An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
AD
解析
暂无解析
相关试题
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
推荐试题
【判断题】
混凝土枕钢筋或钢丝外露,钢筋未锈蚀,长度超过80mm,判定为重伤
A. 对
B. 错
【判断题】
混凝土枕碎石道床顶面应与轨枕中部顶面平齐,木枕碎石道床顶面应低于木枕顶面20mm
A. 对
B. 错
【判断题】
长度大于100m的隧道内和隧道外U形结构地段及高架桥和大于50m的单体桥地段,宜采用短枕式或长枕式整体道床
A. 对
B. 错
【判断题】
整体道床应设置伸缩缝,隧道内宜每隔12.5m,形结构地段和高架桥上宜每隔6m设置一个
A. 对
B. 错
【判断题】
在结构沉降缝和高架桥梁缝处,可不设置道床伸缩缝
A. 对
B. 错
【判断题】
排水沟的纵向坡度应与线路坡度一致,线路平坡地段,排水沟纵向坡度不宜小于3%
A. 对
B. 错
【判断题】
短轨枕在工厂预制,混凝土强度等级为C40,其横断面为梯形,底部外露钢筋钩,以加强道床混凝土的联结
A. 对
B. 错
【判断题】
地下线道床排水沟纵向坡度宜与线路坡度一致
A. 对
B. 错
【判断题】
线路平坡地段,排水沟纵向坡度不宜小于2‰
A. 对
B. 错
【判断题】
车场线有砟道床的道床肩宽不应小于200mm
A. 对
B. 错
【判断题】
无缝线路应设置位移观测桩,设置的基础应牢固稳定。钢轨伸缩调节器和道岔应按一个单元轨节设置位移观测桩
A. 对
B. 错
【判断题】
减振级别宜划分为中等减振、高等减振和特殊减振
A. 对
B. 错
【判断题】
车场线终端应采用滑动式车挡
A. 对
B. 错
【判断题】
警冲标应设在两设备限界相交处,其余线路标志应安装在行车方向右侧司机易见的位置
A. 对
B. 错
【判断题】
路基应有完善的排水系统,并宜与市政排水设施相结合
A. 对
B. 错
【判断题】
路基排水纵坡不应小于2‰,单面排水坡段长度不宜大于400m
A. 对
B. 错
【判断题】
维修工作,必须掌握设备技术状态变化规律,贯彻“安全第一,预防为主”的原则
A. 对
B. 错
【判断题】
道岔范围内不设轨底坡,若与有轨底坡轨道连接时,道岔前后两根轨枕铁垫板下设轨底顺坡垫板过渡
A. 对
B. 错
【判断题】
60kg/m钢轨9号单开道岔采用相离圆曲线线型,60AT弹性可弯尖轨,尖轨尖端采用藏尖式,跟端采用间隔铁结构
A. 对
B. 错
【判断题】
轨下部位混凝土道床厚度,直线地段不宜小于130mm、曲线地段不宜小于110mm
A. 对
B. 错
【判断题】
进行绝缘接头拆卸作业时,需通号人员配合,长柄工具应有绝缘套,作业中不得将两股钢轨搭接
A. 对
B. 错
【单选题】
依据《云南电网公司安全管理办法》,安全监督人员对监督检查过程中发现的可能直接危及人身、电网、设备安全的问题,( )采取适当的措施督促现场作业人员进行纠正,防止因纠正行为不当对现场作业带来新的风险。___
A. 视具体情况
B. 在工作结束后
C. 必须立即
D. 制定计划
【单选题】
依据《云南电网有限责任公司安全监督管理办法》,各级专业部门相关管理人员岗位职责应明确安全( )工作职责,实现“管业务必须管安全”。___
A. 监督实施
B. 监督管理
C. 监督检查
D. 监督强化
【单选题】
依据《中华人民共和国安全生产法》,生产经营单位必须对安全设备进行经常性维护、保养,并( ),保证正常运转。___
A. 不定期检测
B. 定期检测
C. 检测
【单选题】
依据《中国南方电网有限责任公司电力安全工作规程》,工作方案编制与现场勘查的关系正确的是:()___
A. 现场勘查在工作方案编制后进行
B. 现场勘查结果是编制工作方案的依据
C. 现场勘查与工作方案各自开展
【单选题】
依据《中华人民共和国安全生产法》,生产经营单位的特种作业人员必须按照国家有关规定经专门的安全作业培训,取得( ),方可上岗作业。___
A. 技能等级证
B. 相应资格
