【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
ABD
解析
暂无解析
相关试题
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
推荐试题
【多选题】
协议存款在___办理
A. 任何网点
B. 单位定期账户开户行
C. 单位一般账户开户行
D. 单位基本账户开户行
【多选题】
三、协议存款目前主要不包括 ___。
A. 理财公司协议存款
B. 社保基金协议存款
C. 邮政储蓄协议存款
D. 养老保险个人账户基金人民币协议存款
【多选题】
协议存款目前主要包括___。
A. 机关事业协议存款;
B. 社保基金协议存款;
C. 邮政储蓄协议存款;
D. 养老保险个人账户基金人民币协议存款 ;
E. 保险公司协议存款;
F. 证券公司协议存款。
【多选题】
以下有关协议存款说法正确的是:___
A. 必须在单位定期账户的开户行进行签发凭证。
B. 定期存款必须先开零值账户,再进行置款存入,凭证签发。跟原先开户,存款,签发凭证在一个交易里实现不同。以存入款之为起息日。
C. 开立的定期零值账户,在未存入钱之前,当日不能销户只能冲账。已有值的定期账户,可以当日销户。
D. 置款时,转帐金额50万(含),柜员相互授权。
【多选题】
以下说法正确的是___。
A. 协议存款手工结息该交易相当于一个预约结息,预约某个时间结息,
B. “单户结息日”就是指“某个时间结息日”,结息时间段为上一个结息日----单户结息日。
C. 因为结息处理在晚上批处理时,所以单户结息日不能是交易当日。
D. 自动结息后,可以在回单打印里打印结息回单。
【多选题】
___是指本行存入于境内、境外银行和非银行金融构的款项。
A. 存放同业
B. 上存拆借
C. 内部清算
D. 协议存款
【多选题】
同业款项汇兑的扣款科目:___
A. 1140
B. 2010
C. 2180
D. 2050
【多选题】
存放同业内部帐户开户时,以下说法错误的是:___
A. 输入客户号(开内部户的客户号统一为999999999)
B. 选取产品(只能选择产品号为3开头的活期产品),计息,存款类型为普通存款。
C. 支行及以下分支机构不得开立。
【多选题】
分行及县域支行可以在所属地国有银行或一级法人银行开立人民币结算性存放同业银行结算账户___,用于代理现金解缴和代理支付结算,但不能开立人民币投融资性存放同业银行结算账户。
A. 分行不超过1家、县域支行不超过1家
B. 分行不超过2家、县域支行不超过2家
C. 分行不超过2家、县域支行不超过1家
D. 分行不超过1家、县域支行不超过2家
【多选题】
从我行做汇兑业务至我行存放同业的账户时,录入柜员需要审核如下:___
A. 结算业务申请书填写是否正确、完整。必须记载的各项内容是否完整准确,包括日期、业务类型、申请人账号、申请人户名、开户行信息、收款人账号、收款人户名、收款人账号开户行名称、申请人签章、金额大小写等;
B. 结算业务申请书各联是否套写,联次是否齐全;
C. 结算业务申请书出票人签章是否与预留银行印鉴相符;
D. 是否有对方银行的入账回单。
【多选题】
以下说法正确的是___
A. 存放同业是指本行存入于境内、境外银行和非银行金融构的款项
B. 存放同业与同业存放是一个概念
C. 存放同业是我国商业银行的现金资产之一
D. 存放同业属于资产类科目
【多选题】
分行及县域支行可以在所属地国有银行或一级法人银行开立人民币结算性存放同业银行结算账户(分行不超过2家、县域支行不超过1家),可用于___,但不能开立人民币投融资性存放同业银行结算账户。
A. 代理现金解缴
B. 代理支付结算
C. 代理理财业务
D. 代理基金业务
【多选题】
银行可在账户开立___为企业办理网上银行注册。
A. 当日
B. 次日
C. 一个工作日后
D. 三个工作日后
【多选题】
企业客户注册企业网银须到账户开户网点柜台办理,同一客户号可以注册___网上银行。
A. 1个
B. 2个
C. 3个
D. 多个
【多选题】
企业网银大众版不支持___交易。
A. 企业账户查询
B. 回单管理
C. 银行对账
D. 支付结算
【多选题】
对单独设置企业网银落地限额审批的企业,交易金额在500万以上的审批:___。
A. 主办会计
B. 营业部主任
C. 由会计主管审批后,再根据大额支付报告管理流程向相关有权人报备(有权人由各分支行根据资金管理需要指定),并在《电子银行后台管理业务审核表》上注明“已报备”字样。
D. 机构负责人
【多选题】
企业网银U盾工本费为___元/个。
A. 33
B. 35
C. 20
D. 30
【多选题】
企业网上银行有关操作员操作的哪一项交易无需授权中心审核即时生效___
A. 企业网银签约
B. 新增操作员
C. 证书绑定
D. 加挂账户
【多选题】
我行新网银客户U盾密码锁定后,需要插上锁定的U盾,登陆后台管理系统,先做U盾初始化,再做___,打印两码后,交客户自行下载证书。
A. 证书绑定
B. 证书解绑
C. 证书补发
D. 证书两码重发
【多选题】
以下关于企业网银说法正确的是___
