【单选题】
What is a potential downside of having more than four paths per datastore?___
A. limits the storage protocols
B. increases storage latency for VM
C. limits the path selection policies
D. limits the number of LUNs per host
查看试卷,进入试卷练习
微信扫一扫,开始刷题

答案
D
解析
暂无解析
相关试题
【单选题】
Which feature facilitates the sharing of templates via vCenter Server?___
A. Content Library
B. OVF
C. folders
D. vApp
【单选题】
A vSphere Administrator is in the process of configuring replication for a virtual machine, but is not able to select the Recovery Point Objective (RPO) value of 5 minutes. Which statement could explain why the RPO value cannot be lower than 15 minutes?___
A. The OS quiescing option is selected for Replication options.
B. The virtual machine hardware version is not compatible.
C. The target and source sites use different types of datastores.
D. The target and source sites are not using VMFS 6.0 datastore.
【单选题】
What advanced parameter defines a custom isolation IP address for a vSphere HA cluster?___
A. das.usedefaultisolationaddress
B. das.isolationshutdowntimeout
C. fdm.isolationpolicydelaysec
D. das.isolationaddress
【单选题】
Which method is supported for backing up the virtual machine that contains vCenter Server?___
A. differential
B. incremental
C. full image
D. individual disks
【单选题】
A vSphere Administrator must ensure that a user is able to view and manage the system configuration in vSphere Web Client. In the vCenter Single Sign-On domain, which group should the user be a part of?___
A. SystemConfiguration.BashShellAdministrators
B. ComponentManager. Administrators
C. Administrators
D. SystemConfiguration.Administrators
【单选题】
What is the minimum number of hosts that must contribute capacity to a non-ROBO single site VMware vSAN cluster?___
A. 1
B. 64
C. 3
D. 2
【单选题】
Which guest operating system supports PVRDMA?___
A. Windows (32-Bit)
B. Linux (32-Bit)
C. Windows (64-Bit)
D. Linux (64-Bit)
【单选题】
What is the correct way to replace the certificate on an existing vCenter Server that is part of a vCenter HA configuration?___
A. Put the vCenter HA in Maintenance mode, replace the certificate, exit Maintenance mode.
B. Shut down Passive and Witness nodes and replace the certificate on the Active node.
C. Remove the Passive and Witness nodes, replace the certificate, reconfigure the cluster.
D. Replace the certificate while all nodes are participating in the cluster.
【单选题】
The vSphere Data Protection performance analysis results in the “Conditionally Passed” status. What can cause this condition?___
A. The results did not meet the minimum performance expectations.
B. The read, write, and seek tests were successful.
C. The read and write tests were successful but the seek test failed.
D. The read and write tests were successful but the seek test skipped.
【单选题】
A vSphere Administrator wants to reserve 0.5 Gbps for virtual machines on each uplink on a disturbed switch that has 10 uplinks. What is the quota that should be reserved for the network resource pool?___
A. 10 Gbps
B. 5 Gbps
C. 100 Gbps
D. 0.5 Gbps
【单选题】
A vSphere administrator manages a cluster which includes critical and non-critical virtual machines. The cluster requires different permissions for contractors and non-contractors. How can the administrator exclude the contractor group from some of the critical VMs?___
A. Apply permission for both contractors and non-contractors on the cluster level.
B. Apply permission for both contractors and non-contractors on the cluster level. Remove permission on the critical VMs for contractors.
C. Remove permission for contractors on the cluster level. Apply permission on the critical VMs for noncontractors.
D. Apply permission for both contractors and non-contractors on the VMs. Remove permission on the critical VMs for contractors.
【单选题】
In an ESXi 6.5 cluster only "NFS datastore has running or registered virtual machines" returns. A vSphere HA cluster with four hosts has admission control configured to tolerate one host failure. Which statement is true if a fifth host is added?___
A. CPU and Memory capacity will be set to 50%.
B. CPU and Memory capacity will be set to 30%.
C. CPU and Memory capacity will be set to 25%.
D. CPU and Memory capacity will be set to 20%.
【单选题】
Which command can be run to troubleshoot connectivity problems with vmkernal network interfaces?___
A. esxcli network
B. vmkping
C. net-status
D. vicfg-vmknic
【单选题】
What counter should an administrator check to determine if a virtual machine is ballooning?___
A. swapinRate
B. vmmemctltarget
C. swapped
D. vmmemctl
【单选题】
By default, how often is the vCenter vpx user password automatically changed?___
A. 15 days
B. 60 days
C. 30 days
D. 45 days
【单选题】
Which metric in the Exhibit would identify high latency for a virtual machine operating system?___
A. QAVG/cmd
B. KAVG/cmd
C. DAVG/cmd
D. GAVG/cmd
【单选题】
What VM Monitoring setting would ensure that the failure interval for a virtual machine is defined as 120 seconds?___
A. High
B. Normal
C. Low
D. Medium
【单选题】
The business managers have asked the IT administrator to ensure configuration compliance in the vSphere infrastructure. The IT administrator wants to use Host Profiles to accomplish this, but is unable to do so. Why is the administrator unable to use Host Profiles?___