C. 操作权限
D. 对应学历
【单选题】
依据《电力安全生产监督管理办法》,( )依照本办法,对电力企业的电力运行安全(不包括核安全)、电力建设施工安全、电力工程质量安全、电力应急、水电站大坝运行安全和电力可靠性工作等方面实施监督管理。___
A. 国务院
B. 国家能源局及其派出机构
C. 国家发展和改革委员会
D. 国家电力监管委员会
【单选题】
依据《云南电网有限责任公司安全生产领域监督问责业务指导书》,发生3人以下死亡的一般人身死亡事故,分子公司( )个工作日内到公司说清楚,县公司( )个工作日内到分子公司说清楚。___
A. 5、3
B. 10、5
C. 7、5
D. 7、3
【单选题】
依据《电力安全生产监督管理办法》,电力企业是电力安全生产的( ),应当遵照国家有关安全生产的法律法规、制度和标准,建立健全电力安全生产责任制,加强电力安全生产管理,完善电力安全生产条件,确保电力安全生产。___
A. 经营单位
B. 事业单位
C. 执行单位
D. 责任主体
【单选题】
依据《云南电网有限责任公司安全监督管理办法》,各级安全监管部、专业部门要按照本单位安全生产实际,定期编制发布( ),明确安全检查任务、责任人、时间及要求。___
A. 安全巡查计划
B. 安全检查计划
C. 安全管理计划
D. 安全年度工作计划
【单选题】
依据《云南电网有限责任公司安全监督管理办法》,各级安全监管部负责监督各专业部门及所队(分局)风险管控情况,抽查现场安全风险管控措施落实情况,确保各专业、各单位安全风险“可控,在控”。其中,公司重点监督中及以上风险,地市级生产单位重点监督( )上风险,所队(分局)重点监督可接受及以上风险。___
A. 低
B. 低及以上
C. 低级以下
D. 高
【单选题】
依据《云南电网公司安全管理办法》,各单位应设立( ),作为应急管理的领导机构,负责决定应急管理重大事项,指挥应急处置工作。___
A. 应急处理中心
B. 应急指挥中心
C. 应急急救中心
D. 应急行动中心
【单选题】
依据《中华人民共和国安全生产法》,生产经营单位应当建立健全生产安全事故( )制度,采取技术、管理措施,及时发现并消除事故隐患。事故隐患排查治理情况应当如实记录,并向从业人员通报。___
A. 应急处置
B. 问题整改管理
C. 隐患排查治理
D. 预防管控
【单选题】
依据《云南电网公司安全管理办法》,安全生产责任制考核,包括安全( )考核和安全管理综合评价。___
A. 过程
B. 管理
C. 绩效
D. 成效
【单选题】
依据《云南电网有限责任公司安全生产领域监督问责业务指导书》,“红牌”警告期为( )年,期满后,经事故单位申请,由公司组织检查合格后摘牌。___
A. 半年或一年
B. 一年
C. 两年
D. 一至两年
【单选题】
依据《中国南方电网有限责任公司安全生产令》,加强应急管理,完善应急指挥系统,强化( )管理,提高应急管理水平和应急处置能力。___
A. 应急队伍
B. 应急装备
C. 预案
D. 联动
【单选题】
依据《中华人民共和国安全生产法》,生产经营项目、场所发包或者出租给其他单位的,生产经营单位应当与承包单位、承租单位签订专门的( ),或者在承包合同、租赁合同中约定各自的安全生产管理职责。___
A. 项目合同
B. 安全生产管理协议
C. 合同或协议
D. 责任管理机制
【单选题】
依据《云南电网公司安全管理办法》,各单位应设立( ),作为安全生产的最高领导机构。___
A. 应急指挥中心
B. 安全生产调查委员会
C. 职工代表委员会
D. 安全生产委员会
【单选题】
依据《云南电网有限责任公司安全生产领域监督问责业务指导书》,发生电力人身事故(含负有监督管理责任的承包商人身事故)、有责任的一般及以上电力安全事故、设备事故时等级调整方式为( )。___
A. 警告
B. 降星
C. 降钻
D. 取消钻级
【单选题】
依据《云南电网公司安全管理办法》,各类特种作业人员,必须通过国家规定的( )培训考试合格后,持证上岗,并按规定参加复审培训考核。___
A. 安全
B. 专业
C. 素质
D. 操作