【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
查看试卷,进入试卷练习
微信扫一扫,开始刷题

答案
BC
解析
暂无解析
相关试题
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
【多选题】
As part of a multisite Single Sign-On (SSO) deployment what two steps are required to ensure that a change to one Single Sign-On instance is propagated to the other instances? (Choose two.)___
A. Schedule a Replication Task on the primary instance
B. Select the first instance during the installation of subsequent instances
C. During the installation of each instance choose Linked-Mode
D. Enable Synchronize to Active Directory on each instance
【多选题】
You need to add an object to an existing vApp using the vSphere Web Client. How is this accomplished?___
A. Create an Object Inside the vApp.
B. Add an Object to a vApp.
C. Add an Object to the
D. atastore the vApp is located in.
【多选题】
Which three steps must be taken to use vSphere Update Manager 6.x to upgrade an ESXi 5.5 host to vSphere 6.x? (Choose three.)___
A. Download an ESXi Image.
B. Configure the vSphere Update Manager Download Service.
C. Create a baseline and attach it to the ESXi Host.
D. Scan the vCenter Content Library for the
E. SXi Image.
【多选题】
Which two options would allow a database administrator, with no access to the vSphere infrastructure, to connect to a virtual machine? (Choose two.)___
A. Use the Virtual Machine Remote Console (VMRC).
B. Use Remote Desktop Protocol (RDP) to connect.
C. Ask the vSphere administrator to grant permission to access the console through vCenter Server.
D. Ask the vSphere administrator to grant permission to access with the Horizon View Direct Connect Client.
推荐试题
【单选题】
CCE142、项目经理收到一项请求,在新产品发布中包含一项安全功能。这项功能未包含在项目管理计划或进度计划中。项目经理确定可以在不影响项目进度或预算的情况下实施这项功能。项目经理下一步应该怎么做?___
A. 按照变更管理计划签发变更请求。
B. 要求安全分析员尽快实施该功能。
C. 拒绝请求。
D. 更新项目管理计划和经验教训文件。
【单选题】
CCE143、虽然指导委员会的所有成员在一个项目中都有利益,但他们的了解程度有所不同。此外,其中一些成员比另一些成员更有时间参加项目会议。应该改进哪个过程?___
A. 管理相关方的参与
B. 识别相关方
C. 制定相关方管理计划
D. 监督相关方的参与
【单选题】
CCE144、公司获得一个城镇公共交通系统的施工项目。在相关方分析期间,由于当地制造公司所有人对当政府的影响力,项目经理将他们识别作为关键相关方。但是,这些相关方对项目的兴趣不大,因为他们的工厂位于城镇范围之外,且其员工将不使用该交通系统。根据权力/利益方格.项目经理应如何处理这些相关方?___
