【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
AB
解析
暂无解析
相关试题
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
推荐试题
【多选题】
下列选项中,改变钢材原始化学成分的热处理工艺是___
A. 渗碳
B. 碳氮共渗
C. 调质
D. 中频淬火
【多选题】
属于实轴中频调整的是___
A. 感应圈中心位置
B. 感应圈高度是否一致
C. 花键尺寸
D. 屏蔽圈位置
【多选题】
传动轴总成的主要售后失效形式包括___
A. 异响
B. 抖动
C. 漏油
D. 掉漆
【多选题】
以下体现切削液的作用的是___
A. 防尘
B. 冷却
C. 润滑
D. 清洗
【多选题】
关于PFMEA,以下方法可以降低失效模式风险顺序数说法正确的是___
A. 降低失效潜在后果的严重度
B. 降低失效潜在后果的严重度级别
C. 降低潜在失效起因或机理的发生频率
D. 降低现行过程控制探测等等级
【多选题】
下面指标效率影响OEE是___
A. 时间开动率
B. 性能开动率
C. 人员出勤率
D. 合格品率
【多选题】
下面是SDS新设备的验收标准?___
A. 空运转24小时无故障
B. 连续加工50件(不可作任何工装或参数调整)
C. 连续加工200件(可调整,无故障)
D. 连续生产三班无故障等考核
【多选题】
齿圈与外星轮压装,需要控制:___
A. 压入力
B. 压入位置
C. 压入方向
D. 压入时间
【多选题】
影响固定节压入力的因素有:___
A. 内星轮花键两针距
B. 轴花键两针距
C. 轴花键累计误差
D. 花键有效长度
【多选题】
机器人系统为保证被焊工件的一致性,所采用的工装夹具的作用是()___
A. 保证焊接尺寸
B. 提高焊接效率
C. 提高装配效率
D. 防止焊接变形
【多选题】
工业4.0时代,工业布局更集中趋向于 ( )___
A. 劳力丰富地区
B. 原料、燃料地
C. 科技发达地区
D. 交通运输枢纽
【多选题】
工业4.0的三大主题是___
A. 智能物流
B. 智慧工厂
C. 智能仓库
D. 智能生产
【多选题】
电子标签的技术参数主要有()___
A. 传输速率
B. 读写速度
C. 工作频率
D. 能量需求
【多选题】
测量表面粗糙度的方法常用的有哪几种()___
A. 比较法
B. 光切法
C. 干涉法
D. 针描法
【多选题】
精益生产方式的两大支柱是___
A. 准时化
B. 自动化
C. 标准化
D. 理论化
【多选题】
JLR D8 PHEV 总装线下线的总成包括下列哪些部分___
A. 电机
B. 逆变器
C. 变速箱
D. 减速箱
【多选题】
激光相对于其他光源的优点为:___
A. 单色性
B. 节能
C. 高亮度
D. 方向性好
【多选题】
以下哪些齿轮为平行轴齿轮___
A. 准双曲面齿轮
B. 圆柱直齿轮
C. 斜齿轮
D. 涡轮蜗杆
【多选题】
JLR 20MY PTU EOL测试内容___
A. 传递误差
B. 断开功能
C. 断开机构结合前后扭矩变化
D. 振动
E. 拖拽力矩
【多选题】
关于中频淬火时频率选择说法正确的是___
A. 中频机不起振,无法加热
B. 中频频率过高,工件表面熔化
C. 淬硬层不受影响
D. 频率选择不合理,影响淬硬层
【多选题】
实轴涂装前处理过程中磷化的作用为:___
A. 提高喷粉的附着力
B. 去除工件表面油脂
C. 提高喷粉的耐盐雾性能
D. 去除工件表面氧化皮
【多选题】
不属于中频淬火后淬硬层金相组织为:___
