【单选题】
To prevent possible failures or issues during a vSphere upgrade, which component should be upgraded first?___
A. ESXi Hosts
B. virtual machines
C. datastores
D. vCenter Server
查看试卷,进入试卷练习
微信扫一扫,开始刷题

答案
D
解析
暂无解析
相关试题
【单选题】
What is the command for updating an ESXi host?___
A. esxcli software vib update –d /vmfs/volumes/Datastore/DirectoryName/PatchName.zip
B. esxupdate software update –d”/vmfs/volumes/Datastore/DirectoryName/PatchName.zip”
C. esxcli software update –d “/vmfs/volumes/Datastore/DirectoryName/PatchName.zip”
D. esxupdate software vib update –d /vmfs/volumes/Datastore/DirectoryName/PatchName.zip
【单选题】
A vSphere Administrator would like to identify which physical NUMA node their virtual machine is currently residing on. What esxtop metric would provide this information?___
A. GST_ND[x]
B. OVD_ND[x]
C. NRMEM
D. NHN
【单选题】
How can a vSphere administrator ensure that two virtual machines never run on the same datastore in a datastore cluster, while permitting the VMs to be load-balanced?___
A. Use an Intra-VM Anti-Affinity Rule.
B. Configure a storage DRS VM override.
C. Disable storage
D. RS for the VMs.
【单选题】
What is the VMware-recommended way to move a physical adapter out of Network I/O Control’s scope?___
A. Set the teaming policy to “Route Based on Physical NIC Load.”
B. Add the vmnic to the Net.NetNiocAllowOverCommit parameter in Advanced System Settings.
C. Add the vmnic to the Net.IOControlPnicOptOut parameter in Advanced System Settings.
D. Move the vmnic to a different vmUplink port on the Distributed Switch.
【单选题】
A VM folder contains VM1 and VM2. Group A has permission to power on virtual machines, defined on the VM folder and its children. Group B has permission to power off virtual machines, defined on the VM folder and its children. If a user is a member of Groups A and B, what will be the user’s effective permission on VM1 and VM2?___
A. Power on
B. Power off.
C. Power on and Power off.
D. Reset.
【单选题】
Group 1 is granted console interaction on a VM folder. User 1 is granted no console interaction on the same VM folder. What will be the outcome if User 1 tries to access the console of a virtual machine?___
A. User 1 will not be able to access the virtual machines in the VM folder.
B. User 1 will not have access to the virtual machine console.
C. User 1 will have access to the virtual machine console.
D. User 1 will have console access only via the vSphere Web Client.
【单选题】
Which statement is true regarding the use of VMFS3 datastores with vSphere 6.5?___
A. VMFS3 datastores can be used but not created.
B. VMFS3 datastores can be neither used nor created.
C. VMFS3 datastores will be present but unmounted.
D. VMFS3 datastores can be created and used.
【单选题】
In the Exhibit, each VM has a 1GHz non-expandable reservation. If all VMs are powered on in sequence, what would be the outcome?___
A. VM4 cannot be powered on.
B. VM5 cannot be powered on.
C. VM6 cannot be powered on.
D. VM3 cannot be powered on.
【单选题】
vSphere 6.5 introduced MAClearning capabilities for VMware’s virtual switches. What three benefits will it provide? (Choose three.)___
A. Reduced memory consumption.
B. Reduced consumption of extra CPU cycles.
C. Increased network throughput.
D. Prevent packet flooding inside the vSwitch.
【单选题】
What is the default pathing policy for most active-active arrays?___
A. Fixed
B. Most Recently Used
C. Dynamic
D. isk Morroring
【单选题】
Which command will show the iSCSI sessions on a ESXi 6.5 host?___
A. esxcli storage iscsi session get
B. esxcli iscsi session get
C. esxcli storage iscsi session
D. esxcli iscsi session list
【单选题】
Which of the following is not a parameter for traffic filtering or marking?___
A. virtual port ID
B. Protocol
C. Traffic Direction
D. DSCP value
E. Traffic redirection
【单选题】
A vSphere administrator wants to enable a virtual machine with Secure Boot, but in VM setting, Secure Boot option was not found under Boot Options. What could be the cause?___