A. 令其满意
B. 随时告知
C. 重点管理
D. 监督
【单选题】
CCE145、项目已经完成,且已经获得项目可交付成果的最终验收。项目经理这时意识到,由于与另一个正在进行中的项目存在冲突,可交付成果的所有权无法移交运营。项目经理应该怎么做?___
A. 与相关方开会。
B. 通知项目集经理。
C. 将问题上报给项目组合经理。
D. 项目收尾。
【单选题】
CCE146、项目经理被任命管理一个处于另一个国家的大型施工项目。在与项目团队的第一次会议期间,一名主题专家(SME)表达了自己对因突发的设备延期将导致项目不能按时完成的担忧。项目经理应该首先审查哪一份文件来确定相关方对项目进度影响的容忍度?___
A. 项目进度计划
B. 风险登记册
C. 风险管理计划
D. 沟通管理计划
【单选题】
CCE147、一个项目需要由一家国外供应商供应的战略材料。项目经理了解到该材料预期将涨价,将会影响项目预算,项目团队找到一家销售这种材料的本地供应商,可以以合理的价格满足项目技术规范。项目经理下一步应该怎么做?___
A. 使用新价格更新成本基准。
B. 执行固定总价合同(FFP)。
C. 登记一项新风险,并计划减轻潜在的涨价风险。
D. 提交变更请求,从本地供应商采购材料。
【单选题】
CCE148、一名高级项目经理正在管理一支大型专家团队。团队中产生分歧时,高级项目经理考虑每个人的观点并恢复秩序。这描述的是什么冲突解决技术?___
A. 合作/解决问题
B. 强迫/命令
C. 妥协/调解
D. 缓解/包容
【单选题】
CCE149、项目经理难以管理一次电话会议。多名项目团队成员同时说话,一名成员直接对项目团队领导做出攻击性评论。若要避免这个问题,项目经理应该事先做什么?___
A. 让团队成员集中办公
B. 利用人员评估工具
C. 制定基本规则
D. 开展团队建设活动
【单选题】
CCE150、一名新项目经理负责管理一个处于执行阶段的项目,为避免中断正在进行中的工作,项目经理首先该怎么做?___
A. 更新变更控制日志。
B. 实施整体变更控制过程。
C. 修订相关方登记册。
D. 审查风险登记册。
【单选题】
CCE151、一个项目已执行两年时间,项目团队遇到一个不可能克服的技术问题。项目发起人取消项目,因为项目超出预算,且如果不能解决这个问题,将无法继续进行。项目团队接下来应该怎么做?___
A. 等待项目经理确定下一步行动。
B. 在最终项目报告中记录取消原因。
C. 继续调查该问题,确定是否能够解决。
D. 将项目文档归档以备将来使用。
【单选题】
CCE152、一名关键项目团队成员拒绝为某项具体任务工作,项目经理选择推迟到第二天继续讨论该问题。项目经理使用的是哪种冲突管理技术?___
A. 合作/解决问题
B. 强迫/命令
C. 缓解/包容
D. 撤退/回避
【单选题】
CCE153、项目经理邀请客户参加月会,但客户不常参加。项目经理应该怎么做?___
A. 继续邀请客户。
B. 更新风险登记册。
C. 将该问题上报给项目发起人。
D. 审查并更新沟通管理计划。
【单选题】
CCE154、在准备项目A的资源管理计划时,项目经理发现IT总监需要一名特定资源。由于需要该资源的日期未知,未将该资源包含在进度计划中。日期确定之后,项目经理得知该资源已被分配到项目B工作六个月,没有其他可用资源了。项目A必须在六个月内完成,但是项目B的发起人拒绝接受任何可能延迟他们项目的风险。项目经理A下一步应该怎么做?___
A. 向指导委员会建议取消项目A。
B. 建议指导委员会召开一次由两个项目的发起人参加的会议。
C. 建议培训项目A的团队成员获得必要技能。
D. 建议IT总监招募一名后备资源。
【单选题】
CCE155、采购新设备并升级现有装置的采购订单已提交。在延期一个月后,要求供应商提交状态更新。供应商答复说,由于库存短缺,还将延迟两个月才能交付。这将对项目进度计划造成不利影响。项目经理应该怎么做?___
A. 通知相关方,并提交变更请求,
B. 确认合同条款和条件。
C. 取消当前采购订单,并选择新供应商。
D. 更改采购管理计划包含这个延期。
【单选题】
CCE156、项目经理正在实施一项对公司经营至关重要的新软件应用程序。在风险分析期间,由于项目所在地能源供应问题,一名团队成员识别到一个高发生概率的电气故障风险。这可能影响服务器,让应用程序不可用。项目发起人同意建立一个备用辅助站点。这使用的是什么风险应对策略?___
A. 转移
B. 接受
C. 回避
D. 减轻
【单选题】
