【判断题】
固定式装配适用于单件和小批量模具的装配,以及装配精度要求较高,需要调整的部位较多的装配
A. 对
B. 错
查看试卷,进入试卷练习
微信扫一扫,开始刷题

答案
A
解析
暂无解析
相关试题
【单选题】
What happens to the status of users already logged into ESXi Shell when a vSphere administrator enables lockdown mode?___
A. Users remain logged in and can run commands, except to disable lockdown mode.
B. Users remain logged in and can run commands, including disabling lockdown mode.
C. Users are immediately logged out of ESXi Shell.
D. Users are logged out after a timeout specified by the vSphere administrator.
【单选题】
What is the effective vSphere licensing level during the 60 day evaluation period?___
A. vSphere Foundation Essentials Plus
B. vSphere Standard
C. vSphere Enterprise
D. vSphere
E. nterprise Plus
【单选题】
To comply with security requirements, an administrator with a vCenter Server Appliance needs to force logoff of the vSphere web client after 10 minutes of inactivity.What should the administrator do to meet the requirement?___
A. Edit: /var/lib/vmware/vsphere-client/webclient.properties, modify session.timeout=10
B. Edit: /opt/vmware/vsphere-client/webclient.properties, modify session.timeout=600
C. Edit: /var/lib/vmware/vsphere-client/webclient.properties modify session.timeout=600
D. Edit: /opt/vmware/vsphere-client/webclient.properties, modify session.timeout=10
【单选题】
An administrator enables High Availability (HA) on a Virtual SAN cluster.Which network is used for HA Network Heatbeat configuration?___
A. The Management network.
B. The vMotion network.
C. The Virtual SAN network.
D. The Provisioning Traffic network.
【单选题】
A user wants to monitor a business-critical virtual machine to ensure that it doesn't run out of resources. What metric could be monitored in vRealize Operations to address this concern?___
A. Time Remaining badge
B. Compliance badge
C. Reclaimable Waste badge
D. Density badge
【单选题】
An administrator has recently installed a new ESXi 6.x Host, and during the configuration notices sporadic network problems. To check whether the issue occurred sometime during the configuration, the administrator would like to reset the system.How can this be accomplished in the shortest amount of time?___
A. Run the ESXi installer again and reinstall the host.
B. Select the Reset System Configuration option from the vSphere Client when connected directly to the host.
C. From the
D. irect Console User Interface, select Reset System Configuration.
【单选题】
A vApp is running out of compute resources when overall activity is high within the resource pool. At other times, everything is fine.What should be done to resolve this issue?___
A. Increase the size of the resource pool Shares.
B. Set the vApp's CPU and Memory Reservation Type to Expandable.
C. Set the vApp's CPU and Memory Limit to Unlimited.
D. Create a new resource pool with the existing hardware configuration.
【单选题】
A virtual machine has been renamed and an administrator is unable to find files with the new virtual machine name in the datastore.What is the reason for this?___
A. The names of the files on the datastore do not change.
B. The names of the files on the datastore have been corrupted.
C. The virtual machine needs to be re-added to the inventory.
D. The Distributed Resource Scheduler moved the virtual machine to another host.
【单选题】
An administrator has configured network connectivity for a new virtual machine, as shown in the Exhibit.What will occur with the network traffic of this virtual machine when communicating externally from vSwitch1?___
A. The virtual machine will communicate on both uplinks
B. The virtual machine will only communicate on vmnic1
C. The virtual machine will only communicate on vmnic2
D. The virtual machine will fail to communicate externally
【单选题】
An administrator is unable to create the first group in a new vRealize Operations environment. What is the likely cause of the problem?___
A. There are no group types defined.
B. The group is not defined in SSO.
C. There are more than 32 group types defined.
D. The description for the group is not provided.
【单选题】
A new vApp was built and tested in the corporate headquarters datacenter running vSphere 6.x. What condition would explain why the virtual machine is failing to boot in an offsite datacenter running on vSphere 5.5?___