A. The virtual hardware is not compatible.
B. The virtual machine has missing drivers.
C. The virtual machine OS does not support secure boot.
D. VMware Tools is not upgraded.
【单选题】
A virtual machine is connected on a distributed port group where the average bandwidth configured in the traffic shaping policy is 100 Mbps. The VM network adapter is configured with a reservation of 200 Mbps. What is the VM’s effective bandwidth?___
A. 200 Mbps
B. 100 Mbps
C. 150 Mbps
D. 400 Mbps
【多选题】
What are two reasons why a datastore in a Storage DRS cluster cannot enter maintenance mode?(Choose two.)___
A. Storage latency is too high to allow Storage DRS initiate Storage vMotion.
B. Storage DRS is configured for a VMFS3 datastore.
C. Storage
D. RS is disabled on the virtual disk.
【多选题】
What two methods are used to configure VMware vSphere Storage I/O Control shares and limits? (Choose two.)___
A. Assign shares and limits to VM virtual disks.
B. Assign shares and limits to datastores.
C. Assign shares and limits to Storage (DRS) clusters.
D. Assign shares and limits using VM storage policies.
【多选题】
ESXi 6.5 introduces VMFS6, which supports both 512e and 512n devices. What three configurations are supported when using these devices? (Choose three.) ___
A. Hosts with both 512e and 512n devices.
B. Storage vMotion between both 512e and 512n devices.
C. Datastore Extents spanned between both 512e and 512n devices.
D. Storage DRS clusters containing only both 512e and 512n devices.
【多选题】
A vSphere Administrator observes that the Primary VM configured with Fault Tolerance is executing slowly. After further investigation, it is determined that the Secondary VM is on an overcommitted ESXi host. What two methods will correct the problem? (Choose two.)___
A. Use Storage vMotion to migrate the Secondary VM to another datastore.
B. Use vMotion to migrate the Secondary VM to a different ESXi host.
C. Configure a CPU limit on the Primary VM which will also apply to the Secondary VM.
D. Turn off and turn on FT in order to recreate the Secondary VM on a different datastore.
【多选题】
Which two features require the use of Host Profiles? (Choose two.)___
A. Host Customizations
B. shared storage
C. Auto
D. eploy
【多选题】
What three processes on the vCenter Server Appliance (VCSA) does“vmware-watchdog monitor? (Choose three.) ___
A. vmware-eam
B. vmcad
C. vmware-vpostgres
D. vpxd
E. vsan-health
【多选题】
What three processes on the vCenter Server Appliance (VCSA) does“vmware-watchdog monitor? (Choose three.) ___
A. vmware-eam
B. vmcad
C. vmware-vpostgres
D. vpxd
E. vsan-health
【多选题】
Which two statements correctly describe VM-Host affinity rules? (Choose two.) ___
A. When there is more than one VM-Host affinity rule in a vSphere DRS cluster, the rules are applied equally.
B. After creating a VM-Host affinity rule, its ability to function in relation to other rules is predetermined.
C. When there is more than one VM-Host affinity rule in a vSphere
D. RS cluster, the rules will be ranked.
【多选题】
An administrator wants to enable proactive HA by moving virtual machines automatically if a hardware alert is triggered. What are the three required settings? (Choose three.)___