CCE157、一家公司的副总裁(VP)刚刚得知计划在下个月的产品发布延期了。这个产品是副总裁完成今年战略目标的主要驱动因素。分发所有月度项目状态报告时,副总裁均已包含在分发名单内。若要改善未来与该副总裁的工作关系,项目经理应该使用什么工具或技术?___
A. 人际关系技能
B. 沟通方法
C. 权力/利益方格
D. 专家判断
【单选题】
CCE158、项目经理完成一个软件项目的开发,比进度计划提前一个月。这使得现在可以将一个原本超出范围的额外模块包含在内,并且项目仍然满足交付期限。项目经理下一步应该怎么做?___
A. 进入收尾阶段,为组织节省资金。
B. 向变更控制委员会(CCB)提交一份变更请求。
C. 寻求项目发起人的决定。
D. 交付额外模块。
【单选题】
CCE159、在项目实施期间,一名相关方指出某些可交付成果不符合规范要求。项目经理表示这些规范要求已在项目会议上讨论过,并已沟通了约定成果,记录在发布的报告中。为避免这种结果,在规划阶段应完成哪一项工作?___
A. 在相关方管理计划中分析沟通需求
B. 将相关方包含在质量管理计划准备过程中
C. 没有必要采取任何行动;相关方应已查看分发的所有信息
D. 在项目启动大会上公布可交付成果和期望
【单选题】
CCE160、担心项目无关的邮件数量,一名团队成员认为其中一个可交付成果将延迟,因为时间都花在阅读和回复邮件上。项目经理应该怎么做?___
A. 要求团队成员加班完成工作。
B. 要求项目团队更改项目沟通管理计划。
C. 与项目团队一起巩固时间管理计划指南。
D. 与项目团队一起巩固沟通管理计划指南。
【单选题】
CCE161、新项目包括来自不同国家、带有不同期望的相关方。若要确保所有相关方都能获得项目状态的通知,项目经理应该怎么做?___
A. 制定沟通管理计划。
B. 制定项目章程。
C. 制定相关方登记册。
D. 制定相关方管理计划。
【单选题】
CCE162、本地供应商无法满足交付日期。项目团队没有预计到这个产品供应的新威胁。进口该产品将让项目成本比使用本地供应商的花费贵两倍。项目经理应使用什么来为这项工作提供资金?___
A. 应急储备
B. 项目预算储备
C. 管理储备
D. 风险应对储备
【单选题】
CCE163、一个项目在接近完工时被取消了。在遣散项目团队之前,项目经理应确保解决下列哪一项?___
A. 完成绩效审查并向顾问付款。
B. 通知项目发起人,并更新项目管理计划和项目文件。
C. 执行经验教训和庆祝团队成就。
D. 保留中间阶段产品,并处理行政收尾。
【单选题】
CCE164、在为一项已获批准的变更请求工作时,项目团队添加了一个不属于已批准变更请求的功能。项目经理认为这项功能将十分有益。若要管理这个额外的变更,项目经理下一步应该做什么?___
A. 提交一份新的变更请求用户批准。
B. 执行相关方分析。
C. 将额外功能记录作为原始变更请求的组成部分。
D. 咨询项目发起人。
【单选题】
CCE165、项目经理开始一个建设新厂房的项目。客户提出如果修改项目基准,项目经理必须经过多级审批。为了记录这些审批环节,项目经理应制定下列哪一项?___
A. 变更控制程序
B. 问题日志
C. 相关方管理计划
D. 相关方登记册
【单选题】
CCE166、.在新产品开发项目期间,政府颁布新的法规,提高了零件进口关税。项目经理下一步该怎么做?___
A. 向变更控制委员会提交变更请求。
B. 询问发起人应如何解决这个问题。
C. 评估风险登记册。
D. 使用应急预算。
【单选题】
CCE167、一个全球性项目拥有分布多个地点的项目团队,对整个项目管理计划没有可加性,包括里程碑和项目期望。在项目期间,项目经理意识到这是个错误,且所有信息应与所有项目团队分享,无论所在位置在哪。项目经理应在何时与项目团队共享信息?___
A. 在项目团队发展期间
B. 在项目启动阶段
C. 在每次状态审查会上
D. 在项目启动大会上
【单选题】
CCE168、项目团队安装一个新的操作系统。实施之前,该团队在一个较小独立的网络中测试该系统,并发现一些问题。发现这些问题的解决方案之后,团队仍然碰到实施问题。然而,问题数量和严重程度大大降低。项目团队使用的是下列哪一项?___
A. 转移风险
B. 减轻风险
C. 接受风险
D. 避免风险
【单选题】
CCE169、在一个职能型组织结构中,拥有关键完工日期的项目落后于进度,但是按照挣值分析,目前仍低于预算。为了按时交付项目,项目经理建议增加五个技能娴熟的资源。项目经理下一步该怎么办?___
A. 更新资源管理计划和进度基准。
B. 将变更单提交给变更控制委员会批准。
C. 向项目发起人提交变更请求,用于批准。
D. 增加额外的资源,因为有充足的可用资金。
【单选题】
CCE170、评估项目需求之后,项目经理决定招募一名主题专家,而该主题专家将采用虚拟方式工作。为制定项目沟通计划,项目经理应该怎么做?___
