【判断题】
转子材质的不均匀将会影响高速机械转子精度
A. 对
B. 错
查看试卷,进入试卷练习
微信扫一扫,开始刷题

答案
A
解析
暂无解析
相关试题
【单选题】
What happens to the status of users already logged into ESXi Shell when a vSphere administrator enables lockdown mode?___
A. Users remain logged in and can run commands, except to disable lockdown mode.
B. Users remain logged in and can run commands, including disabling lockdown mode.
C. Users are immediately logged out of ESXi Shell.
D. Users are logged out after a timeout specified by the vSphere administrator.
【单选题】
What is the effective vSphere licensing level during the 60 day evaluation period?___
A. vSphere Foundation Essentials Plus
B. vSphere Standard
C. vSphere Enterprise
D. vSphere
E. nterprise Plus
【单选题】
To comply with security requirements, an administrator with a vCenter Server Appliance needs to force logoff of the vSphere web client after 10 minutes of inactivity.What should the administrator do to meet the requirement?___
A. Edit: /var/lib/vmware/vsphere-client/webclient.properties, modify session.timeout=10
B. Edit: /opt/vmware/vsphere-client/webclient.properties, modify session.timeout=600
C. Edit: /var/lib/vmware/vsphere-client/webclient.properties modify session.timeout=600
D. Edit: /opt/vmware/vsphere-client/webclient.properties, modify session.timeout=10
【单选题】
An administrator enables High Availability (HA) on a Virtual SAN cluster.Which network is used for HA Network Heatbeat configuration?___
A. The Management network.
B. The vMotion network.
C. The Virtual SAN network.
D. The Provisioning Traffic network.
【单选题】
A user wants to monitor a business-critical virtual machine to ensure that it doesn't run out of resources. What metric could be monitored in vRealize Operations to address this concern?___
A. Time Remaining badge
B. Compliance badge
C. Reclaimable Waste badge
D. Density badge
【单选题】
An administrator has recently installed a new ESXi 6.x Host, and during the configuration notices sporadic network problems. To check whether the issue occurred sometime during the configuration, the administrator would like to reset the system.How can this be accomplished in the shortest amount of time?___
A. Run the ESXi installer again and reinstall the host.
B. Select the Reset System Configuration option from the vSphere Client when connected directly to the host.
C. From the
D. irect Console User Interface, select Reset System Configuration.
【单选题】
A vApp is running out of compute resources when overall activity is high within the resource pool. At other times, everything is fine.What should be done to resolve this issue?___
A. Increase the size of the resource pool Shares.
B. Set the vApp's CPU and Memory Reservation Type to Expandable.
C. Set the vApp's CPU and Memory Limit to Unlimited.
D. Create a new resource pool with the existing hardware configuration.
【单选题】
A virtual machine has been renamed and an administrator is unable to find files with the new virtual machine name in the datastore.What is the reason for this?___
A. The names of the files on the datastore do not change.
B. The names of the files on the datastore have been corrupted.
C. The virtual machine needs to be re-added to the inventory.
D. The Distributed Resource Scheduler moved the virtual machine to another host.
【单选题】
An administrator has configured network connectivity for a new virtual machine, as shown in the Exhibit.What will occur with the network traffic of this virtual machine when communicating externally from vSwitch1?___
A. The virtual machine will communicate on both uplinks
B. The virtual machine will only communicate on vmnic1
C. The virtual machine will only communicate on vmnic2
D. The virtual machine will fail to communicate externally
【单选题】
An administrator is unable to create the first group in a new vRealize Operations environment. What is the likely cause of the problem?___
A. There are no group types defined.
B. The group is not defined in SSO.
C. There are more than 32 group types defined.
D. The description for the group is not provided.
【单选题】
A new vApp was built and tested in the corporate headquarters datacenter running vSphere 6.x. What condition would explain why the virtual machine is failing to boot in an offsite datacenter running on vSphere 5.5?___
A. The virtual machine was built with the default hardware version.
B. The VMFS 5 datastore is not compatible with virtual machines configured with vSphere 6.x.
C. a
D. RS 5.5 cluster cannot run virtual machines configured with vSphere 6.x.
【单选题】
An administrator is evaluating whether to deploy vCenter Server on a Windows server or on a vCenter Server appliance. The administrator has the following requirements: <A web browser will be utilized to manage the vSphere environment.> <16 ESXi hosts will be deployed.> <Licenses must be shared with a vCenter Server at another site.> <An external Oracle 10g database server will be used to host the vCenter Server database.> Why will the administrator need to deploy vCenter Server on a Windows server?___
A. Linked Mode is a requirement for the solution.
B. Oracle 10g is a requirement for the solution.
C. The vSphere web client is a requirement for the solution.
D. Management of more than 5 hosts is a requirement for the solution.
【单选题】
What is a benefit of using VMware Data Protection ?___
A. Provides support for guest-level backups and restores of Microsoft SQL Servers, Exchange Servers, and Share Point Servers.