A. The virtual machine was built with the default hardware version.
B. The VMFS 5 datastore is not compatible with virtual machines configured with vSphere 6.x.
C. a
D. RS 5.5 cluster cannot run virtual machines configured with vSphere 6.x.
【单选题】
An administrator is evaluating whether to deploy vCenter Server on a Windows server or on a vCenter Server appliance. The administrator has the following requirements: <A web browser will be utilized to manage the vSphere environment.> <16 ESXi hosts will be deployed.> <Licenses must be shared with a vCenter Server at another site.> <An external Oracle 10g database server will be used to host the vCenter Server database.> Why will the administrator need to deploy vCenter Server on a Windows server?___
A. Linked Mode is a requirement for the solution.
B. Oracle 10g is a requirement for the solution.
C. The vSphere web client is a requirement for the solution.
D. Management of more than 5 hosts is a requirement for the solution.
【单选题】
What is a benefit of using VMware Data Protection ?___
A. Provides support for guest-level backups and restores of Microsoft SQL Servers, Exchange Servers, and Share Point Servers.
B. Provides support for advanced storage services including replication, encryption, deduplication, and compression.
C. Provides direct access to VDP configuration integrated into the vSphere Client.
D. Reduces disk space consumed by virtual machine data using deduplication.
【单选题】
An administrator enables vSphere High Availability (HA) on an existing cluster with a large number of hosts and virtual machines. The administrator notices that the setup of vSphere HA on some of the hosts is failing. What step, if taken, might resolve this issue?___
A. Increase the value of the config.vpxd.das.electionWaitTimeSec setting.
B. Set the value of vpxd.das.aamMemoryLimit to 256.
C. Set the value of the das.useDefaultIsolationAddress setting to False.
D. Increase the value of the das.iostatsinterval setting.
【单选题】
An ESXi 6.x host consists of 24 logical cores. Hyperthreading is enabled on the host. What is the maximum number of vCPUs that can be assigned to a virtual machine on this host?___
A. 24
B. 48
C. 64
D. 128
【单选题】
By default, each ESXi 6.x host is provisioned with a certificate from which root certificate authority?___
A. RedHat Certificate Authority
B. VMware Certificate Authority
C. DigiCert Certificate Authority
D. Verisign Certificate Authority
【单选题】
An administrator is adding an NFS datastore as shown in the Exhibit. What is the purpose of the Servers to be added list?___
A. It contains the IP addresses of the NFS Storage Server to provide multipathing capability.
B. It contains the IP addresses of the ESXi hosts that mount the datastore.
C. It contains the IP addresses used for
D. ynamic Discovery of targets.
【单选题】
An administrator reports that the System Event log data is only available for 24 hours when reviewing the Hardware Status tab. Which condition could be responsible for the loss of data?___
A. A Reset event log was executed.
B. The statistical collection level was set to a value of 1.
C. The boot disk of the host is corrupt.
D. Syslog has been configured at the vCenter Server level.
【单选题】
During an upgrade, the ESXi 6.x installer finds an existing version of ESXi and a VMFS3 volume. No virtual machines exist on the host or VMFS3 volume. The requirement is to upgrade to VMFS5. Which option should be chosen to meet this requirement?___
A. Upgrade ESXi and preserve the VMFS datastore
B. Install ESXi and preserve the VMFS datastore
C. Install ESXi and overwrite the VMFS datastore
D. Upgrade
E. SXi and overwrite the VMFS datastore
【单选题】
A vSphere 6.x Standard Switch is configured with 4 virtual machine portgroups, as shown in the exhibit. Which portgroup would be utilized by default when creating a new virtual machine?___
A. Access Network
B. DMZ Network
C. VM Network
D. Virtual Machine Network
【单选题】
Which vSphere 6.x feature will allow an organization to utilize native snapshots?___
A. Virtual Volumes
B. Virtual SAN
C. VMFS3
D. VMFS5
【单选题】
An administrator is creating a new vSphere Distributed Switch that will be utilized with a specific vSphere Cluster. The cluster itself contains a mix of ESXi 5.x and 6.x Hosts. Which Distributed Switch version should be created to support this configuration?___
A. Distributed Switch: 6.0.0
B. Distributed Switch: 5.0.0
C. Distributed Switch: 5.1.0
D. Distributed Switch: 5.5.0
【单选题】
Which load balancing policy, previously limited to vSphere Distributed Switches, is now available on vSphere Standard Switches with vSphere 6.x?___
A. Route based on physical NIC workload
B. Route based on IP Hash
C. Route based on the originating virtual port
D. Route based on Source MAC Hash
【单选题】
A storage administrator is not seeing full utilization of all bandwidth from an ESXi host. The vSphere administrator observes the adapter details, as shown in the Exhibit. What is the probable cause of this issue?___