A. 召开会议,并要求内部团队成员促进与虚拟团队成员的沟通。
B. 采用其它措施,设定明确的期望,并澄清团队成员之间的沟通方式。
C. 更新风险管理计划并与客户进行沟通。
D. 让内部团队和虚拟团队遵循相同的沟通流程。
【单选题】
CCE171、一名相关方联系项目经理询问为什么项目团队在进度计划中签发了一项变更,项目经理认为之前已与该相关方讨论过变更,但是相关方回忆不起对话。若要在将来避免这个问题,项目经理应该采取什么不同措施?___
A. 召开焦点小组会议。
B. 创建一份问题日志。
C. 选择不同的媒介。
D. 实行推进技术。
【单选题】
CCE172、在一个施工项目上,一名工会代表抱怨为其中一些资源所安排的工作。若要解决这种情况,项目经理应该怎么做?___
A. 与工会代表一起修订范围管理计划来解决这个冲突。
B. 利用相关方参与项目管理。
C. 联系人力资源部门获得指导意见。
D. 识别关键问题,并对替代决定排列优先顺序。
【单选题】
CCE173、项目团队拥有从各个研讨会、焦点小组和头脑风暴会议收集的大量数据。他们很高兴能利用这些数据为项目创建一个创新产品。项目团队如何才能确保范围与产品需求挂钩?___
A. 制作一份背景图作为参考。
B. 制作原型进行业务批准。
C. 制定产品需求基准。
D. 起草一份需求跟踪矩阵。
【单选题】
CCE174、一名新项目发起人接管一个处于执行阶段的项目。项目发起人要求项目经理停止批准项目资源时间表。相反,发起人将该任务分配给另一名团队成员。若要重新确立控制权,项目经理下一步应该做什么?___
A. 组织与项目发起人召开会议,确定新的批准流程。
B. 遵循新项目发起人的指标,将任务委托给团队成员。
C. 让项目发起人参考资源管理计划,
D. 让项目发起人参考项目章程中提供的职权。
【单选题】
CCE175、一家公司启动了一个信息技术服务开发项目。在风险评估期间,项目团队识别到硬件小组没有足够的资源按时完成其中一项可交付成果。为了按进度完成可交付成果,项目经理计划使用某个供应商的服务。项目经理计划使用哪种风险应对策略?___
A. 转移
B. 规避
C. 开拓
D. 减轻
【单选题】
CCE176、出于个人原因,项目发起人通知项目经理更换表现良好的团队成员。项目经理下一步该怎么做?___
A. 与发起人讨论重新考虑这个请求,因为团队成员表现良好,对项目成功有价值。
B. 只有对项目有利,才接受项目发起人的请求。
C. 接受项目发起人的请求,并使用合格资源更换团队成员。
D. 忽视项目发起人的请求,因为项目经理负责该资源。
【单选题】
CCE177、高级管理团队、项目发起人和项目经理在计划完工日期之前六个月终止一个项目。项目经理下一步该怎么做?___
A. 审查问题日志并尝试结束所有悬而未决的问题,如有的话。
B. 制定程序调查并记录活动原因。
C. 用经验教训和历史信息更新知识库。
D. 解散团队成员,让其为其他项目工作。
【单选题】
CCE178、一家全球性公司正处于部署一项产品的项目中途。然而,该产品的制造商发布了一个新版本。新版本必须安装在任何新部署的产品上。该产品的一个关键部件未在新版本上测试。公司希望在10月31日之前,赶在假日购物季时,在所有门店推出这项新产品。额外的测试会将项目的最终完成日期推迟一个月。项目经理应该怎么做?___
A. 暂停部署,直至10月31日之后,并利用这段时间完成必要的测试。
B. 向可用资源提交一项变更请求,在新版本中测试并执行。
C. 更新项目管理计划,包含测试,并修订进度计划,在10月31日之前部署大部分产品。
D. 在10月31日之前部署产品,并在部署完之后完成测试。
【单选题】
CCE179、一个项目拥有固定完工日期。从之前的经验看,该客户以不断要求修改项目可交付成果而出名,这会增加无法满足项目期限的风险。为避免这个风险,项目经理应该怎么做?___
A. 执行风险分析并将结果发送给客户,强调无法满足项目期限的高可能性。
B. 制定一份变更管理计划,要求联合批准变更,并将其提交给相关方批准。
C. 使用关键路径制定进度计划,并将其提交给客户,证明无变更浮动时间。
D. 通知客户项目期间不接受任何变更,除非进行合同评审。
【单选题】
CCE180、在项目实施阶段,项目经理必须沟通范围变更,并获得跨国关键相关方的批准。项目经理应采用下列哪一种沟通方法?___
A. 推式沟通
B. 交互式沟通
C. 相关方沟通
D. 拉式沟通
【单选题】
CCE181、在项目执行期间,一名外部相关方反对一项重大范围变更。除非重新评估相关方的决定,否则项目进展将受到影响。项目经理下一步该怎么做?___
A. 审查相关方管理计划评估影响。
B. 请求项目发起人解决相关方的问题。
C. 修订预算,反映可选方案的成本。
D. 调查相关方反对背后的理由。