【判断题】
经执法部门、机构负责人集体研究做出的行政执法决定造成违法或不当行政执法行为的,主持研究的人员负主要责任,其他参与研究的人员和当事执法人员承担次要责任。
A. 对
B. 错
查看试卷,进入试卷练习
微信扫一扫,开始刷题

答案
A
解析
海事行政执法责任追究规定 海政法〔2017〕47号.第十三条 对应当追究行政执法责任的,按照下列原则具体确定责任的承担者:(五)经执法部门、机构负责人集体研究做出的行政执法决定造成违法或不当行政执法行为的,主持研究的人员负主要责任,其他参与研究的人员和当事执法人员承担次要责任;
相关试题
【判断题】
依据《海事行政执法证据管理规定》,收集、调取物证时,原物为数量较多的种类物的,可以采用拍照、取样、摘要汇编等方式收集。拍照取证的,应当对物证的现场方位、全貌以及重点部位特征等进行拍照或者录像。( )
A. 对
B. 错
【判断题】
依据《海事行政执法证据管理规定》,证人证言和当事人陈述应当附有证人或者当事人的身份证明文件的复印件。证人、当事人是船员的,船员证件可以作为其身份证明。( )
A. 对
B. 错
【判断题】
根据《航道通航条件影响评价审核管理办法》,审核部门在审核中认为必要的,可以采取专家咨询、委托第三方技术咨询机构开展技术咨询等方式。咨询费用由提交审核方负责支付。()
A. 对
B. 错
推荐试题
【单选题】
What happens to the status of users already logged into ESXi Shell when a vSphere administrator enables lockdown mode?___
A. Users remain logged in and can run commands, except to disable lockdown mode.
B. Users remain logged in and can run commands, including disabling lockdown mode.
C. Users are immediately logged out of ESXi Shell.
D. Users are logged out after a timeout specified by the vSphere administrator.
【单选题】
What is the effective vSphere licensing level during the 60 day evaluation period?___
A. vSphere Foundation Essentials Plus
B. vSphere Standard
C. vSphere Enterprise
D. vSphere
E. nterprise Plus
【单选题】
To comply with security requirements, an administrator with a vCenter Server Appliance needs to force logoff of the vSphere web client after 10 minutes of inactivity.What should the administrator do to meet the requirement?___
A. Edit: /var/lib/vmware/vsphere-client/webclient.properties, modify session.timeout=10
B. Edit: /opt/vmware/vsphere-client/webclient.properties, modify session.timeout=600
C. Edit: /var/lib/vmware/vsphere-client/webclient.properties modify session.timeout=600
D. Edit: /opt/vmware/vsphere-client/webclient.properties, modify session.timeout=10
【单选题】
An administrator enables High Availability (HA) on a Virtual SAN cluster.Which network is used for HA Network Heatbeat configuration?___
A. The Management network.
B. The vMotion network.
C. The Virtual SAN network.
D. The Provisioning Traffic network.
【单选题】
A user wants to monitor a business-critical virtual machine to ensure that it doesn't run out of resources. What metric could be monitored in vRealize Operations to address this concern?___
A. Time Remaining badge
B. Compliance badge
C. Reclaimable Waste badge
D. Density badge
【单选题】
An administrator has recently installed a new ESXi 6.x Host, and during the configuration notices sporadic network problems. To check whether the issue occurred sometime during the configuration, the administrator would like to reset the system.How can this be accomplished in the shortest amount of time?___
A. Run the ESXi installer again and reinstall the host.
B. Select the Reset System Configuration option from the vSphere Client when connected directly to the host.
C. From the
D. irect Console User Interface, select Reset System Configuration.
【单选题】
A vApp is running out of compute resources when overall activity is high within the resource pool. At other times, everything is fine.What should be done to resolve this issue?___
A. Increase the size of the resource pool Shares.
B. Set the vApp's CPU and Memory Reservation Type to Expandable.
C. Set the vApp's CPU and Memory Limit to Unlimited.
D. Create a new resource pool with the existing hardware configuration.
【单选题】
A virtual machine has been renamed and an administrator is unable to find files with the new virtual machine name in the datastore.What is the reason for this?___
A. The names of the files on the datastore do not change.
B. The names of the files on the datastore have been corrupted.
C. The virtual machine needs to be re-added to the inventory.
D. The Distributed Resource Scheduler moved the virtual machine to another host.
【单选题】
An administrator has configured network connectivity for a new virtual machine, as shown in the Exhibit.What will occur with the network traffic of this virtual machine when communicating externally from vSwitch1?___
A. The virtual machine will communicate on both uplinks
B. The virtual machine will only communicate on vmnic1
C. The virtual machine will only communicate on vmnic2
D. The virtual machine will fail to communicate externally
【单选题】
An administrator is unable to create the first group in a new vRealize Operations environment. What is the likely cause of the problem?___
A. There are no group types defined.
B. The group is not defined in SSO.
C. There are more than 32 group types defined.
D. The description for the group is not provided.
【单选题】
A new vApp was built and tested in the corporate headquarters datacenter running vSphere 6.x. What condition would explain why the virtual machine is failing to boot in an offsite datacenter running on vSphere 5.5?___
A. The virtual machine was built with the default hardware version.
B. The VMFS 5 datastore is not compatible with virtual machines configured with vSphere 6.x.
C. a
D. RS 5.5 cluster cannot run virtual machines configured with vSphere 6.x.
【单选题】
An administrator is evaluating whether to deploy vCenter Server on a Windows server or on a vCenter Server appliance. The administrator has the following requirements: <A web browser will be utilized to manage the vSphere environment.> <16 ESXi hosts will be deployed.> <Licenses must be shared with a vCenter Server at another site.> <An external Oracle 10g database server will be used to host the vCenter Server database.> Why will the administrator need to deploy vCenter Server on a Windows server?___
A. Linked Mode is a requirement for the solution.
B. Oracle 10g is a requirement for the solution.
C. The vSphere web client is a requirement for the solution.
D. Management of more than 5 hosts is a requirement for the solution.