【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
查看试卷,进入试卷练习
微信扫一扫,开始刷题

答案
BCE
解析
暂无解析
相关试题
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
推荐试题
【单选题】
我国的手工业社会主义改造大体上经历了___三个阶段。
A. 互助组、初级社和高级社
B. 供销小组、供销合作社和生产合作社
C. 初级形式国家资本主义、个别企业公私合营和全行业公司合营
D. 委托加工、计划订货和统购包销
【单选题】
我国的资本主义工商业的社会主义改造大体上经历了___三个阶段。
A. 互助组、初级社和高级社。
B. 供销小组、供销合作社和生产合作社
C. 初级形式国家资本主义、个别企业公私合营和全行业公司合营
D. 委托加工、计划订货和统购包销
【单选题】
国家资本主义有初级形式和高级形式之分,初级形式的国家资本主义是___。
A. 个别企业的公私合营和全行业公私合营
B. 供销小组、供销合作社和生产合作社
C. 国家对私营工商业实行委托加工、计划订货、统购包销、经销代销等
D. 委托加工、计划订货和统购包销
【单选题】
国家资本主义有初级形式和高级形式之分,高级形式的国家资本主义是___。
A. 个别企业的公私合营和全行业公私合营
B. 供销小组、供销合作社和生产合作社
C. 国家对私营工商业实行委托加工、计划订货、统购包销、经销代销等
D. 委托加工、计划订货和统购包销
【单选题】
1953年9月,毛泽东在对民主党派和工商界部分代表讲话时指出:改造资本主义工商业和逐步完成社会主义过渡的必经之路是 ___
A. 剥夺资本家的财产
B. 排挤私营工商业
C. 国家资本主义
D. 保护民族工商业
【单选题】
社会主义过渡时期总路线错误的说法是 ___
A. 实现社会主义工业化、农业手工业和资本主义工商业的社会主义改造
B. 过渡时期结束的标志是社会主义改造结束
C. 以单一的社会主义公有制和计划经济体制为目标
D. 以中国特色社会主义为目标
【单选题】
1956年我国在生产资料所有制的社会主义改造基本完成后,开始进入 ___
A. 新民主主义时期
B. 国民经济恢复时期
C. 从新民主主义向社会主义过渡时期
D. 全面建设社会主义时期
【单选题】
1956年底我国对农业、手工业和资本主义工商业的社会主义改造基本完成,标志着___基本制度在我国初步确立。
A. 社会主义
B. 新民主主义
C. 共产主义
D. 国家资本主义
【单选题】
社会主义改造中最具有中国特色的对马克思主义社会主义学说贡献最大的是对 ___
A. 对资本主义工商业的社会主义改造
B. 对农业的社会主义改造
C. 对手工业的社会主义改造
D. 社会主义工业化道路
【单选题】
1954年9月,第一届全国人民代表大会的召开和___的制定及颁布施行,明确地规定了我国的国体和政体。
A. 《中华人民共和国宪法》
B. 《共同纲领》
C. 《中华人民共和国临时宪法》
D. 《临时约法》
【单选题】
中国社会主义基本制度的确立,使占世界人口四分之一的东方大国进入了社会主义社会,这是___运动史上又一个历史性的伟大胜利。
A. 世界无产阶级
B. 世界共产主义
C. 世界社会主义
D. 世界落后国家
【单选题】
毛泽东提出的实现马克思主义与中国实际的“第二次结合”,就是要___。
A. 走出中国自己的社会主义革命道路
B. 走出中国自己的社会主义建设道路
C. 延续“第一次结合”的内容
D. 弥补“第一次结合”的错误
【单选题】
中国共产党关于中国社会主义建设道路的探索___
A. 是从探索了工业化的道路后开始的