A. 马氏体
B. 屈氏体
C. 索氏体
D. 贝氏体
【多选题】
关于淬火液对中频淬火的影响,下面说法正确的是:___
A. 当淬硬层硬度偏高时,增加淬火液温度硬度降低
B. 当淬硬层硬度偏高时,增加淬火液浓度硬度降低
C. 当淬硬层硬度偏高时,降低淬火液浓度硬度降低
D. 当淬硬层深度偏低时,降低淬火液温度硬度增加
【多选题】
纳铁福工厂内,拥有6轴及以上自由度的自动化机械是:___
A. 桁架机械手
B. 双工位铣床
C. 工业机器人
D. 人机协作机器人
【多选题】
以下哪个属于MES的生产管理模块功能:___
A. 生产条码管理
B. 生产数据采集
C. 工单管理
D. 分层审核
【多选题】
纳铁福工厂内,目前不是精确追溯的方式有____.___
A. RFID
B. 设备上位机存储
C. 激光打标二维码
D. 无纸化屏
【多选题】
检验空心轴摩擦焊焊接质量可进行哪些试验? ___
A. 开花试验
B. 压断试验
C. 硬度试验
D. 静压试验
【多选题】
以下哪些内星轮热处理方式不是中频,而是渗碳淬火()___
A. AC节内星轮
B. VL节内星轮
C. SX节内星轮
D. DO节内星轮
【多选题】
以下哪种零件不需要光饰()___
A. 球笼
B. MTS轴
C. GI三销轴
D. AAR三销轴
【多选题】
以下哪些尺寸是使用三坐标进行测量()___
A. 内星轮球道相似度
B. SX内星轮A-B球道偏置
C. AAR三销轴轴头位置度
D. 球笼窗口有效长度
【多选题】
MTS轴工艺流程包含哪些道序()___
A. 旋锻
B. 冷挤压花键
C. 校直
D. 精磨外圆
【多选题】
SDS 产品图纸上,对于尺寸标注为 φ36 的孔,下列说法错误的是:___
A. 该尺寸没有公差要求
B. 该尺寸公差为“+”公差
C. 该尺寸公差为“-”公差
D. 该尺寸公差为“±”公差
【多选题】
 对于“工艺”一词,下列描述不正确的是:___
A. 工程师的语言
B. 指导生产的图纸
C.  规定生产操作方法的文件
D. 使各种原材料、半成品成为产品的方法和过程
【多选题】
不平衡产生的基本原因有:___
A. 设计误差
B. 材料缺陷
C. 加工误差
D. 装配误差
【多选题】
下列哪种焊接方法在焊接过程中有液态金属出现?___
A. 摩擦焊
B. 磁弧焊
C. 凸焊
D. 熔化极气体保护焊
【多选题】
下列过程变量中,与磁弧焊有关的是:___
A. 送丝速度
B. 顶锻压力
C. 焊接电压
D. 保护体气流量
【多选题】
表面前处理是油漆前的重要道序,将被涂物处理后使其满足喷漆要求。如果前处理效果不佳,会造成哪些影响:___
A. 耐腐蚀效果不佳
B. 结合力效果不佳
C. 漆膜颜色发灰、发白 
D. 表面缩孔
【单选题】
每个缔约国应当以现有最有效的通讯方式通过《国际卫生条例(2005)》(以下简称《条例》)国家归口单位在评估公共卫生信息后____小时内向世卫组织通报在本国领土内发生、并按决策文件有可能构成国际关注的突发公共卫生情况的所有事件,以及为应对这些事件所采取的任何卫生措施。___
A. 12
B. 24
C. 48
D. 72
【单选题】
在本国领土发生事件的缔约国可要求世卫组织协助评估该缔约国获取的____流行病学证据。___
A. 指定
B. 任何
C. 随机
D. 部分
【单选题】
每一缔约国应当按照《条例》附件1的要求尽速、但自《条例》对该缔约国生效之日起不迟于____年,发展、加强和维持快速和有效应对公共卫生危害和国际关注的突发公共卫生事件的能力。___
A. 2
B. 3
C. 4
D. 5