B. Provides support for advanced storage services including replication, encryption, deduplication, and compression.
C. Provides direct access to VDP configuration integrated into the vSphere Client.
D. Reduces disk space consumed by virtual machine data using deduplication.
【单选题】
An administrator enables vSphere High Availability (HA) on an existing cluster with a large number of hosts and virtual machines. The administrator notices that the setup of vSphere HA on some of the hosts is failing. What step, if taken, might resolve this issue?___
A. Increase the value of the config.vpxd.das.electionWaitTimeSec setting.
B. Set the value of vpxd.das.aamMemoryLimit to 256.
C. Set the value of the das.useDefaultIsolationAddress setting to False.
D. Increase the value of the das.iostatsinterval setting.
【单选题】
An ESXi 6.x host consists of 24 logical cores. Hyperthreading is enabled on the host. What is the maximum number of vCPUs that can be assigned to a virtual machine on this host?___
A. 24
B. 48
C. 64
D. 128
【单选题】
By default, each ESXi 6.x host is provisioned with a certificate from which root certificate authority?___
A. RedHat Certificate Authority
B. VMware Certificate Authority
C. DigiCert Certificate Authority
D. Verisign Certificate Authority
【单选题】
An administrator is adding an NFS datastore as shown in the Exhibit. What is the purpose of the Servers to be added list?___
A. It contains the IP addresses of the NFS Storage Server to provide multipathing capability.
B. It contains the IP addresses of the ESXi hosts that mount the datastore.
C. It contains the IP addresses used for
D. ynamic Discovery of targets.
推荐试题
【单选题】
下列关于APU说法正确的是:___
A. APU在任何工作状态下都可以提供引气或电源
B. 若ECB故障,则APU无法正常工作
C. 要关断APU,务必先关断APU的引气或电源负载
D. APU的正常工作转速是101%
【单选题】
APU的燃烧室内点火嘴和燃油喷嘴的数量是?___
A. 一个点火嘴,六个燃油喷嘴
B. 两个点火嘴,六个燃油喷嘴
C. 一个点火嘴,十个燃油喷嘴
D. 两个点火嘴,十二个燃油喷嘴
【单选题】
当按压住APU燃油放气按钮(8QC)时,会如何___
A. 仅APU燃油低压valve打开
B. 仅APU燃油泵运转
C. APU燃油低压valve打开,APU燃油泵运转
D. ECB通电
【单选题】
APU供气时,交输valve选择器放在自动位,当右大翼气源管道发生渗漏,则以下说法不对?___
A. 左发引气valve关闭
B. 右发引气valve关闭
C. 交输引气valve自动关
D. APU引气valve自动关闭
【单选题】
关于IGV说法不正确的是:___
A. 当APU引气负载valve关闭时,IGV关闭(22度)
B. 当APU提供引气用于空调时,IGV位置不受客舱温度选择值而影响
C. 当APU提供引气用于发动机起动(MES)时,IGV打开最大(88度)
D. IGV是由燃油作动力的
【单选题】
哪一个是APU起动时部件作动的顺序?___
A. 进气门打开,起动马达接通,然后是点火和供油;
B. 起动马达接通,进气门打开,然后是点火和供油;
C. 进气门打开,点火,起动机马达接通,供油
D. 点火,供油,然后是起动马达接通和进气门打开。
【单选题】
在何时ECAM状态显示器上的APU排气温度指示变成红色:___
A. 排气温度≥715℃(APU工作)
B. 排气温度≥1038℃(APU工作)
C. 排气温度≥711℃(APU工作,外部空气温度15℃或
D. 排气温度≥1038℃(APU起动时)
【单选题】
关于APU主燃油总管和辅助燃油总管说法正确的是:___
A. 起动时,仅辅助燃油总管供油
B. 加速时,仅主燃油总管供油
C. APU引气供应空调时,主和辅助燃油总管供油
D. APU正常工作时由主燃油总管供油
【单选题】
哪一个是APU正常停车时部件作动的顺序?___
A. 防喘valve打开、超温和超速电路检查、燃油电磁阀关闭、滑油稀释电磁阀打开、进出气门关闭、燃油valve关闭。
B. 燃油电磁阀关闭、燃油valve关闭、防喘valve打开、超温和超速电路检查、滑油稀释电磁阀打开、进出气门关闭。
C. 滑油稀释电磁阀打开、燃油电磁阀关闭、防喘valve打开、超温和超速电路检查进出气门关闭、燃油valve关闭。
D. 防喘valve打开、超温和超速电路检查、燃油电磁阀关闭、燃油valve关闭、滑油稀释电磁阀打开、进出气门关闭。
【单选题】
哪一个是APU起动时的顺序?___
A. 主电门接通、进气门打开,起动电门接通、起动马达接通,然后是点火和供油;
B. 起动电门接通、起动马达接通,主电门接通、进气门打开,然后是点火和供油;
C. 起动电门接通、起动马达接通,然后是点火和供油,主电门接通、进气门打开
D. 起动电门接通,进气门打开,主电门接通、起动马达接通,然后是点火和供油;
【单选题】
当Air/OilCooler堵塞时___
A. 滑油泵将停止工作
B. APU滑油过热导致APU
C. 压力释放valve将释放滑油回到滑油泵的吸油侧
D. 滑油低压保护性停车