B. 是在对苏联模式弊端已有认识的背景下开始的
C. 是从对社会主义社会基本矛盾的认识开始的
D. 是从中国社会主义改造道路的实践开始的
【单选题】
毛泽东对中国特色社会主义建设道路初步探索,提出一系列关于社会主义建设的重要理论观点的著作是___。
A. 《论十大关系》
B. 《关于正确处理人民内部矛盾的问题》
C. 《关于国家资本主义经济》
D. 《国家与革命》
【单选题】
毛泽东提出“以苏联经验为鉴戒,走自己的路”重要思想的著作是___
A. 《新民主主义论》
B. 《论人民民主专政》
C. 《论十大关系》
D. 《为建设一个伟大的社会主义国家而奋斗》
【单选题】
毛泽东在《论十大关系》的讲话中,提出中国社会主义建设的基本方针是___
A. 解放思想,实事求是
B. 既反保守又反冒进,在综合平衡中稳步前进
C. 把国内外一切积极因素调动起来,为社会主义事业服务
D. 在新的生产关系下保护和发展生产力
【单选题】
毛泽东把重工业、轻工业和农业的发展关系问题提到中国工业化道路的高度加以论述的文章是___
A. 《论十大关系》
B. 《关于正确处理人民内部矛盾的问题》
C. 《在中国共产党全国代表会议上的讲话》
D. 《为建设一个伟大的社会主义国家而奋斗》
【单选题】
毛泽东在《论十大关系》的报告中指出,在社会主义事业的发展中,一般来说,经济因素是处于___,占有压倒的优势,这是社会主义事业必定胜利的可靠保证。
A. 主导的、统治地位的
B. 主导的、被统治地位的
C. 非主导的、统治地位的
D. 非主导的、被统治地位的
【单选题】
1956年中共八大提出我国国内的主要矛盾是___
A. 无产阶级同资产阶级的矛盾
B. 社会主义道路与资本主义道路的矛盾
C. 先进的生产关系与落后的生产力之间的矛盾
D. 人民对于经济文化迅速发展的需要同当前经济文化不能满足人民需要状况之间的矛盾
【单选题】
在我国社会主义改造完成后,党的中心任务是___
A. 进行思想上、政治上的社会主义革命
B. 继续进行两个阶级、两条道路的斗争
C. 大力发展社会生产力
D. 坚持无产阶级专政下的继续革命
【单选题】
20世纪50年代,我国提出了建设四个现代化的社会主义强国的战略目标,其中四个现代化是指___
A. 工业、农业、商业和交通业
B. 工业、农业、商业和科学技术
C. 工业、农业、国防和科学技术
D. 工业、农业、国防和交通业
【单选题】
中共八大提出的我国当时经济建设的指导方针是___
A. 调动一切积极因素,建设社会主义强国
B. 既反保守又反冒进,在综合平衡中稳步前进
C. 在新的生产关系下保护和发展生产力
D. 尽快地把我国由农业国变为先进的工业国
【单选题】
我国社会主义改造基本完成后,其所有制结构所呈现的状况是___
A. 完全的所有制
B. 基本单一的公有制
C. 社会主义公有制为主体,多种经济形式共同发展
D. 国营经济为领导,多种经济形式并存
【单选题】
社会主义改造基本完成后,国家政治生活的主题是___
A. 探索本国建设社会主义的道路
B. 不断解决仍然存在的敌我矛盾,同时正确处理人民内部矛盾
C. 正确处理人民内部矛盾
D. 集中力量解决人民对于建立先进的工业国的要求同落后的农业国现实之间的矛盾
【单选题】
毛泽东在《关于正确处理人民内部矛盾的问题》中提出解决社会主义社会基本矛盾的途径是___
A. 进行新民主主义革命
B. 进行社会主义革命
C. 依靠社会主义制度本身的力量进行改革
D. 进行无产阶级专政下的继续革命
【单选题】
我国社会主义建设的战略目标是___
A. 实现农业、工业、国防和科技现代化
B. 实现工业化和经济的社会化、市场化和现代化
C. 实现经济、政治、文化现代化
D. 把我国建设成为富强、民主、文明的社会主义现代化国家