A. The infrastructure uses a vSphere Standard license.
B. The infrastructure has servers with various CPU families.
C. The user has only the “Administrator” role.
D. Host Profiles apply only to storage settings.
【单选题】
What is the result of a “Consolidate” action on a virtual machine?___
A. All snapshots on the virtual machines will be deleted.
B. The virtual machine will be reverted to its last snapshot.
C. Redundant delta disks will be combined and deleted.
D. A new snapshot with memory state will be created.
【单选题】
A Telco customer is implementing NFV using vSphere as the virtualization platform. Which feature can help achieve a high packet rate with lower CPU consumption?___
A. Network I/O Control
B. SplitRX
C. ERSPAN
D. LACP
【单选题】
What is the VMware-recommended best practice for Fibre Channel zoning?___
A. soft zoning
B. single-initiator-multiple-target zoning
C. single-initiator zoning
D. single-initiator-single-target zoning
【单选题】
How can a vSphere administrator ensure that a set of virtual machines run on different hosts in a DRS cluster?___
A. Use a VM-Host affinity rule.
B. Add the VMs to a vApp.
C. Use a VM-VM affinity rule.
D. Place the VMs in different folders.
【单选题】
vCenter Server Appliance Instance can be backed up using which Client Interface?___
A. vSphere Client Interface
B. vSphere Web Client Interface
C. VMware Host Client Interface
D. Virtual Appliance Management Interface
【单选题】
What tool can capture network traffic at the uplinks, or vSwitch, or virtual port levels?___
A. tcpdump-uw
B. wireshark
C. pktcap-uw
D. pcap
【单选题】
Which storage feature always requires the use of third-party software on ESXi?___
A. Hardware Acceleration for NAS devices
B. VVOL
C. Hardware Acceleration for Block
D. evices
【单选题】
An ESXi host's VMCA-Signed certificate has expired. How can the certificate be renewed?___
A. In the vSphere Web Client, browse to the host in question. Click the Manage tab and select settings. Select System and click Certificate, then click the Renew button.
B. In the vSphere Web Client, browse to the host in question. Click the Manage tab and select settings. Select System and click Certificate, then click the Refresh CA Certificates button.
C. Run the command /sbin/generate-certificates on the affected host.
D. Disconnect the host from vCenter Server and reconnect it.
【单选题】
Which is the correct order for upgrading vSphere components?___
A. vCenter Server, ESXi hosts, VMware Tools, Virtual Machine hardware
B. VMware Tools, Virtual Machine hardware, ESXi hosts, vCenter Server
C. vCenter Server, Virtual Machine hardware, VMware tools, ESXi hosts
D. ESXi hosts, vCenter Server, Virtual Machine hardware, VMware Tools
【单选题】
Which iSCSI initiator type can be used with any network interface card?___
A. Software iSCSI initiator
B. Software FCoE adapter
C. Hardware Independent iSCSI initiator
D. Hardware Dependent iSCSI initiator
【单选题】
An administrator is attempting to power on a virtual machine with 32GB of memory. The operation fails with the following error: <Could not power on VM: No space left on device> <Checking the space on the virtual machine's datastore, there is 30GB free.> Which action would allow the VM to power on?___
A. Set a 2GB memory reservation on the VM.
B. Mount the virtual disk from the affected VM on to another virtual machine and free up space from within the OS.
C. Enable vSphere HD admission control on the cluster in which the VM resides.
D. Set a 2GB memory limit on the VM.
【单选题】
An administrator attempts to manually reclaim space on thin-provisioned VMFS6 volumes but finds that no additional space is being recovered. Which could be causing this?___
A. vSphere 6.5 does not support manual UNMAP.
B. The manual UNMAP operation has been moved to the vSphere web client.
C. The VASA version is use is incompatible.
D. UNMAP is automated for VMFS6.
【单选题】
An administrator has upgraded to vSphere 6.5 and also wants to use Kerberos authentication for NFS. Which can be done to the existing NFSv3 volumes to enable this feature?___
A. Perform a storage rescan on VMFS volumes.
B. Unmount the NFSv3 datastore, and then mount as NFSv4.1 datastore.
C. Nothing. All NFSv3 mounted datastores are upgraded automatically during vSphere upgrades.
D. Perform a scan of new storage devices.
【单选题】
An administrator wants to restore the vCenter Server Appliance 6.5 from backup. Where can this be accomplished?___
A. from the ESXi Host Client
B. from the VMware vSphere Appliance Management Interface
C. from within the VMware vSphere Web Client
D. from the vCenter Server Appliance Installer
【单选题】
The administrator wants to power on VM-K2, which has a 2GHz CPU reservation. VM-M1, VM-M2, and VM-K1 are all powered on. VM-K2 is not powered on. The exhibit shows the parent and child resource reservations. If Resource Pool RP-KID is configured with an expandable reservation, which statement is true?___