A. Set vSphere DRS Automation to Partially Automated.
B. Turn on Proactive HA.
C. Set the Proactive HA Automation Level to Manual.
D. Set the Proactive HA Automation Level to Automated.
E. Turn on vSphere HA and vSphere DRS.
【多选题】
If vCenter Server 5.5 installation has one or more services deployed remotely, which three services are relocated to vCenter Server 6.5 on upgrade? (Choose three.)___
A. vCenter Inventory Services
B. vSphere Authentication Proxy
C. vSphere Web Client
D. vSphere
E. SXi Dump Collector
【多选题】
What two debugging levels can a virtual machine be configured to? (Choose two.)___
A. Verbose
B. Debugging
C. Statistics
D. Trivia
【多选题】
What are three benefits of using a few large-capacity LUNs instead of many small-capacity LUNs? (Choose three.) ___
A. Better performance because there is less contention for a single volume.
B. More flexibility for resizing virtual disks.
C. Less wasted storage space.
D. More flexibility to create virtual machines without adding new LUNs.
E. Fewer VMFS datastores to manage.
【多选题】
Which two configurable options are available in Boot Options for a virtual machine? (Choose two.)___
A. Tools Upgrades
B. Encryption
C. Firmware
D. Force BIOS setup
【多选题】
Which three VMware-recommended best practices should an administrator follow before upgrading to vSphere 6.5? (Choose three.)___
A. Disconnect ESXi host from vCenter.
B. VMware Tools are installed in the virtual machine.
C. Ensure that the system hardware complies with ESXi requirements.
D. Back up the host.
E. Check the interoperability of any other software integrated with vSphere.
【多选题】
What are two requirements to enable EVC in vSphere DRS cluster? (Choose two.)___
A. CPUs must be from the same vendor.
B. EVC must use the lowest possible baseline supported by the hardware.
C. CPUs must be in the same family and of the same speed.
D. No VMs may be running in the cluster.
【多选题】
What three conditions could result in VMware Flash Read Cache being unable to claim a disk? (Choose three.)___
A. The disk is not listed in the VMware hardware compatibility guide.
B. The disk is not detected as an SSD.
C. The disk is not detected as local.
D. The disk is in use by VMFs.
【多选题】
Boot from SAN is supported on which three storage technologies? (Choose three.)___
A. VMware vSAN
B. FCoE
C. NFS 4.1
D. iSCSI
E. FC
【多选题】
Which two components are part of storage I/O multipathing on ESXi? (Choose two.)___
A. SATP
B. VASA
C. PSP
D. VAAI
【多选题】
Which two statements are true about Highly Available vSphere Auto Deploy infrastructure? (Choose two.)___
A. It helps prevent data loss.
B. It is a prerequisite for using vSphere Auto Deploy with stateful install.
C. It requires two or more Auto
D. eploy servers.
【多选题】
The virtual machine log rotation size can be changed for all VMs by which two interfaces? (Choose two.)___
A. PowerCLI
B. vSphere Web Client
C. ESXi host client
D. esxcli
【多选题】
Which two configuration options can exclude virtual disks from snapshot operations? (Choose two.)___
A. Use RDM in virtual mode for virtual disk.
B. Use virtual disks in Independent – Persistent mode.
C. Use a virtual disk larger than 2 TB in size.
D. Use RDM in physical mode for virtual disk.
【多选题】
Which two storage configurations on the source server are unsupported with VMware Converter? (Choose two.)___
A. Linux LVM
B. software RAID
C. GPT/MBR hybrid disks
D. Windows basic volumes
E. Windows dynamic volumes
【多选题】
Which two statements about vCenter HA are correct? (Choose two.)___
A. ESXi 5.5 or later is required.
B. vCenter HA network latency between nodes must be less than 50 ms.
C. NFS datastore is supported.
D. It must be deployed on a 3
E. SXi host cluster with DRS enabled.
【多选题】
An attempt to delete NFS datastore from a ESXi host returns the error: Sysinfo error on operation returned the following status:< Busy> Which two statements could explain this failure? (Choose two.)___
