【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
ABC
解析
暂无解析
相关试题
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
推荐试题
【单选题】
某公司第一年的销售收入为100万元,销售成本比率为40%;第二年的销售收入为200万元,销售成本比率为50%,则销售成本比率的增加消耗掉了__万元的现金。___
A. 60
B. 50
C. 40
D. 20
【单选题】
企业速动资产包括__。___
A. 待摊费用
B. 预付账款
C. 存货
D. 应收账款
【单选题】
如果某公司固定资产的累计折旧为50万元,总固定资产为100万元,总折旧固定资产为80万元,则该公司的固定资产使用率为__。___
A. 62.5%
B. 50%
C. 80%
D. 1
【单选题】
商业银行对借款人最关心的就是__。___
A. 借款人财务信息的质量
B. 借款人的家庭背景
C. 借款人的商业经验
D. 借款人的现在和未来的偿债能力
【单选题】
市场细分的作用不包括__。___
A. 有利于市场的发展和营销
B. 有利于选择目标市场和制定营销策略
C. 有利于发掘市场机会,开拓新市场,更好地满足不同客户对金融产品的需要
D. 有利于集中人力、物力投入目标市场,提高银行的经济效益
【单选题】
损益表分析中,计算企业净利润的步骤应为__。___
A. 收入一利润总额一毛利润一净利润
B. 毛利润一营业利润-利润总额一净利润
C. 营业利润一毛利润一利润总额一净利润
D. 营业利润一利润总额一毛利润一净利润
【单选题】
下列比率不属于营运能力分析常用的比率的是__。___
A. 总资产周转率
B. 固定资产周转率
C. 流动比率
D. 资产收益率
【单选题】
下列对现金流量的理解,正确的是__。___
A. 是存量的概念,反映一段时间内现金的发生额
B. 主要讨论现金及现金等价物之间的变动
C. 可分为经营活动的现金流量、投资活动的现金流量和融资活动的现金流量
D. 计算时,要以资产负债表为基础,根据损益表期初期末的变动数调整
【单选题】
下列对于经济周期的描述,正确的是__。___
A. 经济周期的供求几乎不变
B. 经济周期中经济增长是均衡的
C. 经济周期中经济增长是非均衡的
D. 经济周期中不存在经济的扩张和收缩
【单选题】
下列关于企业流动比率的说法,正确的是__。___
A. 流动比率也称酸性测验比率
B. 流动比率=流动资产/_流动资产+流动负债_
C. 流动比率反映了企业用来偿还负债的能力
D. 企业的流动比率越高越好
【单选题】
下列关于区域风险的说法,错误的是__。___
A. 区域风险是指受特定区域的自然、社会、经济、文化和银行管理水平等因素影响,而使信贷资产遭受损失的可能性
B. 区域风险包括外部因素引发的区域风险
C. 区域风险包括内部因素导致的区域风险
D. 区域风险表现为利率风险、清算风险、汇率风险
【单选题】
下列关于区域经济政策对信贷风险的影响,说法正确的是__。___
A. 通常国家重点支持地区的信贷风险相对较低
B. 国家重点发展区域之外的地区,银行贷款风险较高
C. 在评价区域政策时,应充分重点吸收学者专家的意见
D. 在评价区域政策时,要把握银行战略导向,有计划而为
【单选题】
下列关于区域市场化程度和法制框架对信贷风险的影响,说法正确的是__。___
A. 市场的成熟完善与否,间接影响到区域发展的快慢
B. 通常情况下,市场化程度越高,区域风险越高
C. 不同区域的法律制度体系完善程度不同,但其对区域风险的影响大同小异
D. 法律制度框架完善的区域,贷款回收能得到有效保障,区域风险相对较低
【单选题】
下列属于银行市场定位中的产品定位手段是__。___
A. 设计特色办公楼
B. 设计专用字体
C. 提供增值服务
D. 设计户外广告
【单选题】
下列选项不能反映借款人盈利能力的比率的有__。___
A. 销售利润率
B. 营业利润率
C. 税前利润率和净利润率
D. 负债与所有者权益比率
【单选题】
下列因素不会导致行业中现有企业之间竞争加剧的是__。___
A. 行业进入障碍较低
B. 产品需求增长迅速
C. 用户转换成本很低
D. 退出障碍较高
【单选题】
信贷经营中,对区域风险影响最大、最直接的因素为__。___
A. 区域自然条件
B. 区域市场化程度与法制框架
C. 区域产业结构
D. 区域经济发展水平
【单选题】
已知某企业存货为18万元,流动负债为20万元,速动比率为1.5,假设该企业的流动资产由速动资产和存货构成,则该企业的流动比率为_____
A. 2.4
B. 2.5
C. 2.3
D. 2.6
【单选题】
以下不属于贷前调查方法的是__。___
A. 现场调研
B. 搜寻调查
C. 委托调查