A. 企业网银注销,需到我行任一网点申请办理
B. 企业网银注销兰盾工本费及已收年费可以退还,未到批扣年费时限的证书年费不再收取。
C. 企业网银注销无需授权中心审核。
D. 注册企业网银的账户状态必须为正常 ,休眠账户不得注册企业网银。
【多选题】
注册企业网银的账户状态必须为___,休眠账户不得注册企业网银。
A. 预开户
B. 冻结
C. 正常
D. 止付
【多选题】
企业网银操作员兰盾/一代网银客户U盾遗失、一代网银客户U盾口令被锁定或一代网银证书使用到期未自助更新的,需至开户网点办理___交易。
A. 证书补发
B. 旧证书解绑再做新证书绑定
C. 证书重发
D. 解锁
【多选题】
处理企业网银落地业务的落地行是___
A. 账户开户网点
B. 网银注册签约网点
C. 任一营业网点
D. 总行营业部
【多选题】
企业网银代发工资总行级限额执行标准为单笔金额___,日累计金额( )。
A. 200万元(含),500万元(含)
B. 500万元(含),不限
C. 500万元(含),1000万元(含)
D. 1000万元(含),不限
【多选题】
可注册企业网银用户的账户类型不包括___
A. 基本存款账户
B. 一般存款账户
C. 专用存款账户
D. 验资性临时存款账户
【多选题】
二代企业网银客户U盾密码密码遗忘或锁定时,柜面需如何操作?___
A. 携带U盾至开户行办理U盾初始化,U盾初始化在网上银行后台管理系统“证书助手”下的“U盾初始化”操作,再进行证书补发
B. 进行证书解绑后再绑定
C. 进行U盾密码重置
D. 进行企业网银销户后再重开
【多选题】
企业网银操作员证书年费为___元/个/人
A. 100
B. 200
C. 300
D. 400
【多选题】
企业客户账户为久悬户或企业客户操作员年费欠费___以上或其它符合我行网银协议中解除网银条款时网银开户行可主动关闭其网银账户
A. 三个月
B. 6个月
C. 一年
D. 2年
【多选题】
对已落地的企业网银交易,单笔___以下由经办柜员审批;( )
A. 50万元(不含)
B. 100万元(含)
C. 100万元(不含)
D. 200万元(不含)
【多选题】
企业网上银行大众版使用___验证。
A. 短信静态码
B. 短信二维码
C. 数字证书
D. 短信动态码
【多选题】
下列关于企业网上银行说法正确的是___。
A. 初始登录密码为:111111
B. 兰盾无初始口令,由客户首次使用自行设置
C. 登录密码输错五次会锁定
D. 兰盾口令输错五次会锁定
【多选题】
企业网银由大众版升级为证书版需到___办理。
A. 原大众版注册网点
B. 大众版加挂网点
C. 网上自行操作
D. 客户号开户网点
【多选题】
网银注册及注销资料的保管期限为客户注销网银业务后___。
A. 3 年
B. 5年
C. 10年
D. 永久
【多选题】
企业网上银行(以下简称“网银”)是指我行利用互联网技术为我行企业客户、提供在线账户___、集团公司账务管理等各种金融服务的渠道。
A. 查询
B. 转账
C. 汇款
【多选题】
注册企业网银的账户状态必须为正常,___不得注册企业网银。
A. 预开户
B. 冻结
C. 止付
D. 休眠账户
【多选题】
办理企业网银操作员删除和新增业务时,应注意以下哪几点___
A. 不能把所有操作员全部删除完后再新增操作员,至少需保留一个操作员,先新增操作员绑定证书后再删除操作员。
B. 《绍兴银行单位银行结算账户综合服务申请表》留存联及授权书等其他客户提供的开户资料、联网核查资料归档保管。
C. 操作员删除允许可以不提供被删除操作员的身份证原件及复印件。
【多选题】
我行企业网上银行按认证方式分为___。
A. 大众版
B. 证书版
C. 短信版
D. 兰证书版
【多选题】
2019年5月29日起,我行取消企业网银落地限额审批,下列说法正确的是___
A. 对单独设置企业网银落地限额审批的客户(如监管账户),仍按设置的限额进行落地审批
B. 对未单独设置企业网银落地限额的客户,取消落地限额审批(原单独申请落地控制限额管理的机构除外)。
C. 取消转账交易限额管理控制
D. 转账交易限额管理不受影响,仍按设置的单笔限额或累计限额进行限额控制。
【多选题】
可注册企业网银用户的账户类型包括___
A. 基本存款账户
B. 一般存款账户
C. 专用存款账户
D. 临时存款账户(验资性临时存款账户及过有效期的账户除外)。
【多选题】
客户申请我行企业网银行需要提供以下书面申请资料___
A. 《绍兴银行单位银行结算账户综合服务申请表》、《绍兴银行企业网上银行服务协议》、《绍兴银行单位银行结算账户综合服务协议签署表》
B. 营业执照(机关团体等无法提供工商营业执照的单位提供和开户时相同文件)正本或副本原件,也可以是电子营业执照以及加盖公章的复印件。
C. 企业法定代表人和操作员的身份证明原件及加盖公章的复印件。
D. 如非法定代表人办理的,需由单位法定代表人签字的通用版《法定代表人(单位负责人)授权书》及法定代表人和授权代理人身份证原件及加盖公章的复印件。
E. 拟申请操作员身份证原件及复印件一份(若企业操作员超过3个以上,需另填写申请表登记操作员信息)。