A. NFS datastore is a part of Storage DRS Cluster.
B. NFS.VolumeRemountFrequency value is set to 30.
C. Storage I/O Control is enabled on NFS datastore.
D. NFS datastore has running or registered virtual machines.
【多选题】
An administrator finds that the Microsoft Exchange virtual machines are exhibiting network latency. What two in-guest changes can help decrease latency? (Choose two.)___
A. LRO
B. TSO
C. SR-IOV
D. PVRDMA
【多选题】
Which two types of iSCSI adapters require VMkernel networking configuration? (Choose two.)___
A. dependent hardware
B. in-guest
C. software
D. independent hardware
推荐试题
【判断题】
根据《公路工程建设项目概算预算编制办法》(JTG3830-2018)规定,概算、预算项目应按项目表的序列及内容编制。当实际出现的工程和费用项目与项目表的内容不完全相符时,第一、二、三、四、五部分和“项”的序号、内 容应保留不变,项目表中的“项”以下的分项在引用时应保持序号、内容不变,缺少的分项内容可随需要就近增加,并按项目表的顺序以实际出现的级别依次排列,不保留缺少的“项”以下的项目序号。
A. 对
B. 错
【判断题】
根据《公路工程建设项目概算预算编制办法》(JTG3830-2018)规定,建筑安装工程费包括直接费、其他直接费、设备购置费、企业管理费、规费、 利润、税金和专项费用。
A. 对
B. 错
【判断题】
根据《公路工程建设项目概算预算编制办法》(JTG3830-2018)规定,概算、预算的材料与设备、施工机械台班单价及各项费用的计算均应通过 规定的统一表格表述,表格样式应符合本办法附录 A 的规定。
A. 对
B. 错
【判断题】
根据《公路工程建设项目概算预算编制办法》(JTG3830-2018)规定,商品水泥混凝土、沥青混合料和各类稳定土混合料采购及保管费率为0.42%,外购的构件、成品及半成品不计采购及保管费费。
A. 对
B. 错
【判断题】
根据《公路工程建设项目概算预算编制办法》(JTG3830-2018)规定,购买的路基填料、绿化苗木、商品水泥混凝土、商品沥青混合料和各类稳定土混合料、外购混凝土构件不作为措施费及企业管理费的计算基数。
A. 对
B. 错
【判断题】
根据《公路工程建设项目概算预算编制办法》(JTG3830-2018)规定,设备安装工程及金属标志牌、防撞钢护栏、防眩板(网)、隔离栅、防护网等要计夜间施工增加费。
A. 对
B. 错
【判断题】
根据《公路工程建设项目概算预算编制办法》(JTG3830-2018)规定,新建工程、中断交通进行封闭施工或为保证交通正常通行而修建保通便道改的扩建工程,不计行车干扰施工增加费。
A. 对
B. 错
【判断题】
根据《公路工程建设项目概算预算编制办法》(JTG3830-2018)规定,施工辅助费以各类工程的定额人工费和定额施工机械使用费之和为基数,按规定费率计算。
A. 对
B. 错
【判断题】
根据《公路工程建设项目概算预算编制办法》(JTG3830-2018)规定,运杂费系指材料自供应地点至工地的费用,包括装卸费、运费,如果发生,还应计囤存费及其他杂费(如过磅、标签、支撑加固、路桥通行等费用)。
A. 对
B. 错
【判断题】
根据《公路工程建设项目概算预算编制办法》(JTG3830-2018)规定,税金指国家税法规定应计入建筑安装工程造价的增值税销项税额。 税金=(直接费+设备购置费+措施费+企业管理费+规费+利润)×10%