A. Another path needs to be used to allow full utilization of the bandwidth.
B. The array is not setup to use the correct multipathing policy.
C. There are no virtual machines on the host.
D. No traffic is being sent across it because a path failed.
【单选题】
A storage administrator is not seeing full utilization of all bandwidth from an ESXi host. The vSphere administrator observes the adapter details, as shown in the Exhibit. What is the probable cause of this issue?___
A. Another path needs to be used to allow full utilization of the bandwidth.
B. The array is not setup to use the correct multipathing policy.
C. There are no virtual machines on the host.
D. No traffic is being sent across it because a path failed.
【单选题】
An administrator has just completed performing an interactive installation of ESXi 6.x and is booting the host. How is the network initially configured?___
A. The network is configured by Automatic Private IP Addressing (APIPA).
B. The network is configured based on the settings detected in DNS.
C. The network is configured with the address as specified in the installer.
D. The network is automatically configured by DHCP.
【单选题】
You have just installed an ESXi 6.x Host. As part of your company security regulations, a security banner must be presented on the console of the host. How can this action be accomplished?___
A. Configure the Advanced Settings > Annotations screen of the ESXi host.
B. This is configured from the Direct Console User Interface configuration menu.
C. It is not possible to configure a security banner for the ESXi host.
D. From vCenter Server, this setting is configured globally in the vCenter Server configuration.
【单选题】
An administrator is only able to see the Health Badge when using the vRealize Operations user interface. What is the likely cause of this behavior?___
A. The vRealize Operations Foundation License is in use.
B. The vmware-sps service failed to start.
C. The vRealize Operations Standard License is in use.
D. The vmware-rbd-watchdog service failed to start.
【单选题】
An administrator has configured an alarm to be notified when a virtual machine meets either of these conditions: <High virtual CPU> <High active memory consumption.> <The alarm is only triggering when both of the conditions are met.> What can be done to correct the alarm behavior?___
A. Edit the alarm and select Trigger if ANY of the following conditions are satisfied.
B. Edit the alarm and select Trigger if ALL of the following conditions are satisfied.
C. Create two separate alarms, one for CPU and one for memory and link them together with ESXCLI.
D. Delete the existing alarm and create a new event based alarm.
【单选题】
An administrator creates an ESXi cluster using vSphere Auto Deploy. The ESXi hosts are configured to get a management IP address from a DHCP server. The administrator needs to troubleshoot the management network on one of the hosts. Which DCUI option should the administrator use to renew the DHCP lease? ___
A. Restart Management Network
B. Restore Network Settings
C. Test Management Network
D. Configure Management Network
【单选题】
An administrator is attempting to restore a number of files in a directory within the Operating System of a virtual machine. How can the administrator restore the files from a previous backup? ___
A. Use the File Level Restore option from the selected backup of the virtual machine in the vSphere Web Client.
B. Connect to the File Level Restore tool from a web browser in the virtual machine.
C. Connect to the File Level Restore tool from the VMware
D. ata Protection appliance.
【单选题】
After selecting an object in vRealize Operations, how can a user compare the badge values of related child objects? ___
A. Use the Scoreboard tab
B. Use the Relationship tab
C. Use the Members tab
D. Use the Overview tab
【单选题】
You want to deploy a vApp and dynamically assign IP addresses without a DHCP server on the network. Which action would you take to accomplish this task? ___
A. Enable IP pools.
B. Configure a local DHCP server in the vApp.
C. Enable NAT on the vApp router.
D. Configure the guest OS for workgroup and WINS.
【单选题】
What is the optimal configuration when building a virtual machine for a single-threaded Windows application? ___
