工作!”
B. “从此进出!”
C. “禁止合闸,有人工作!”
D. “止步,高压危险!”
【单选题】
工作地点有可能误登、误碰的邻近带电设备,应根据设备运行环境悬挂___等标示牌。
A. “禁止攀登,高压危险!”
B. “在此工作!”
C. “止步,高压危险!”
D. “当心触电!”
【单选题】
配电设备检修,若无法保证安全距离或因工作特殊需要,可用与带电部分直接接触的___隔板代替临时遮栏。
A. 绝缘
B. 木质
C. 塑料
D. 泡沫
【单选题】
城区、___或交通道口和通行道路上施工时,工作场所周围应装设遮栏(围栏),并在相应部位装设警告标示牌。
A. 山区
B. 郊区
C. 有人区域
D. 人口密集区
【单选题】
单独巡视人员应经___批准并公布。
A. 公司领导
B. 工区领导
C. 工区
D. 安质部门