A. 对
B. 错
【判断题】
根据《公路工程建设项目概算预算编制办法》(JTG3830-2018)规定,耕地开垦费指公路建设项目占用耕地的,应由建设项目法人(业主)负责补充耕地所发生的费用;没有条件开垦或者开垦的耕地不符合要求的,按规定缴纳的耕地开垦费。
A. 对
B. 错
【判断题】
根据《公路工程建设项目概算预算编制办法》(JTG3830-2018)规定,土地使用及拆迁补偿费当与原有的电力电信设施、管线、水利工程、铁路及铁路设施互相干扰时,只能与有关部门联系,商定合理的解决方案和补偿金额。
A. 对
B. 错
【判断题】
根据《公路工程建设项目概算预算编制办法》(JTG3830-2018)规定,竣(交)工验收试验检测费指在公路建设项目竣(交)工验收前,由建设单 位(业主)或工程质量监督机构委托有资质的公路工程质量检测单位按照有关规定对 建设项目的工程质量进行检测并出具检测试验意见,以及进行桥梁动(静)载试验或 其它特殊检测等所需的费用。
A. 对
B. 错
【判断题】
根据《公路工程建设项目概算预算编制办法》(JTG3830-2018)规定,联合试运转费用包括联合试运转期间所需的材料、燃料和动力的消耗,机械和检测设备使用费,工具用具和低值易耗品费,不含参加联合试运转的人员工资及其他费用等。
A. 对
B. 错
【判断题】
根据《公路工程建设项目概算预算编制办法》(JTG3830-2018)规定,生产准备费中工器具购置费指建设项目交付使用后为满足初期正常运营必须购置的第一套不构成固定资产的设备、仪器、仪表、工卡模具、器具、工作台(框、架、柜)等的费用,不包括构成固定资产的设备、工器具和备品、备件,及已列入设备费中的专用工具和备品、备件
A. 对
B. 错
【判断题】
根据《公路工程建设项目概算预算编制办法》(JTG3830-2018)规定,价差预备费以建筑安装工程费用及设备购置费总额为基数,按设计文件编制年始至建设项目工程交工年终的年数和年工程造价增涨率计算
A. 对
B. 错
【判断题】
《关于铁路建设项目实施阶段材料价差调整的指导意见》规定,铁路建设项目无风险包干费的,概算中材料价格变化幅度(以批准编制期概算为准)在±3%以内部分由施工企业承担,超出部分纳入概算并由建设单位承担。
A. 对
B. 错
【判断题】
《关于进一步规范铁路建设项目征地拆迁验工计价工作的补充通知》要求,建设单位与设计单位、监理单位、地方政府有关部门、被征地拆迁人等五方对征地拆迁数量的确认资料为最终验工计价依据。
A. 对
B. 错
【判断题】
《关于铁路建设项目实施阶段材料价差调整的指导意见》规定,铁路工程项目甲供材料或自购料只调整铁总经规院每季度公布的材料价格信息上的材料,未在信息价上公布的材料不予调整。
A. 对
B. 错
【判断题】
依据《铁路征地拆迁及费用管理的指导意见》的规定,铁路工程项目三电迁改一般处理原则是按照合同约定和总公司规定,此类费用在经过第三方审价的情况下,据实进行调整。
A. 对
B. 错
【判断题】
《关于规范铁路营业线施工配合技术服务费计取工作的指导意见》规定,营业线施工配合技术服务费是指铁路营业线、邻近营业线及其他影响铁路营业线设备使用和行车安全施工时,铁路运营单位按照铁路营业线施工安全管理相关规定开展配合技术服务工作所需各工种人员的工作补贴、交通和误餐补助、管理费等。
A. 对
B. 错
【判断题】
“三电”管线迁改工等工程(含征地拆迁协助工作)在初步设计批复后即可招标,中标迁改单位应尽快完成“三电”管线迁改并协助建设单位以及地方政府做好征地拆迁相关工作。
A. 对
B. 错
【判断题】
根据《铁路基本建设项目投资管理办法》的规定,总公司按照初步设计批复的建设规模、标准、工程措施和总概算对建设单位进行投资控制,批准(调整)总概算额度是建设单位组织实施的最大限额。
A. 对
B. 错
【判断题】
根据《铁路基本建设项目投资管理办法》的规定,铁路项目实施中,由地方政府提出增加站房规模,增加等级(城市)道路跨线设施等要求,变更已批复工程措施的,由建设单位与地方政府协商、落实出资后报总公司,经总公司同意后,建设单位按规定履行变更设计手续。
A. 对
B. 错