A. Deploy single-threaded applications on uniprocessor virtual machines.
B. Deploy single-threaded applications on symmetric multi-processor virtual machines.
C. Tune single-threaded applications to take advantage of symmetric multi-processor resources.
D. Tune Single-threaded applications at the hypervisor level.
【单选题】
An administrator has created the resource pool configuration shown in the Exhibit. Based on the exhibit, which virtual machine(s) can be successfully powered on? ___
A. VM-M1 only
B. VM-K1 only
C. VM-K1 and VM-K2 only
D. VM-K1, VM-K2, and VM-M1
【单选题】
Which vSphere 6 Enterprise Edition feature will allow an organization to ensure that critical multi-threaded applications have the maximum possible uptime? ___
A. Fault Tolerance
B. High Availability
C. Distributed Resource Scheduler
D. App HA
【单选题】
An administrator has a virtual machine that requires four times the compute resources than other virtual machines on the same ESXi 6.x host. How should the administrator configure the virtual machine settings, in order to be prepared for any resource contention? ___
A. Set the shares of the priority virtual machine to High and the rest to Low.
B. Set the shares of the priority virtual machine to High.
C. Set the shares of the priority virtual machine to High and the rest to Normal.
D. Set the shares of the priority virtual machine to Normal and the rest to Low.
推荐试题
【判断题】
根据《中国中铁工程项目成本管理指导意见》(中铁股份成本(2018)211号)所述,成本管理体系及职责中,三级公司是项目成本管理的执行层,负责执行二级公司成本管理制度办法、建立成本管理体系、抓好成本管理日常推进与总结提高、负责所属各项目部责任成本预算的编制下达、后台管控,负责组织和落实项目部期中、期末考核兑现。
A. 对
B. 错
【判断题】
根据《中铁四局作业层队伍管理办法》(中铁四程(2016)877号)所述,竞争性谈判是指具备合格条件的潜在投标人不足3家,或特殊紧急的抢险救援任务,或单项合同额在200万元以下的,可以采用竞争性谈判方式选择作业层队伍。
A. 对
B. 错
【判断题】
根据《中铁四局作业层队伍管理办法》(中铁四程(2016)877号)所述,邀请招标是指向2家以上具备承担招标项目施工能力、资信良好的特定作业层队伍发出投标邀请,进行招标的活动。
A. 对
B. 错
【判断题】
根据《中国中铁股份有限公司工程施工劳务(专业)分包管理指导意见》(中铁股份成本(2016)162号),专业分包是指施工总承包企业将其所承包工程中的专业工程发包给具有相应资质的施工总承包企业完成的活动。
A. 对
B. 错
【判断题】
根据《中国中铁股份有限公司工程施工劳务(专业)分包管理指导意见》(中铁股份成本(2016)162号),劳务分包是指施工总承包企业或者专业承包企业将其承包工程中的劳务作业发包给具有相应资质的劳务企业完成的活动
A. 对
B. 错
【判断题】
根据《中国中铁股份有限公司工程施工劳务(专业)分包管理指导意见》(中铁股份成本(2016)162号),劳务(专业)分包必须符合国家、行业对工程分包现行法律、法规的要求,虽禁止转包、违法分包,但可以挂靠。
A. 对
B. 错
【判断题】