A. VM-K2 will be unable to power on because there are insufficient resources.
B. VM-K2 will be able to power on since resource pool RP-KID has 2GHz available.
C. VM-K2 will be unable to power on because only 2GHz are reserved for RP-KID.
D. VM-K2 will receive resource priority and will be able to power on this scenario.
【单选题】
Which is the block size on the VMFS6 datastore?___
A. All small and large file blocks are 8MB.
B. All small and large file blocks are 1MB.
C. Small file blocks are 512KB. large file blocks are 64MB.
D. Small file blocks are 1MB, large file blocks are 512MB.
【单选题】
When installing vCenter Converter Standalone, why must an administrator perform a client-server installation instead of a local installation?___
A. to manage conversion tasks remotely
B. to convert virtual machines as well as physical machines
C. to allow installation of the Converter agent on remote source machines
D. to hot clone physical or virtual machines
【单选题】
Which is required by vCenter Converter Standalone to convert a physical Red Hat Enterprise Linux 7 machine to a virtual machine?___
A. The Linux machine must be powered off.
B. The Linux machine must have the SSH daemon started.
C. The Linux machine must use a static IP address.
D. The Linux machine must have a fully-qualified domain name.
【单选题】
An administrator is troubleshooting network communications between a vCenter Server and an ESXi 6.5 host. Which log shows the related events between these components?___
A. /var/log/fdm.log
B. /var/log/vpxa.log
C. /var/log/hostd.log
D. /var/log/auth.log
【单选题】
An administrator has recently upgraded from vSphere 6.0 to 6.5, and can no longer see the software iSCSI named vmhba33. Which could be the reason for this?___
A. The upgrade has changed the vmhba name.
B. vSphere 6.5 automates iSCSI configurations.
C. vSphere 6.5 no longer supports software iSCSI.
D. The upgrade has deleted the vmhba.
【单选题】
An administrator is trying to vMotion a VM from his datacenter to a recovery site. Which is the maximum allowed RTT (Round-Trip Time) latency between source and destination host?___
A. 100 milliseconds
B. 150 milliseconds
C. 15 milliseconds
D. 10 milliseconds
【单选题】
Which is required for configuring iSCSI Software Adapter network port binding?___
A. VMkernel of the iSCSI traffic must be load balanced using Route based on IP Hash algorithm.
B. VMkernel of the iSCSI traffic must be load balanced using Route based on Source Virtual Port ID algorithm.
C. VMkernel of the iSCSI traffic must be load balanced using Route based on Source MAC Hash algorithm.
D. VMkernel of the iSCSI traffic must be bound to only one active network adapter.
推荐试题
【多选题】
冷箱系统压差过大、温度分布异常可能的原因有___。
A. 氢气外送量过小
B. 裂解气干燥器出口水含量超标,冷箱冻塔
C. 冷箱系统过滤器堵塞
D. 冷箱系统冷剂调节幅度过大
【多选题】
裂解气干燥器出口水分提前不合格的处理方法有___。
A. 联系压缩岗位将裂解气的温度调至正常
B. 控制再生条件,保证再生合格后才能投用
C. 如分子筛破碎严重,更换分子筛
D. 如因压缩碱洗不合格而中毒,则调整碱洗合格并切换至备用台
【多选题】
关于硫化氢的中毒症状及危害,下列说法正确的有___。
A. 短时间接触少量的硫化氢即能引起死亡或永久性的损伤
B. 在20-150ppm时就会刺眼睛
C. 在500ppm下停留半小时,就会头疼、怕光、腹泻等症状
D. 在800-1000ppm下停留半小时,就会引起死亡
【多选题】
冷箱系统压差过大、温度分布异常可能的原因有___。
A. 氢气外送量过小
B. 裂解气干燥器出口水含量超标,冷箱冻塔
C. 冷箱系统设备、管线堵塞
D. 冷箱系统冷剂调节幅度过大
【多选题】
碳二加氢反应器入口一氧化碳含量高导致出口分析乙炔不合格,正确的处理方法是___。
A. 适当减小氢炔比
B. 检查碱洗塔运行状况
C. 适当提高入口温度
D. 联系裂解炉岗位检查COT或裂解炉注硫量
【多选题】
前脱丙烷前加氢工艺中碳二加氢反应器出口分析不合格正确的处理方法是___
A. 判断如催化剂中毒,则压缩调整碱洗
B. 氢气纯度不够,可调整冷箱温度至合格
C. 催化剂活性低,可适当提高入口温度
D. 出口乙炔过高应切出反应器
【多选题】
当丙烯制冷压缩机停车后,分离系统作紧急停车处理,下列处理正确的是___。
A. 碳二加氢反应器紧急停车
B. 脱乙烷塔汽提操作
C. 乙烯精馏塔紧急停车
D. 脱甲烷塔汽提操作