D. 突击检查
【单选题】
银行广告一般有形象广告和产品广告两种类型。下列不属于产品广告的差异化策略的是__。___
A. 在广告形式上加以创新以引起客户的注意和兴趣
B. 同类产品中,尽力找出并扩大自己的产品和其他银行产品的区别
C. 利用人无我有的创新产品,大做广告
D. 利用产品品质上的优势,突出宣传产品以及形象的差异
【单选题】
银行在对客户进行借款需求分析时,不需要关注的是__。___
A. 企业的借款需求原因,即所借款项的用途
B. 企业的还款来源
C. 企业还款的可靠程度
D. 公司的治理结构
【单选题】
营运能力是指通过借款人__的有关指标反映出来的资产利用效率,它表明客户管理人员经营、管理和运用资产的能力。___
A. 盈利比率
B. 财务杠杆
C. 现金流量
D. 资金周转速度
【单选题】
影响行业的外部因素不包括__。___
A. 国民经济
B. 外部经济
C. 国家政策
D. 企业自身规模效益
【单选题】
与借款人的偿债能力无关的是__。___
A. 盈利能力
B. 营运能力
C. 产品竞争力
D. 资本结构
【单选题】
在行业发展的四阶段模型中,“行业动荡期”一般会出现在__。___
A. 启动阶段
B. 成长阶段
C. 成熟阶段
D. 衰退阶段
【单选题】
在银行流动资金贷前调查报告中,借款人财务状况不包括__。___
A. 流动资金数额和周转速度
B. 主要客户、供应商和分销渠道
C. 资产负债比率
D. 存货净值和周转速度
【单选题】
主要通过流动资产与流动负债的关系反映借款人到期偿还债务能力的指标是__。___
A. 成本费用率
B. 存货持有天数
C. 应收账款回收期
D. 流动比率
【单选题】
__为全流程管理和协议承诺提供了操作的抓手和依据,有助于贷款人防范信用风险和法律风险。___
A. 贷后管理
B. 诚信申贷
C. 实贷实付
D. 审贷分离
【单选题】
从一般意义上讲,产品竞争需要经历__的过程。___
A. 产量竞争—质量竞争—价格竞争—服务竞争—品牌竞争
B. 品牌竞争—产量竞争—质量竞争—价格竞争—服务竞争
C. 质量竞争—价格竞争—服务竞争—产量竞争—品牌竞争
D. 产量竞争—价格竞争—服务竞争—品牌竞争—质量竞争
【单选题】
贷款人应根据审慎性原则,完善授权管理制度,规范审批操作流程,明确贷款审批权限,实行__和__,确保贷款审批人员按照授权独立审批贷款。___
A. 审贷综合;全权审批
B. 审贷分离;授权审批
C. 审贷分离;全权审批
D. 审贷综合;授权审批
【单选题】
对银行而言,进行市场细分时,所要细分的“市场”是指__。___
A. 产品服务区域
B. 能开展业务的地理范围
C. 银行产品、服务实现和潜在的客户
D. 产品服务手段
【单选题】
反映商业银行对贷款损失的弥补能力和对贷款风险的防范能力的关键风险指标是__。___
A. 不良资产率
B. 不良贷款拨备覆盖率
C. 贷款迁徙率
D. 风险运营效率
【单选题】
机动车押品的登记部门为__。___
A. 财税所在地的工商管理部门
B. 机动车管辖地车辆管理所
C. 证券登记结算公司
D. 中国人民银行征信中心
【单选题】
就潜在损失的程度而言,__是首要的银行风险。___
A. 操作风险
B. 信用风险
C. 法律风险
D. 合作机构风险
【单选题】
审批人员不受干扰,按照__的原则自主审批贷款,是信贷风险管理的重要保证。___
A. 注重收益
B. 注重风险
C. 收益与风险平衡
D. 收益大于风险
【单选题】
下列不属于市场细分原则的是__。___
A. 集中性原则
B. 可衡量性原则
C. 可进人原则
D. 经济性原则
【单选题】
下列关于保证期间债权债务转让的说法,错误的是__。___
A. 在合同约定的保证期间,债权人依法将主债权转让给第三人的,若未另行约定,保证人在原保证担保的范围内继续承担保证责任
B. 债权人与债务人协议变更主合同的,若未另行约定,无须取得保证人书面同意
C. 保证期间,债权人许可债务人转让债务的,应当取得保证人书面同意
D. 保证期间,保证人对未经同意转让的债务,不再承担保证责任
【单选题】
下列关于贷款风险分类的说法,错误的是__。___
A. 贷款风险分类指按规定的标准和程序对贷款资产进行分类
B. 贷款风险分类一般先进行定性分类,再进行定量分类
C. 一笔贷款不能同时处于多种贷款形态
D. 贷款形态应遵循不可拆分原则
【单选题】
下列市场细分行为中,违反可衡量性原则的是__。___
A. 依据消费者依赖心理细分市场
B. 依据消费者文化细分信贷市场
C. 依据消费者收入细分信贷市场
D. 依据消费者的职业细分市场
【单选题】
银行从事营销管理主要活动的顺序为__。①制定营销战略②设计营销方案③分析营销机会④调整业务组合⑤实施营销控制___
A. ①②③④⑤
B. ②①③④⑤
C. ③④①②⑤
D. ④③①②⑤