根据《中铁四局集团有限公司PPP投资项目会计核算指引》(中铁四财(2017)806号),经营性PPP项目对应的付费机制为“使用者付费”,特征是使用者购买公共产品数量、公共服务质量可以量化,受益对象明确、交易价格事先约定,交易结算便利等。
A. 对
B. 错
【判断题】
依据《中铁四局集团有限公司PPP项目投资尽职调查管理办法》(中铁四法(2017)812号),PPP项目投资尽职调查是局属投资开发公司在局法律合规部的统筹管理下成立尽职调查小组对被调查对象开展法律、财务、投资等方面的调查。
A. 对
B. 错
【判断题】
根据《中铁四局集团有限公司PPP项目投资经营管理办法》(中铁四投(2017)817号),准经营性PPP项目的政府补贴、非经营性PPP项目的政府付费不用纳入地方政府中长期财政规划和人大批准的年度财政预算。
A. 对
B. 错
【判断题】
《中国中铁工程项目责任成本预算文件编制质量评比办法》中规定,经中国中铁工程项目责任成本预算文件编制质量评比,最终得分为90分(含)~95分(不含),评定结果为优秀。
A. 对
B. 错
【判断题】
《关于明确工程项目合同价款分劈有关费用标准的通知》中规定,T梁的捆扎和加固由运梁单位负责,所需支撑架、钢丝绳、垫木等易耗材料由装梁单位承担,费用各自承担。
A. 对
B. 错
【判断题】
《关于授权投资运营公司成立PPP项目管理办公室的通知》中规定,PPP项目的验工计价、变更签证履行完成局内部审批程序后,由项目管理办公室办理外部验工计价、变更签证审批手续。
A. 对
B. 错
【判断题】
《中铁四局集团有限公司风险资金管理办法(暂行)》中规定,各类风险资金管理的第一责任人,为各单位行政主要负责人;直接责任人为各单位发起风险资金业务的部门负责人;财务部门负责人为连带责任人。
A. 对
B. 错
【判断题】
《关于明确PPP项目股权出资款专项融资有关事项的通知》中规定,PPP项目股权出资款专项融资利率执行中国人民银行同期5年期贷款基准利率,且需与内部资信等级评定结果挂钩。
A. 对
B. 错
【判断题】
《关于明确PPP项目股权出资款专项融资有关事项的通知》中规定,PPP项目股权出资款专项融资额度不得超过局财务部核定的“股权出资款”金额,且必须扣除项目已实施部分对应的出资份额。
A. 对
B. 错
【判断题】
《中铁四局集团工程经济管理综合考评办法》中规定,线下考评是指线下对项目现场进行的专项检查或考评,只能依据专项检查标准而不需要依据系统中的固化标准进行检查、考评。
A. 对
B. 错
【判断题】
根据《中国中铁工程项目责任成本预算编制指导意见》的通知(中铁股份成本﹝2018﹞215号),项目综合利润率=(预算综合利润额/项目合同收入)*100%=责任成本利润率+变更索赔创效率
A. 对
B. 错
【判断题】
根据《中国中铁工程项目责任成本预算编制指导意见》的通知(中铁股份成本﹝2018﹞215号),变更索赔创效率=(变更索赔预算创效额/项目合同收入)*100%
A. 对
B. 错
【判断题】
根据《中国中铁工程项目责任成本预算编制指导意见》的通知(中铁股份成本﹝2018﹞215号),责任成本预算编制时,主体工程数量应以总承包合同工程量清单表内的数量确定。
A. 对
B. 错
【判断题】
根据《中国中铁工程项目责任成本预算编制指导意见》的通知(中铁股份成本﹝2018﹞215号),责任成本预算调整原则上以满足管理需要为度,应满足过程管控与考核兑现需要。
A. 对
B. 错
【判断题】
根据中铁四局集团工程项目“三项指标”管理办法(中铁四成本〔2017〕1031号),低于基准利润率标准的项目必须履行例外审批手续,例外审批手续齐全的可不纳入一次经营考核范围
A. 对
B. 错
【判断题】
根据中国中铁关于明确投资项目资本金若干纪律的通知(股份传2017-460),各单位与产业基金等以联合体形式中标的项目,禁止各单位未经股份公司批准,单方面向联合体其他成员出具免除其作为联合体成员的出资责任、免除其应履行合同中所承担的义务、同意联合体其他成员无责退出等方面的承诺。
A. 对
B. 错
【判断题】
根据中国中铁关于“PPP项目融资方案”若干事项的通知,新项目的融资方案及既有融资方案的变更需采用“远期认缴模式”或“权益基金”模式的,应按照股份公司的有关规定办理
A. 对
B. 错
【判断题】
中国中铁关于明确工程项目内部财税管理关系的通知(股份传2018-8)明确,根据国家有关规定,内部关联交易需要遵循市场独立交易规则,并符合企业管理相关制度办法,因此不能采取对部分工程项目随意收取各类服务费的方式。
A. 对
B. 错
【判断题】
根据中铁四财(2017)779号关于明确投资开发类公司、投资运营公司、境内外营销性办事处、区域指挥部、片区管控组有关财务事项的通知,局于2016年成立了京津冀鲁等八个区域指挥部,依据局市场营销部意见,将22个办事处按照区域指挥部管辖范围,由区域指挥部进行统一核算,并由市场营销部修订和完善相关管理制度。
A. 对
B. 错
【判断题】
根据网络电报(2017)620号关于定期上报PPP表外项目公司货币资金信息的通知,“表外SPV公司融资和存量资金信息表”要求在每月20日前及月末之后三日内及时报送。
A. 对
B. 错